Advises of NRC Planned Insp Effort Resulting from 961103 Arkansas Nuclear One Sppr Review
ML20135A367
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 11/27/1996
From: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Hutchinson C
ENTERGY OPERATIONS, INC.
References
NUDOCS 9612030194
Download: ML20135A367 (6)


Text

{{#Wiki_filter:. . tP "% t UNITED STATES

 ?                4                NUCLEAR REGULATORY COMMISSION REGloN Iv S A  -    '

f 611 RYAN PLAZA DRIVE. SUITE 400 k ***** 8 AR LINGToN, TE XAS 76011 8064 t10V 2 71996 C. Randy Hutchinson, Vice President Operations

       - Arkansas Nuclear One Entergy Operations, Inc.

1448 S.R. 333 Russellville, Arkansas 72801-0967

SUBJECT:

SEMIANNUAL PLANT PERFORMANCE REVIEW (SPPR)- ARKANSAS NUCLEAR ONE On November 3,1996, the NRC staff completed the Semiannual Plant Performance Review (SPPR) of Arkansas Nuclear One. The staff conducts these~ reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by NRC management to facilitate planning and allocation of inspection resources. The SPPR for Arkansas Nuclear One involved the-participation of all technical divisions in evaluating inspection results and safety performance information for the period March through October 1996. SPPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and Senior Management Meeting (SMM) reviews. This letter advises you of our planned inspection effort resulting from the Arkansas Nuclear One SPPR review. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan for the next 8 months.

       - The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas. An agency initiative to conduct a safety system functionalinspection with a design focus is scheduled. Additionally, regional initiative inspection is scheduled along with the core inspection to better understand potentially declining performance in the area of design changes and safety evaluations. Resident inspections are not listed due to their ongoing and continuous nature.

We willinform you of any changes to the inspection plan. If you have any questions, please contact E. Collins of my staff at (817) 860-8291. Sincerely, J. E. yer, Director h) Division of Reactor Projects 9612030194 961127 PDR ADOCK 05000313 G PDR

Arkansas Nuclear One

Enclosure:

Inspection Plan Docket Nos.: 50-313 50-368-License Nos.: DPR-51 NPF-6 cc w/ enclosure: Executive Vice President

     & Chief Operating Officer Entergy Operations, Inc.

P.O. Box 31995 Jackson, Mississippi 39286-1995

 . Vice President Operations Support Entergy Operations, Inc.

P.O. Box 31995 ' Jackson, Mississippi 39286 Manager, Washington Nuclear Operations ABB Combustion Engineering Nuclear Power

 ' 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852.

County Judge of Pope County Pope County Courthouse Russellville, Arkansas 72801 Winston & Strawn 1400 L Street, N.W. Washington, D.C. 20005-3502 Bernard Bevill, Acting Director Division of Radiation Control and Emergency Management Arkansas Department of Health 4815 West Markham Street, Slot 30 Little Rock, Arkansas 72205 3867

Arkansas Nuclear One i l l Manager l Rockville Nuclear Licensing l Framatone Technologies 1700 Rockville Pike, Suite 525 i Rockville, Maryland 20852 i i l ( l i l l 1 i t l' 1 I 4

                                                                -- -.              .      .. .~                .

Arkansas Nuclear One NOV 2 71996 {gbcc to DMB (IE01)7 . i bec distrib. by RIV: L. J. Callan Resident inspector DRP Director MIS System Branch Chief (DRP/C) RIV File Project Engineer (DRP/C) DRS-PSB Branch Chief (DRP\TSS) Leah Tremper (OC/LFDCB, MS: TWFN 9E10) J R. V. Azua, DRP ' l l I l l i l i l 1 1 i l D  : G:\DRPDIR\SPPR\ANO.LTR DToCUQ i MT NA Iopy ofdocument, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:DKP/C/A C:Dfff}/G AD:DRS Q, D:DRP Cyf , k TReis;dfX -{@ EECjillins KEBrockma(rJVf JEDyerVW ( kj 11/ /pB \" 11Q96 11//}96 11b/96 j

       /             \                     OFFICIAL RECORD COPY 030025 a
           -- Arkansas Nuclear One                                                                                                                                                    NOV 2 71996 bec to DMB (IE01) bec distrib. by RIV:

L. J. Callan Resident inspector DRP Director MIS System Branch Chief (DRP/C) RIV File Project Engineer (DRP/C) DRS-PSB Branch Chief (DRP\TSS) Leah Tremper (OC/LFDCB, MS: TWFN 9E10) R..V. Azua, DRP 1 j A l D CU ~ T NAM $: G:\DRPDIR\SPPR\ANO.LTR To ei opy ot focument, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:DRP/CM C:DffF)/9 AD:DRS Q, D:DRP M , TReis;dp( [@ EECpilins - KEBrockmcj[Vf JEDyerVW ( 11/ /pB \ " 114)96 11 796 11(3/96  ;

                /.          \-                           . OFFICIAL RECORD COPY

ENCLOSURE ARKANSAS NUCLEAR ONE INSPECTION PLAN IP - Inspection Procedure Tl - Temporary Instruction Core inspection - Minimum NRC Inspection Program (mandatory all plants) INSPECTION TITLE / NUMBER OF DATES TYPE OF INSPECTION / COMMENTS PROGRAM AREA INSPECTORS TBD Design Basis inspection 5 2/97 Agency Safety Initiatives / Unit 1 TI-133 Radiolog"al Transportation 2 2/24- Safety Initiatives 3/1/97 IP 82701 Emergency Preparedness 2 3/17-21/97 Core inspection IP 73753 Inservice inspection 1 4/11-15/97 Core Inspection 50002 Steam Generator Repair 2 4/28- 5/2/97 Safety initiative / Unit 2 IP 37550 Engineering 5 6/23-27/97 Core and RegionalInitiatives

    & 37001 IP 37550      Engineering                             5         7/7-11/97    Core and RegionalInitiative
    & 37001 IP 71001       Licensed Operator                      3          7/7-11/97    Core Inspection Requalification Program Evaluation}}