PNO-II-85-086, on 850826,Natl Weather Svc Upgraded Tropical Storm Elena to Hurricane.Utils Contacted Re Implementation of Hurricane Procedures
ML20137M189 | |
Person / Time | |
---|---|
Site: | Grand Gulf, Crystal River, Farley, 05000000 |
Issue date: | 08/29/1985 |
From: | Cline W, Stansberry W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
To: | |
References | |
PNO-II-85-086, PNO-II-85-86, NUDOCS 8509130163 | |
Download: ML20137M189 (2) | |
Category:PRELIMINARY NOTIFICATION OF EVENT OR OCCURRENCE (PNO
MONTHYEARPNO-IV-99-005, on 990113,Grand Gulf Operators Commenced Unit Shutdown,From 100 Percent Power,Due to One or More Apparently Degraded Current Transformers Located in Safety Related Div I,4.16 Kv Switchgear.State of Ms Informed1999-01-13013 January 1999
[Table view]PNO-IV-99-005:on 990113,Grand Gulf Operators Commenced Unit Shutdown,From 100 Percent Power,Due to One or More Apparently Degraded Current Transformers Located in Safety Related Div I,4.16 Kv Switchgear.State of Ms Informed PNO-II-98-013, on 980308,util Declared NOUE Due to High River Level & Subsequent Flooding.Licensee Established Constant Communications W/Early,Ga & Houston County,Al.Resident Inspectors Are Monitoring Licensee Activities1998-03-0909 March 1998 PNO-II-98-013:on 980308,util Declared NOUE Due to High River Level & Subsequent Flooding.Licensee Established Constant Communications W/Early,Ga & Houston County,Al.Resident Inspectors Are Monitoring Licensee Activities PNO-II-98-005, on 980201,plant Commenced Reactor Startup & Entered Mode 2 Conditions (Keff 0.99).On 980202,criticality Was Achieved,Followed by Mode 1 Conditions.Unit Scheduled to Be at 100% Power Late 9802051998-02-0202 February 1998 PNO-II-98-005:on 980201,plant Commenced Reactor Startup & Entered Mode 2 Conditions (Keff 0.99).On 980202,criticality Was Achieved,Followed by Mode 1 Conditions.Unit Scheduled to Be at 100% Power Late 980205 PNO-II-98-004, on 980130,Region II Administrator Informed FPC That NRC Was Satisfied W/Completion of FPC Actions Specified in Cal, & Concurred That Plant,Unit 3 Could Operate IAW License1998-01-30030 January 1998 PNO-II-98-004:on 980130,Region II Administrator Informed FPC That NRC Was Satisfied W/Completion of FPC Actions Specified in Cal, & Concurred That Plant,Unit 3 Could Operate IAW License PNO-II-98-003, on 980120,licensee Placed Two Reactor Coolant Pumps in Operation to Add Heat to Rcs.Licensee Has Not Yet Requested Release from Cal.Licensee Issued Press Release1998-01-22022 January 1998 PNO-II-98-003:on 980120,licensee Placed Two Reactor Coolant Pumps in Operation to Add Heat to Rcs.Licensee Has Not Yet Requested Release from Cal.Licensee Issued Press Release PNO-II-97-063, on 971218,Crystal River Unit 3 Achieved Significant Milestone by Declaring a EDG Operable & Thus Making Both EDGs Operable for Mode 5.Licensee Does Not Plan to Issue Press Release.State of Fl Notified1997-12-19019 December 1997 PNO-II-97-063:on 971218,Crystal River Unit 3 Achieved Significant Milestone by Declaring a EDG Operable & Thus Making Both EDGs Operable for Mode 5.Licensee Does Not Plan to Issue Press Release.State of Fl Notified PNO-II-97-059, on 971118,established Vacuum in Main Condenser & Steam Bubble in Pressurizer.Completed Work on Planned Upgrades for B Edg.Resident & regional-based Inspectors Are Closely Monitoring Subject Activities1997-11-18018 November 1997 PNO-II-97-059:on 971118,established Vacuum in Main Condenser & Steam Bubble in Pressurizer.Completed Work on Planned Upgrades for B Edg.Resident & regional-based Inspectors Are Closely Monitoring Subject Activities PNO-II-97-039A, on 970720,Hurricane Danny Downgraded to Depression.Storm Disipated Without Reaching Farley Nuclear Plant.Farley Nuclear Plant Experienced Light Rain W/Both Units Remaining at Full Power1997-07-21021 July 1997 PNO-II-97-039A:on 970720,Hurricane Danny Downgraded to Depression.Storm Disipated Without Reaching Farley Nuclear Plant.Farley Nuclear Plant Experienced Light Rain W/Both Units Remaining at Full Power PNO-II-97-039, on 970718,response Was Made to Hurricane