ISFSI Occupational Radiation Exposure Repts
ML20135F066
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 12/31/1996
From: Katz P
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9703110169
Download: ML20135F066 (3)


Text

-

E.

PETER E. KATz Baltimore Gas and Electric Company Plant General Manager Calven Cliffs Nuclear Power Plaat Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby. Maryland 20657 410 495-4101 March 6,1997 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant, Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Calvert Cliffs Independent Spent Fuel Storage Installation, Docket No. 72-8 Occunational Radiation Exposure Reoorts Enclosed please find the Occupational Radiation Exposure Reports for 1996 as required by Unit I and 2 Technical Specification 6.6.1 and Technical Specification 6.1 for our Independent Spent Fuel Storage Installation. These reports contain the tabulation of the number of station, utility, and other personnel receiving exposures greater than 100 mrem for 1996 and their associated man-rem exposure according to work andjob functions.

Should you have questions regarding this matter, we will be pleased to discuss them witii you.

Very truly yours, h

PEK/RCG/bjd k#

Enclosures }

cc: D. A. Brune, Esquire II. J. Miller, NRC J. E. Silberg, Esquire Director, Project Directorate I-1, NRC Resident Inspector, NRC R.1. McLean, DNR I(\

A. W. Dromerick, NRC J. II. Walter, PSC 9703110169 961231 gDR ADOCK 05000317 a PDR l!!E;EIEllElE,EEl!E,Ij

g._ _ _ _ _ _ _ _ . _ _ _ . _ _ _ . _ ._ -- _ _._,

i

  • a e

1 BGE Calvert Cliffs Nuclear Power Plant --- Unit 1 and Unit 2

Technical Specification 6.6.1 Report 1996 i
i 1 No. of personnel ( > 100 mrom) Total Man-Rom ,

1 Station Utility Contractor Station Utility Contractor Work & Job Funcalon Employees Employees Workers Employees Employees Workers i

Reactor Ooerations & Surveillance Maintenance Personnel 0 0 0 0.000 0.000 0.000 Operating Personnel l 39 0 0 5.626 0.000 0.000 i Health Physica Personnel 1 0 30 0.246 0.000 5.256

$ Supervisory Personnel 0 0 1 0.000 0.000 0.157 Engineering Personnel 0 0 0 0.000 0.000 0.000 Routine Maintenance Maintenance Personnel 0 0 0 0.000 0.000 0.000 I Operating Personnel 0 0 0 0.000 0.000 0.000 3

Health Physics Personnel 11 0 12 1.328 0.000 1.904

Supervisory Personnel 0 0 0 0.000 0.000 0.000 Enginee.ing Personnel 0 0 0 0.000 0.000 0.000 i

j inservice inspection

Maintenance Personnel 2 0 73 0.645 0.000 15.287 4 Operating Personnel 1 0 0 0.127 0.000 0.000

$ Health Physics Personnel 1 0 5 0.159 0.000 0.826 Supervisory Personnel 0 0 0 0.000 0.000 0.000 Engineering Personnel 2 0 2 0.315 0.000 0.371 Special Maintenance Maintenance Personnel 91 35 163 19,708 11.788 45.905 Operatino Personnel 5 0 0 1.102 0.000 0.000 4

Health Physics Personnel 26 0 52 6.746 0.000 10.839

{ Supervisory Personnel 3 0 4 0.507 0.000 1.371 i Engineering Personnel 8 0 9 1.493 0.000 2.834 Weste Processing l Maintenance Personnel O O 2 0.000 0.000 0.682

, Operating Personnel _

O O O O.000 0.000 0.000 Health Physics Personnoi 8 0 26 1.356 0.000 6.630 Supervisory Personnel 0 0 0 0.000 0.000 0.000 Engineering Personnel 0 0 0 0.000 0.000 0.000 Refueling

Maintenance Personnel 4 0 32 1.132 0.000 14.643 4 Operating Personnel 0 0 0 0.000 0.000 0.000 i Health Physics Personnel 6 0 11 1.439 0.000 3.175 l
Supervisory Personnel 0 0 2 0.000 0.000 1.421 l a Engineering Personnel 1 0 3 0.183 0.000 1.658 j Total (Sum of 6 Work Functions > 100 mrem)

Maintenance Personnel 109 36 243 25.766 11.924 82.139 Operating Personnel 49 0 0 7.990 0.000 0.000 Health Physics Personnel 41 0 110 14.998 0.000 36.159 Supervisory Personnel 3 0 7 0.543 0.000 3.123 Engineering Personnel 13 0 14 2.628 0.000 4.909 l Grand Total l 215l 36l 374l 51.925) 11.924 l 126.330l l

u .

