ML20094L868

From kanterella
Revision as of 22:26, 2 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposed Tech Specs,Providing Addl Info Re Changes Affecting TS Sections 3.4.8 & 3.9.9,Tables 2.2-1,3.3.-3,3.3-5 & 3.3-8 & Bases Sections 3/4.2.1,3/4.4.8 & 3/4.11.2.1 Which Will Correct Typos,Clarify or Make Editorial Changes
ML20094L868
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/15/1995
From:
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20094L861 List:
References
NUDOCS 9511210167
Download: ML20094L868 (3)


Text

_ . . _ . _ _ _ . _ _._ _... ._

m . _ . . .m _ _ . _ _

F;bruary 26, 1991

(

h:-

tration cootant systru -

SPECIFIC ACTIVITY .

LIMITING CONDITION FOR OPERATION k

3.4.8 The specific activity of the primary coolant shall be lialted to:' .

a. g 1.0 pC1/ gram DDSE EQUIVALENT I-131, and -

g\n .

F '

b. s 100/l pCi/ gram. ' sok W
g. M 5 g'

APPLICABILITY: MODES 1, 2, 3, 4, and 5. # x s, . .

i EIEE: o j Sk  !

MODES 1, 2, and 3*: '#

{

a. With the specific activ y of the pr ry coolant > 1.0 pCf DOSE EQUIVALENT 1-131 t within t allowable limit (below/ gram and to the left of the line 3hown on Fi re 3.4-1. oneration may continue  !

Afar m to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, ntry into KDPERATIONAL NODE or othet W ft >ec "tes conattion is permittedjursuant to specif1 canon 3.0.4_ ,

Q >en subject to this ACTION statement. s j

b. With the specific activity of the primary coolant > 1.0 pCf/ gram $

DOSE EQUIVALENT 1-131 for more than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> during one continuous time interval or exceeding the limit line shown on Figure 3.4-1, be i  ;

in HOT STAND 8Y with T ,, < 515'F within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.  ;

l

c. With the specific activity of the primary coolant > 100/l pC1/ gram,  ;

be in NOT STAND 8Y with 3 T ,, < 515'F within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. l MODES 1, 2, 3, 4 and 5.

i

d. With the specific activity of the primary coolant > 1.0 pC1/ gram DOSE EQUIVALENT 1-131 or > 100/E pCi/ gram, perform the sampling and analysis requirements of item 4 a) of Table 4.4-2 until the specific activity of the primary coolant is restored to within its limits.
  • With T,,,1 515'p, .

9511210167 951115 PDR ADOCK 05000336 .

P PDR .

i MILLSTONE - UNIT 2 3/44-13 Amendment No. 7. JJJ, JJJ,151

_ _ __ __ . ~ . _ _ . . _ ._ . . . _ . , _ _ . . . _ _ _ _ _ . . _ . _ . . . . _ . _ _ _ . . _ _ _ - . _ _ . . . , . _ _ _ . _ _

Docket No. 50-336 B15417 i

f Attachment 2 i

Millstone Nuclear Power Station, Unit No. 2 Proposed Technical Specifications Revision Administrative Changes to Technical Specifications ,

Retyped Technical Specifications November 1995

REACTOR C0OLANT SYSTEM SPECIFIC ACTIVITY LIMITING COMITION FOR OPERATION 3.4.8 The specific activity of the primary coolant shall be limited to:

a. 1 1.0 #Ci/ gram DOSE EQUIVALENT I-131, and
b. s 100/E pC1/ gram.

APPLICABILITY: MODES 1, 2, 3, 4, and 5.

ACTION:

MODES 1, 2, and 3*:

a. With the specific activity of the primary coolant > 1.0 pC1/ gram DOSE EQUIVALENT I-131 but within the allowable limit (below and to the left of the line) shown on Figure 3.4-1, operation may continue for up to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />. Specification 3.0.4 is not applicable. l ,

l

b. With the specific activity of the primary coolant > 1.0 pCi/ gram DOSE EQUIVALENT I-131 for more than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> during one continuous time interval or exceeding the limit line shown on Figure 3.4-1, be i in HOT STANDBY with T,,,< 515'F within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. l
c. With the specific activity of the primary coolant > 100/E pC1/ gram, I be in HOT STANDBY with T,,,< 515'F within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

MODES 1, 2, 3, 4 and 5:

d. With the specific activity of the primary coolant > 1.0 pC1/ gram DOSE EQUIVALENT I-131 or > 100/E pC1/ gram, perform the sampling and analysis requirements of item 4 a) of Table 4.4-2 until the specific activity of the primary coolant is restored to within its limits.
  • With T.,, 1 515'F.

NILLSTONE - UNIT 2 3/4 4-13 Amendment No. 7. JJ/, JJJ JJJ.

0212