Danny.Region II State Liason Officer Has Been in Contact W/Fema & State of Al.Plant Staff Taking Precautionary Measures in Preparation for High Wind Conditions1997-07-18018 July 1997 PNO-II-97-039:on 970718,response Was Made to Hurricane Danny.Region II State Liason Officer Has Been in Contact W/Fema & State of Al.Plant Staff Taking Precautionary Measures in Preparation for High Wind Conditions PNO-II-97-007, on 970130,kV step-up Transformer Caught Fire & Exploded at Crystal River.Explosion Lifted Transformer Off of Base & Toppled on Side.Offsite Help Requested & Received by Derosa Volunteer Fire Dept1997-01-31031 January 1997 PNO-II-97-007:on 970130,kV step-up Transformer Caught Fire & Exploded at Crystal River.Explosion Lifted Transformer Off of Base & Toppled on Side.Offsite Help Requested & Received by Derosa Volunteer Fire Dept PNO-II-96-070A, on 961008,tropical Storm Josephine Had Lost Majority of Tropical Characteristics.Water Level Dropped & Licensee Began to Decrease Site Manning & NRC Secured Incident Response Ctr Manning in Atlanta on 9610081996-10-0808 October 1996 PNO-II-96-070A:on 961008,tropical Storm Josephine Had Lost Majority of Tropical Characteristics.Water Level Dropped & Licensee Began to Decrease Site Manning & NRC Secured Incident Response Ctr Manning in Atlanta on 961008 PNO-II-96-070, on 961007, Unusual Event Was Declared Due to Hurricane Warning.Plant Will Remain in Unusual Event Status at Least Until Hurricane Warning Is Lifted.Onsite Insps Will Be Conducted1996-10-0707 October 1996 PNO-II-96-070:on 961007, Unusual Event Was Declared Due to Hurricane Warning.Plant Will Remain in Unusual Event Status at Least Until Hurricane Warning Is Lifted.Onsite Insps Will Be Conducted PNO-II-96-060A, on 961004,licensee Notified NRC That Extended Shutdown Was Being Initiated to Accomplish Design Mod to Increase Safety Margins.On 960902,plant Was Shutdown Due to Problem W/Turbine Oil Sys.Meeting Scheduled on 9610091996-10-0404 October 1996 PNO-II-96-060A:on 961004,licensee Notified NRC That Extended Shutdown Was Being Initiated to Accomplish Design Mod to Increase Safety Margins.On 960902,plant Was Shutdown Due to Problem W/Turbine Oil Sys.Meeting Scheduled on 961009 PNO-II-93-075, on 931221,Unit 2 Shutdown Due to Turbine Virbrations.Unit 2 Planned to Be Shutdown for Approx Six Days to Implement Repairs on Secondary Side1993-12-22022 December 1993 PNO-II-93-075:on 931221,Unit 2 Shutdown Due to Turbine Virbrations.Unit 2 Planned to Be Shutdown for Approx Six Days to Implement Repairs on Secondary Side PNO-II-93-051, on 930928,ongoing Investigation of 10 Jet Pump Revealed Probable Loose or Displaced Mixer.General Electric Review of Data Verified Results & Recommended Jet Pump 10 Be Declared Inoperable1993-09-28028 September 1993 PNO-II-93-051:on 930928,ongoing Investigation of 10 Jet Pump Revealed Probable Loose or Displaced Mixer.General Electric Review of Data Verified Results & Recommended Jet Pump 10 Be Declared Inoperable PNO-II-93-046, on 930913,reactor Experienced Spurious Low Reactor Water Level Signal & High Pressure Core Spray Pump Started Causing High Water Level Scram.Licensee Planned Actions in Response to NRC Bulletin 93-03 Discussed1993-09-14014 September 1993 PNO-II-93-046:on 930913,reactor Experienced Spurious Low Reactor Water Level Signal & High Pressure Core Spray Pump Started Causing High Water Level Scram.Licensee Planned Actions in Response to NRC Bulletin 93-03 Discussed PNO-II-93-004, on 930130,facility Began Reactor Shutdown to Replace Leaking Pressurizer Code Safety Valve 2B. Leak Reached Max Rate of 20-28 Gpm Prior to Shutdown.Facility in Cold Shutdown on 930131.State of AL Informed1993-02-0101 February 1993 PNO-II-93-004:on 930130,facility Began Reactor Shutdown to Replace Leaking Pressurizer Code Safety Valve 2B. Leak Reached Max Rate of 20-28 Gpm Prior to Shutdown.Facility in Cold Shutdown on 930131.State of AL Informed PNO-II-92-019, on 920327,plant Automatically Tripped Due to Partial Loss of Offsite Power.Licensee Plans to Keep Unit Shutdown for 2-3 Days to Repair