ML20137S972

From kanterella
Revision as of 08:50, 16 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Advises That Portions of 860102 Rev 11 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable. One Change Inconsistent W/Provision of 10CFR50.54(p).Encl Withheld (Ref 10CFR73.21)
ML20137S972
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 02/07/1986
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
References
CON-#186-067, CON-#186-67 OL, NUDOCS 8602180153
Download: ML20137S972 (4)


Text

m

.. a SAFEGUARDS INFORMATION' FEB 0 71986 Carolina Power and Light Company ATTN: Mr. E. E.'Utley

. Senior Executive Vice President

. Power Supply and Engineering and Construction P.O. Box 1551 Raleigh, North Carolina 27602 Gentlemen:

SUBJECT:

DOCKET NO. 50-261 This acknowledges the receipt of your letter of January 2, 1986, which transmitted Revision 11 to the H. B. Robinson Physical Security Plan.

-Our review of the changes has found portions of the changes to be consistent with the provisions of 10 CFR 50.54(p). One . change is not consistent with the provisions of 10 CFR 50.54(p) as delineated in the enclosure to this letter.

This was discussed between Mr. John Walker of your staff and Ms. Orysia Masnyk of the Region II staff on January 15, 1986. To preclude a violation of regulatory requirements, you must not continue to implement the change deemed inconsistent.

Please revert to the commitment in your previously approved plan or, if desired, modify your plan to accommodate the enclosed comments and resubmit corrected plan pages as necessary to maintain . plan continuity. Should you want to pursue the change deemed inconsistent, you must submit a request to the Commission's Office of Nuclear Reactor Regulation, under the provisions of 50.90 for amendment to your license.

The enclosure to your letter is being withheld from public disclosure because it contains Safeguards Information and must be protected in accordance with the provisions of 10 CFR Part 73.21.

The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the enclosure will not be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss them with you.

Sincerely, Original Signed by 8602180153 860 261 Roger D. Walker PDR Am O PDR Roger D. Walker, Director Division of Reactor Projects Enclosure i

incons Changes (Safe 9uards o mat on) ENCLOSURE CONTAINS cc w/ enc' SAFECUARD3 n! FORMAT (S " UPen sEPAnATION THIS PAGE IS DECONTROLLED.

g g W0 GABON

@# id

i

. t SAFEGUARDS !NFORMATION-Carolina Power and Light Company 2 FE8 0 71986 cc w/ enc 1:

Mr. G. P. Beatty, Jr. , Manager .

Robinson Nuclear Project Department P. 0.: Box 790 Hartsville, South Carolina 29550 Mr. R. E. Morgan, Plant General Manager P. O. Box 790 Hartsville, South Carolina 29550 cc w/o enc 1:

. Mr. .G. F. Trowbridge, Esq.

Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.

Washington, D. C. 20036 U. S. Environmental Protection Agency Region IV Regional Radiation Representatives 345 Courtland Street, N.W.

Atlanta, Georgia 30308 Mr. Dayne H. Brown, Chief Radiation Protection Branch Division of Facility Services Department of Human Resources P.O. Box 12200 Raleigh, North Carolina 27605 Attorney General Department of . Justice Justice Building Raleigh, North Carolina 27602 State Clearing House Division of Policy Development 116 West Jones Street Raleigh, North Carolina 27603 Chairman Darlington County Board of Supervision County Court House Darlington, South Carolina 29535

.Mr. B. A. Matthews Hartsville Group P. O. Box 1089 Hartsville, SC 29550 (cc Wo enc 1 cont'd - see page 3) m osunc m ains***'***

    • *
  • ssuar upon * *zo*uzuri SAFEGUARDS INF0RMAT10N.

PAGE 18 DECONTROLLED.

SAFEGUARDS INFORMATION- -

-Carolina Power and Light Company. 3 FE8 u 71986 (cc w/o encl cont'd)

Ms. Samantha Francis Flynn, Esq.

Carolina Power and Light Company P. O. Box 1551 Raleigh, NC 27602 Mr. Morton B. Morgulies, Chairman Administrative Judge Atomic Safety and Judge Licensing Board U.S. Nuclear Regulatory Commission Washington,-DC 20555 Dr. Jerry R. Kline Administrative Judge Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, DC 20555 Dr. David L. Hetrick Administrative Judge Professor of Nuclear Engineering University of Arizona

.Tuscon, AZ 85721 Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, DC 20555 Atomic Safety and Licensing Appeal Board U.S.. Nuclear Regulatory Commission Washington, DC 20555 Docketing and Service Section Office of the Secretary U.S. Nuclear Regulatory Commission Washington, DC 20555

'bec w/ encl:

Chief, Safeguards Power Reactor Licensing Branch, NMSS, 881-SS Chief, Standardization and Special Projects Branch, NRR, 340-P Region 'II Licensing File (50-261),

TAB 2 bec w/o encl: (See page 4) r . . . ' C ONTA tyg E

SAFEGUARDS INFORMATION- IaceI@ offo

SAFEGUARDS INFORMATION-  !

Carolina Power.and Light Company- 4 F8 0 7 g bec w/o encl:

Document Control Desk (RG01), 42-P NRC Resident Inspector J. Ennis-State of North Carolina RII RII R ~~ I RII 0pasnyk:wn1 sD R

Ib gsnL &

Jw CPetrfy tre K arr JStohr E.Fredrickson i V8e n Ot r A 02/04/86 02/0 0/86 02/6/86 02/b/86 2/(_,/86 02/C /86 gyggg/86 CONTAINs SAFEGUARDS INFORMATION- 8^rmaans 1Nroavirro, PON sgpygggggy 7 MIS PAGE is DECONTROLLED, I-