BGE Calvert Cliffs Nuclear P!wer Plant - Independent Spent Fuel St:r:g3 Installation Technical Specificatl0n 6.1 Report 1996 No. of personnel (> 100 mrom) Total Man-Rom Station Utility Contracto: Station Utahty Contractor Work & Job Function Employees Employees Workers Employees Employees Workers i

Reactor Operations & Surveillance j Maintenance Parsonnel 0 0 0 0.000 0.000 0.000

Operating Personnel 0 0 0 0.000 0.000 0.000 Health Physics Personnel 0 0 0 0.000 0.000 0.000 Supervisory Personnei 0 0 0 0.000 0.000 l 0.000 Engineering Personnel 0 0 0 0.000 0.000 0.000 Routine Maintenance Maintenance Personnel 0 0 0 0.000 0.000 0.000 Operating Personnel 0 0 0 0.000 0.000 0.000 Health Physics Personnel 0 0 0 0.000 0.000 0.000 Supervisory Personnel 0 0 0 0.000 0.000 0.000

. Engineering Personnel 0 0 0 0.000 0.000 0.000

] Inservice inspection

, Maintenance Personnel 0 0 0 0.000 0.000 0.000 Operating Personnel 0 0 0 0.000 0.000 0.000 Health Physics Personnel 0 0 0 0.000 0.000 0.000 Supervisory Personnel 0 0 0 0.000 0.000 0.000 Engineering Personnel 0 0 0 0.000 l 0.000 0.000 Special Maintenance Maintenance Personnel 0 0 0 0.000 0.000 0.000 Operating Personnel 0 0 0 0.000 0.000 0.000 Health Physics Personnel 0 0 0 0.000 0.000 0.000 Supervisory Personnel 0 0 0 0.000 0.000 0.000 Engineering Personnel O O O O.000 0.000 0.000 Waste Processing Maintenance Personnel 0 0 0 0.000 0.000 0.000 Operating Personnel 0 0 0 0.000 0.000 0.000 Health Physics Personnel 0 0 0 0.000 0.000 0.000 Supervisory Personnel 0 0 0 0.000 0.000 0.000 Engineering Personnel 0 0 0 0.000 0.000 0.000 Refueling Maintenance Personnel 0 0 0 0.000 0.000 0.000 Operating Personnel 0 0 0 0.000 0.000 0.000 Health Physics Personnel 0 0 0 0.000 0.000 0.000 Supervisory Personnel 0 0 0 0.000 0.000 0.000 Engineering Personnel 0 0 0 0.000 0.000 0.000 ISFSI*

Maintenance Personnel 1 2 0 0.278 0.416 0.000 Operating Personnel 0 0 0 0.000 0.000 0.000 Health Physics Personnel 0 0 0 0.000 0.000 0.000 Supervisory Personnel 0 0 0 0.000 0.000 0.000 Engineering Personnel 0 0 0 0.000 0.000 0.000 Total ISum of 7 Work Functions > 100 mrem)

Maintenance Personnel 1 2 0 0.278 0.416 0.000 Operating Personnel 0 0 0 0.000 0.000 0.000 Health Physics Personnel 0 0 0 0.000 0.000 0.000 Supervisory Personnel 0 0 0 0.000 0.000 0.000 Engineering Personnel 0 0 0 0.000 0.000 0.000

[ Grand Total l 1l 2l 0l 0.278l 0.416] 0.000]

' Please note that 5 loadings and transfers occurred in 1998. Total Persornem expended was astimate'J to be 2.977 rem.