Faulty Rod Position Indication.State of Fl Was Not Notified1992-03-27027 March 1992 PNO-II-92-019:on 920327,plant Automatically Tripped Due to Partial Loss of Offsite Power.Licensee Plans to Keep Unit Shutdown for 2-3 Days to Repair Faulty Rod Position Indication.State of Fl Was Not Notified PNO-II-91-014, on 910329,as Result of Severe Weather & Heavy Rains,Bridge Located on Highway 61 Approx 7-8 Miles North of Grand Gulf Was Washed Out.State of Mississippi Have Been Notified1991-03-29029 March 1991 PNO-II-91-014:on 910329,as Result of Severe Weather & Heavy Rains,Bridge Located on Highway 61 Approx 7-8 Miles North of Grand Gulf Was Washed Out.State of Mississippi Have Been Notified PNO-II-90-062, on 901013,licensee Maint Employee Was Fatally Injured as Result of Fall of Approx 30 Ft in Reactor Bldg. Employee Transported to Hosp1990-10-15015 October 1990 PNO-II-90-062:on 901013,licensee Maint Employee Was Fatally Injured as Result of Fall of Approx 30 Ft in Reactor Bldg. Employee Transported to Hosp PNO-II-90-061, on 901009,unit Shutdown in Excess of 48 H as Result of Reactor Coolant Pump Motor Oil Leak.Caused by Missing Pieces of Sheet Metal.Licensee Plans to Conduct Repairs & Estimates 901016 Restart Date1990-10-12012 October 1990 PNO-II-90-061:on 901009,unit Shutdown in Excess of 48 H as Result of Reactor Coolant Pump Motor Oil Leak.Caused by Missing Pieces of Sheet Metal.Licensee Plans to Conduct Repairs & Estimates 901016 Restart Date PNO-II-89-078, on 891205,male Individual Called Dept of Corrections,State of Alabama & Requested to Talk to Dept Commissioner.Commissioner Not in & Individual Left Name, Phone Number & Message Threatening to Blow Up Farley NPP1989-12-0505 December 1989 PNO-II-89-078:on 891205,male Individual Called Dept of Corrections,State of Alabama & Requested to Talk to Dept Commissioner.Commissioner Not in & Individual Left Name, Phone Number & Message Threatening to Blow Up Farley NPP PNO-II-89-068, on 890920,facility Manually Tripped from Approx 60% Power Due to Loss of Main Feedwater.Caused by Bumping of Valve on Main Feedwater Pump Turbine A.Resident Inspector Monitoring Licensee Actions1989-09-22022 September 1989 PNO-II-89-068:on 890920,facility Manually Tripped from Approx 60% Power Due to Loss of Main Feedwater.Caused by Bumping of Valve on Main Feedwater Pump Turbine A.Resident Inspector Monitoring Licensee Actions PNO-II-89-066A, updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing1989-09-21021 September 1989 PNO-II-89-066A:updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing PNO-II-89-066, licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies1989-09-21021 September 1989 PNO-II-89-066:licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies ML20247N0071989-09-11011 September 1989 PNS-I-89-015:revised Notification of Telephone Threat, Correcting Event Date from 890909 to 890911.Call, Originating from Limerick or Peach Bottom,Received at Corporate Ofc.On 890525,threat Received at Peach Bottom PNO-II-89-061, on 890824,loss of Decay Heat Pump (RWP-2B) & Subsequent Reactor Trip Occurred.Caused by Unsatisfactory Discharge Pressure Condition While Performing Surveillance on Emergency Cooling Water Pump (RWP-2B)1989-08-28028 August 1989 PNO-II-89-061:on 890824,loss of Decay Heat Pump (RWP-2B) & Subsequent Reactor Trip Occurred.Caused by Unsatisfactory Discharge Pressure Condition While Performing Surveillance on Emergency Cooling Water Pump (RWP-2B) PNO-II-89-058, on 890814,reactor Tripped from 93% on Turbine Trip.Caused by Loss of Condenser Vacuum as Result of Ruptured Seal Between Condenser & Turbine.Investigations Underway.Licensee Estimate of 5-day Outage Noted1989-08-15015 August 1989 PNO-II-89-058:on 890814,reactor Tripped from 93% on Turbine Trip.Caused by Loss of Condenser Vacuum as Result of Ruptured Seal Between Condenser & Turbine.Investigations Underway.Licensee Estimate of 5-day Outage Noted PNO-V-89-047, on 890808,earthquake & Aftershock of 5.1 & 4.2 Magnitudes,Respectively,Occurred Approx 15 Miles Southwest of San Jose,Ca.Reactors Shutdown During Earthquake.Tour