Summary of 860110 Meeting W/Util in Pittsburgh,Pa Re Licensing Issues & Agenda for Completion of Licensing Activities to Support Proposed Fuel Load Date of Apr 1987
ML20137N329
Person / Time
Site: Beaver Valley
Issue date: 01/24/1986
From: Tam P
Office of Nuclear Reactor Regulation
To: Rubenstein L
Office of Nuclear Reactor Regulation
References
NUDOCS 8602030028
Download: ML20137N329 (3)


Text

,*

s

./s =

  • co.q'o UNITED STATES F'

"n NUCLEAR REGULATORY COMMISSION y, _

WASHINGTON, D. C. 20555

/ January 24, 1986 Docket No. 50-412 MEMORANDUM FOR: Lester S. Rubenstein, Director PWR Project Directorate #2 Division of PWR Licensing-A FROM: Peter S. Tam, Project Manager PWR Project Directorate #2 Division of PWR Licensing-A

SUBJECT:

SUMMARY

AND FOLLOWUP 0F LICENSING ISSUES DISCUSSED AT THE JANUARY 10, 1986 MEETING WITH BEAVER VALLEY UNIT 2 PERSONNEL On January 10, 1986, I met with Beaver Valley Unit 2 personnel (Messrs.

R. Martin, G. Beatty, et al.) at their offices in Pittsburgh. The purpose of the meeting is to assure a smooth transition of the PM function from B. K.

Singh to me and to lay down an agenda for completion of licensing activities to support a proposed fuel load date of April 1987. The following items were discussed:

NRR Contacts for the Applicant Applicant personnel requested names of reviewers in the new organization. I indicated that their primary contact is the Project Manager, in conformance with NRR policy and as described in the Project Manager's Handbook. New reviewers are being 7.ssigned by the new NRR organization.

Construction Permit Renewal The CP has currently expired. The applicant has submitted a request in October 1984 to extend it, but the staff has not acted on it. I have initiated action to follow up on this issue.

< Secondary Piping Leak-Before-Break Assumptio2 The applicant has assumed that a " broad Voy. ule" on application of leak-before-break methodology would be aprf'c er co a schedular exemption pending its approval, would be forthcoming. 74 a ogg;:: ant has proceeded to apply the yet-to-be approved rule and analysis technique (WHIPJET) to his analysis of pipe restraints for balance-of-plant piping. The present schedule for rule l approval, however, extends beyond the currently forecast OL date. While the technical staff views the WHIPJET analysis methodology favorably from a technical standpoint, the staff foresecs uncertainty in issuing a schedular exemption from GDC 4 in the event the " broad scope rule" is not approved, i pgg20ggg gggg2 A

L_

Lester S. Rubenstein specifically, due to the interpretation of the new 50.12 version of the regulation (granting of exemptions). The proposed fuel load date is April 1987. Unsatisfactory resolution of this matter will have an impact on the proposed date.

The applicant requested assurance that exemptions would be granted if needed but I stated the above difficulties. NRR management has been informed of potential problems by your memorandum of January 15, 1986.

Items Not Acted on By NRC The applicant provided a list of letters which NRC has not acted on. These are dated 8/7/85, 8/19/85, 9/13/85, 10/15/85, and 12/20/85. Some of these could have resulted in closed confirmatory items before the October 1985 SER was issued. I have initiated review actions on all of these items, and reviewers are being identified by NRR management.

Technical Specification Review A revised set of proposed TS's was submitted on December 20, 1985. In that letter, as well as in the meeting, the applicant requested that we start our review of the TS immediately since the TS is non-standard. I have initiated the review and have provided the assigned reviewer with all needed documents.

Detailed Control Room Design Review Audit The applicant requested NRC to propose a date to perform this audit. After the meeting, the date has been set for February 11 and 12,1986.

Preservice and Inservice Inspection (PSI and ISI)

The applicant wanted to know when the ISI program should be submitted for review. After the meeting, I found out from our reviewers that we would not commence ISI review until after we have completed PSI review (about early sumer). A reviewed program is not needed for OL but will be needed prior to the first refueling. The ideal time to submit the ISI program is thus a short time before issuance of an OL. ISI will therefore become a licensing condition in the OL (a normal practice).

Peter S. Tam, Project Manager PWR Project Directorate #2 Division of PWR Licensing-A cc: See next page Distribution:

Docket'No.;506412: CVogan NRC PDR 0 ELD B. Grimes P.' Tam PAD #2 rdg Local PDR E. Jordan ACRS (10)

PM: PAD PTam:b T 1/k/8

Mr. J. J. Carey Duquesne Light Company Beaver Valley 2 Power Station cc: ,

Gerald Charnoff, Esq. Mr. John P. Thomas, Manager Engineering Jay E. Silberg, Esq. Beaver Valley Two Project Shaw, Pittman, Potts & Trowbridge Duquesne Light Company 1800 M Street, N.W. P. O. Box 328 Washington, DC 20036 Shippingport, Pennsylvania 15077 Mr. C. W. Ewing, Quality Assurance Zori Ferkin Manager Assistant Counsel -

Quality Assurance Department Governor Energy Cnuncil Duquesne Light Company 1625 N. Front Street P. O. Box 186 Harrisburg, PA 15105 Shippingport, Pennsylvania 15077 Mr. E. J. Woolever, Vice President Special Nuclear Projects Duquesne Light Company Director, Pennsylvania Emergency P. O. Box 4 Management Agency Shippingport, Pennsylvania 15077 Room B-151 Transportation & Safety Building Harrisburg, Pennsylvania 17120 Mr. T. J. Lex Mr. Thomas Geruskv Westinghouse Electric Corporation Bureau of Radiation Protection Power Systems PA Department of Environmental P. O. Box 355 Resources Pittsburgh, Pennsylvania 15230 P. O. Box 2063 Harrisburg, Pennsylvania 17120 Mr. P. RaySircar Stone & Webster Engineering Corporation SVPS-2 Records Management Supervisnr P. O. Box 2325 Duquesne Light Company Boston, Massachusetts 02107 Post Office Box 4 Shippingport, Pennsylvania 15077 Mr. Glenn Walton U. S. NP.C John A. Lee, Esq.

P. O. 181 Duquesne Light Company Shippingport, Pennsylvania 15077 1 0xford Centre 301 Grant Street Mr. Thomas E. Murley, Regional Admin. Pittsburgh, Pennsylvania 15279 U. S. NRC, Region I 631 Park Avenue Mr. Roger Martin, Manager King of Prussia, Pennsylvania 15229 Regulatory Affairs Beaver Valley Two Project Duquesne Light Company P. O. Box 328 Shippingport, PA 15071 i