of GE Reactor Disclosed No Damage1989-08-0808 August 1989 PNO-V-89-047:on 890808,earthquake & Aftershock of 5.1 & 4.2 Magnitudes,Respectively,Occurred Approx 15 Miles Southwest of San Jose,Ca.Reactors Shutdown During Earthquake.Tour of GE Reactor Disclosed No Damage PNO-IV-89-045, on 890703,earthquake Near Tremonton,Ut Occurred.Earthquake Safety Interlocks Did Not Trip & No Damage Occurred1989-07-0505 July 1989 PNO-IV-89-045:on 890703,earthquake Near Tremonton,Ut Occurred.Earthquake Safety Interlocks Did Not Trip & No Damage Occurred PNO-II-89-047, on 890616,loss of Offsite Power W/Resulting Scram from 10% Power.Caused by Breaker 1691 Tripping Which Supplied Power from Unit 3 Startup Transformer to Vital Buses.Senior Resident Inspector Responded & Onsite1989-06-16016 June 1989 PNO-II-89-047:on 890616,loss of Offsite Power W/Resulting Scram from 10% Power.Caused by Breaker 1691 Tripping Which Supplied Power from Unit 3 Startup Transformer to Vital Buses.Senior Resident Inspector Responded & Onsite PNO-II-89-047A, on 890616,loss of Offsite Power W/Resulting Scram from 10% Power (Note Revised Time from Earlier Pn). Caused by Combination of Personnel Error & Equipment Failure. 1B RCP Started,Restablishing Forced Coolant Flow1989-06-16016 June 1989 PNO-II-89-047A:on 890616,loss of Offsite Power W/Resulting Scram from 10% Power (Note Revised Time from Earlier Pn). Caused by Combination of Personnel Error & Equipment Failure. 1B RCP Started,Restablishing Forced Coolant Flow PNO-II-89-045, between 890518-0609,13 Util Employees Inadvertently Received Whole Body Exposures of 300 Mrem Each While Cleaning Precipitator Containing 300 Mci Cs-137 Source.Caused by Failure of Shielding Mechanism1989-06-12012 June 1989 PNO-II-89-045:between 890518-0609,13 Util Employees Inadvertently Received Whole Body Exposures of 300 Mrem Each While Cleaning Precipitator Containing 300 Mci Cs-137 Source.Caused by Failure of Shielding Mechanism PNO-II-89-042, on 890602,util Notified That Decision Made to Cancel Unit 2.Util Will Not Request Cancellation of CP Until Approval Received from PSC of Arkansas,Mississippi,Louisiana & City of New Orleans1989-06-0202 June 1989 PNO-II-89-042:on 890602,util Notified That Decision Made to Cancel Unit 2.Util Will Not Request Cancellation of CP Until Approval Received from PSC of Arkansas,Mississippi,Louisiana & City of New Orleans PNO-II-89-035, on 890511,B Recirc Pump Experienced High Vibrations.Control Rods Were Inserted to Reduce Power & Recirc Pumps Were Shifted to Slow Speed1989-05-16016 May 1989 PNO-II-89-035:on 890511,B Recirc Pump Experienced High Vibrations.Control Rods Were Inserted to Reduce Power & Recirc Pumps Were Shifted to Slow Speed PNO-II-89-030, on 890405,diver from Nuclear Util Const Co Caused Alarm of Portal Monitor When Entering Site.Caused by Clothing Being Contaminated from Working at Plant in Spain. Individual Showed No Internal Activity1989-04-0707 April 1989 PNO-II-89-030:on 890405,diver from Nuclear Util Const Co Caused Alarm of Portal Monitor When Entering Site.Caused by Clothing Being Contaminated from Working at Plant in Spain. Individual Showed No Internal Activity PNO-V-89-022, on 880403,earthquake of Magnitude of 4.5 on Richter Scale Occurred 10 Miles Northeast of San Jose,Ca. Automatic Seismic Protection Did Not Trigger Shutdown. Reactors Manually Shutdown.No Radioactive Release Occurred1989-04-0303 April 1989 PNO-V-89-022:on 880403,earthquake of Magnitude of 4.5 on Richter Scale Occurred 10 Miles Northeast of San Jose,Ca. Automatic Seismic Protection Did Not Trigger Shutdown. Reactors Manually Shutdown.No Radioactive Release Occurred PNO-IV-89-020, Region IV Notified of Recent Reactor Trip at Palo Verde Unit 3 That Was Complicated by Inability to Open Steam Generator Atmospheric Dump Valves Mfg by Control Components,Inc.No Sticking Problems Noted at Other Plants1989-03-23023 March 1989 PNO-IV-89-020:Region IV Notified of Recent Reactor Trip at Palo Verde Unit 3 That Was Complicated by Inability to Open Steam Generator Atmospheric Dump Valves Mfg by Control Components,Inc.No Sticking Problems Noted at Other Plants PNO-II-88-069, on 881129,spurious Actuation of 19 Out of 30 Alert & Notification Sirens Occurred.Preliminary Info Indicated That Spurious False Activation Caused by Old Activation Sys Decommissioned Later on Same Day1988-11-30030 November 1988 PNO-II-88-069:on 881129,spurious Actuation of 19 Out of 30 Alert & Notification Sirens Occurred.Preliminary Info Indicated That Spurious False Activation Caused by Old Activation Sys Decommissioned Later on Same Day PNO-I-88-116, on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process1988-11-0909 November 1988 PNO-I-88-116:on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process PNO-V-88-044, on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at Berkeley1988-06-27027 June 1988 PNO-V-88-044:on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at Berkeley PNO-V-88-038, on 880612,earthquake Occurred on Calaveras Fault within 50 Miles of Identified Facilities.All Reactors Shutdown at Time of Earthquake.No Seismic Trips Observed. Insp Revealed No Signs of Damage at Facilities1988-06-13013 June 1988 PNO-V-88-038:on 880612,earthquake Occurred on Calaveras Fault within 50 Miles of Identified Facilities.All Reactors Shutdown at Time of Earthquake.No Seismic Trips Observed. Insp Revealed No Signs of Damage at Facilities PNO-IV-88-040, on 880509,System Energy Resources,Inc to Manage & Operate All Middle South Nuclear Plants.Arkansas Power & Light & Louisiana Power & Light Will Apply for Appropriate License Amends1988-05-0909 May 1988 PNO-IV-88-040:on 880509,System Energy Resources,Inc to Manage & Operate All Middle South Nuclear Plants.Arkansas Power & Light & Louisiana Power & Light Will Apply for Appropriate License Amends PNO-I-88-020, on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom1988-02-16016 February 1988 PNO-I-88-020:on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom PNO-I-88-017, on 880202,util to Announce Change to Corporate Mgt,Per Highly Critical INPO Ltr.Jh Austin Will Retire as of 880301 & Jl Everett Will Assume Duties of President Until Replacement Named1988-02-0202 February 1988 PNO-I-88-017:on 880202,util to Announce Change to Corporate Mgt,Per Highly Critical INPO Ltr.Jh Austin Will Retire as of 880301 & Jl Everett Will Assume Duties of President Until Replacement Named PNO-I-88-001, on 880104,realignment of Nuclear Mgt Updated. Action Provides for Corporate Officer at Each Plant to Elevate Level of Plant in Corporate Mgt Structure1988-01-0404 January 1988 PNO-I-88-001:on 880104,realignment of Nuclear Mgt Updated. Action Provides for Corporate Officer at Each Plant to Elevate Level of Plant in Corporate Mgt Structure PNO-II-87-080A, on 871209,plant Shut Down to Correct 0.7 Gpm Unidentified Leak.Elbow & Defective Weld Will Be Replaced & Sent to Westinghouse for Failure Analysis.Specialists Onsite Performing Reviews & Exams1987-12-14014 December 1987 PNO-II-87-080A:on 871209,plant Shut Down to Correct 0.7 Gpm Unidentified Leak.Elbow & Defective Weld Will Be Replaced & Sent to Westinghouse for Failure Analysis.Specialists Onsite Performing Reviews & Exams PNO-II-87-080, on 871209,plant Unit 2 Manually Shut Down from 33% Power to Repair Leak Believed to Be in 6 Inch Pipe to Elbow Weld.Plant Being Placed in Cold Shutdown for Repair. Licensee Anticipates 5 to 10 Day Outage1987-12-0909 December 1987 PNO-II-87-080:on 871209,plant Unit 2 Manually Shut Down from 33% Power to Repair Leak Believed to Be in 6 Inch Pipe to Elbow Weld.Plant Being Placed in Cold Shutdown for Repair. Licensee Anticipates 5 to 10 Day Outage PNO-V-87-076, on 871123-24,two Moderate Earthquakes Centered Near Westmoreland,Ca Occurred,Triggering Seismic Alarms at San Onofre.Unusal Event Declared.Plant Sys & Components Not Adversely Affected.Effects on Other Locations Noted1987-11-24024 November 1987 PNO-V-87-076:on 871123-24,two Moderate Earthquakes Centered Near Westmoreland,Ca Occurred,Triggering Seismic Alarms at San Onofre.Unusal Event Declared.Plant Sys & Components Not Adversely Affected.Effects on Other Locations Noted PNO-III-87-138, on 871103,reactor Shutdown After Two MSIV Failed to Close.Valves Recycled Resulting in Acceptable Time Responses.Augumented Insp Team Dispatched to Plant Site to Review Possible Causes of MSIV Closure Problems1987-11-0303 November 1987 PNO-III-87-138:on 871103,reactor Shutdown After Two MSIV Failed to Close.Valves Recycled Resulting in Acceptable Time Responses.Augumented Insp Team Dispatched to Plant Site to Review Possible Causes of MSIV Closure Problems 1999-01-13 Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS MONTHYEARIR 05000416/19990121999-09-29029 September 1999
[Table view]Insp Rept 50-416/99-12 on 990725-0904.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19990111999-09-28028 September 1999 Insp Rept 50-416/99-11 on 990830-0903.No Violations Noted. Major Areas Inspected:Solid Radioactive Waste Management Program,Radioactive Matl Transportation Program,Facilities & Equipment,Staff Knowledge & Performance & Staff Training IR 05000416/19990141999-09-27027 September 1999 Insp Rept 50-416/99-14 on 990830-0903.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radioactive Waste Effluent Mgt Program & Status of Effluent Radiation Monitors & Counting Room Instruments IR 05000416/19990151999-09-13013 September 1999 Partially Withheld Insp Rept 50-416/99-15 on 990816-20. Noncited Violation Noted.Major Areas Inspected:Licensee Physical Security Program,Personnel Access Control,Access Authorization & Protected Area Detection Aids IR 05000302/19990051999-09-13013 September 1999 Insp Rept 50-302/99-05 on 990704-0814.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000348/19990051999-09-0202 September 1999 Insp Repts 50-348/99-05 & 50-364/99-05 on 990627-0807.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000416/19990101999-08-24024 August 1999 Insp Rept 50-416/99-10 on 990809-13.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program IR 05000416/19990091999-08-0909 August 1999 Insp Rept 50-416/99-09 on 990613-0724.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19990031999-07-30030 July 1999 Insp Rept 50-416/99-03 on 990405-08 & 0510-11.No Violations Identified.Major Areas Inspected:Corrective Action Program Implementation IR 05000302/19990041999-07-27027 July 1999 Insp Rept 50-302/99-04 on 990523-0703.Noncited Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000348/19990041999-07-26026 July 1999 Insp Repts 50-348/99-04 & 50-364/99-04 on 990516-0626.One Noncited Violation Identified.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000416/19990071999-07-23023 July 1999 Insp Rept 50-416/99-07 on 990622-25.Violations Noted.Major Areas Inspected:Announced Insp of Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures Performed ML20210H1591999-07-23023 July 1999 Notice of Violation from Insp on 990308-10.Violation Noted: from Time of Receipt of Alarm Until Arrival at Three Different Vital Areas,Response Objective & Physical Security Plan Were Not Met IR 05000416/19990081999-07-15015 July 1999 Insp Rept 50-416/99-08 on 990502-0612.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19990051999-06-27027 June 1999 Insp Rept 50-416/99-05 on 990321-0501.Violations Identified, Being Treated as non-cited Violations.Major Areas Inspected: Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000348/19990031999-06-10010 June 1999 Insp Repts 50-348/99-03 & 50-364/99-03 on 990404-0515.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000302/19990031999-06-0404 June 1999 Insp Rept 50-302/99-03 on 990411-0522.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation.Major Areas Inspected:Aspects of Licensee Maint, Operations,Engineering & Plant Support IR 05000416/19990061999-05-21021 May 1999 Insp Rept 50-416/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Licensee Implementation of NRC Approved Fire Protection Program ML20206U3981999-05-18018 May 1999 Insp Rept 50-416/99-02 on 990222-26 & 0308-12.Non-cited Violations Noted.Major Areas Inspected:Engineering IR 05000302/19990021999-05-0606 May 1999 Insp Rept 50-302/99-02 on 990228-0410.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000348/19990021999-04-29029 April 1999 Insp Repts 50-348/99-02 & 50-364/99-02 on 990221-0403.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000416/19990041999-04-23023 April 1999 Insp Rept 50-416/99-04 on 990131-0320.Violations Noted. Major Areas Inspected:Operation,Maintenance,Engineering & Plant Support ML20205Q1721999-04-0606 April 1999 Partially Withheld Insp Repts 50-348/99-09 & 50-364/99-09 on 990308-10 (Ref 10CFR73.21).Non-cited Violation Identified. Major Areas Inspected:Area of Plant Support Re Physical Security Program for Power Reactors IR 05000302/19990011999-03-29029 March 1999 Insp Rept 50-302/99-01 on 990117-0227.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000348/19990011999-03-19019 March 1999 Insp Repts 50-348/99-01 & 50-364/99-01 on 990110-0220. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20207E0881999-02-26026 February 1999 Notice of Violation from Insp on 990201-05.Violation Noted: on 990201,NRC Inspectors Identified That Area with Dose Rates Greater than 1000 M/H Not Provided with Locked or Continously Guarded Doors to Prevent Unauthorized Entry IR 05000416/19990011999-02-26026 February 1999 Insp Rept 50-416/99-01 on 990201-05.Violations Noted. Major Areas Inspected:Plant Support.Violation of TS 5.7.2 Identified for Failure to Control Locked High Radiation Area Around Spent Fuel Pool Cooling & Cleanup HX IR 05000348/19980081999-02-0202 February 1999 Insp Repts 50-348/98-08 & 50-364/98-08 on 981129-990109.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19980151999-01-20020 January 1999 Insp Rept 50-416/98-15 on 981101-1212.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Suuport PNO-IV-99-005, on 990113,Grand Gulf Operators Commenced Unit Shutdown,From 100 Percent Power,Due to One or More Apparently Degraded Current Transformers Located in Safety Related Div I,4.16 Kv Switchgear.State of Ms Informed1999-01-13013 January 1999 PNO-IV-99-005:on 990113,Grand Gulf Operators Commenced Unit Shutdown,From 100 Percent Power,Due to One or More Apparently Degraded Current Transformers Located in Safety Related Div I,4.16 Kv Switchgear.State of Ms Informed IR 05000348/19980141999-01-0808 January 1999 Partially Withheld Insp Repts 50-348/98-14 & 50-364/98-14 on 981207-10 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Procedures & Representative Records,Interviews with Personnel & Observations of Activities in Progress IR 05000302/19980101999-01-0404 January 1999 Insp Rept 50-302/98-10 on 981025-1205.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support.Insp Also Included Results of Physical Security Specialist ML20199D6161999-01-0404 January 1999 Notice of Violation from Insp on 981025-1205.Violation Noted:Its Requirements for Valve Position Verifications Not Met as Evidenced by Listed Examples IR 05000348/19980071998-12-28028 December 1998 Insp Repts 50-348/98-07 & 50-364/98-07 on 981018-1128.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20198L7711998-12-24024 December 1998 Notice of Violation from Insp on 981207-11.Violation Noted: on 950630,licensee Made Change to Emergency Plan Without Commission Approval IR 05000416/19980161998-12-24024 December 1998 Insp Rept 50-416/98-16 on 981207-11.Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program Was Conducted IR 05000302/19980131998-12-16016 December 1998 Insp Rept 50-302/98-13 on 981116-20.No Violations Noted. Major Areas Inspected:Area of Plant Support by Regional Safeguards Specialist.Physical Security Program Was Evaluated ML20196F1141998-12-0101 December 1998 Notice of Violation from Insp on 980920-1031.Violation Noted:From 980521 Through 981015,conditions Adverse to Quality Identified in Condition Rept 1998-0014 Not Promptly Corrected ML20196F1271998-12-0101 December 1998 Insp Rept 50-416/98-13 on 980920-1031.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000302/19980121998-12-0101 December 1998 Insp Rept 50-302/98-12 on 981013-16.No Violations Noted. Major Areas Inspected:Observation & Evaluation of Biennial EP Exercise for Crystal River Unit 3 IR 05000416/19980141998-11-27027 November 1998 Insp Rept 50-416/98-14 on 981026-30.No Violations Noted. Major Areas Inspected:Exposure Controls,Controls of Radioactive Matls & Contamination,Surveying & Monitoring & Quality Assurance Oversight of Radiation Protection Program IR 05000302/19980091998-11-13013 November 1998 Insp Rept 50-302/98-09 on 980913-1024.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000348/19980061998-11-10010 November 1998 Insp Repts 50-348/98-06 & 50-364/98-06 on 980830-1017.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000348/19980101998-11-0303 November 1998 Insp Repts 50-348/98-10 & 50-364/98-10 on 980908-11.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise & Response in Control Room Simulator & Technical Support Ctr IR 05000416/19980111998-10-14014 October 1998 Insp Rept 50-416/98-11 on 980809-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000302/19980081998-10-0606 October 1998 Insp Rept 50-302/98-08 on 980802-0912.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering, Maint & Plant Support IR 05000348/19980051998-09-28028 September 1998 Insp Repts 50-348/98-05 & 50-364/98-05 on 980712-0829.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000416/19980121998-09-15015 September 1998 Insp Rept 50-416/98-12 on 980817-20.No Violations Noted. Major Areas Inspected:Training,Qualifications,Quality Assurance Oversight,Facilities & Equipment & Annual Reports IR 05000416/19980031998-09-0909 September 1998 Insp Rept 50-416/98-03 Cancelled IR 05000416/19980091998-08-31031 August 1998 Insp Rept 50-416/98-09 on 980628-0808.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support 1999-09-29 |
.r.. August 29, 1985 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE PNO-II-85-86 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information is as initially received without verifi-cation or evaluation, and is basically all that is known by the Region II staff on this date.
FACILITY: Alabama Power Company Licensee Emergency Classification:
Farley Units 1 and 2 Notification of Unusual Event Docket Nos. 50-348 and 50-364 Alert Ashford, Alabama Site Area Emergency Florida Power Corporation General Emergency Crystal River Unit 3 X Not Applicable Docket No. 50-302 Crystal River, Florida Mississippi Power and Light Co.
Grand Gulf Units 1 and 2 Docket Nos. 50-416 and 50-417 Port Gibson, Mississippi
SUBJECT:
ACTIONS IN RESPONSE TO HURRICANE "ELENA" The National Weather Service upgraded tropical storm "Elena" to a hurricane at 9 a.m.
(EDT) today.
R:gion II has contacted Alabama Power Company, Florida Power Corporation, and Mississippi
, Power and Light Company regarding implementation of hurricane procedures at the Farley, Crystal River and Grand Gulf facilities. The region also continues to monitor the hurricane's status.
As of 11 a.m. today, "Elena" was located at latitude 25 degrees north and longitude 85 d:grees west, or about 375 miles southeast of New Orleans. The hurricane continues to move northwest at 20 miles per hour. It is expected to turn gradually toward the north and slow down during the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
A hurricane warning is in effect from Morgan City, Louisiana, to Pensacola, Florida.
"Elena" is now a nominal hurricane, but conditions indicate it could grow in intensity.
Media coverage of the storm is ongoing.
The states of Alabama, Florida and Mississippi have been informed.
This information is current as of 11 a.m. today.
Contact:
W. W. Stansberry, 242-5248 W. E. Cline, 242-2665 DISTRIBUTION -
PhillipsI E/W
'h H. Street $ M: MNBB Willste7 MAIL:
Chairman Palladino TU T NRR TE~ NM55 IURIBB Com. Roberts PA OIA RES DOT: Trans Only Com. Asselstine MPA AE0D Applicable State Com. Bernthal ELD Com. Zech AirRightsYgil) INPO$4 SECY SP NSAC 4
PNO-gy_g o\ _cE3V
l 5;#9' 3
R Regions: k!!. 3, o5,63147/
Licensee: Am ba-ahe 0 3l15 :
Licensee: Flor-tJa h w Corp. 3 30 '
Licensee: 24;3s;s5; Asth u e 4 u iktOd 3'3b (Reactor Licensees) 5 Applicable Resident Site FA Applicable Resident SiteC,ryS+q Al R:ve 3.' 303 Applicable Resident Site G>r<.nl Gule 314 /
l l
bp6 ry -3(