Interim Deficiency Rept DER 83-42 Re Thermowells in Rcs. Initially Reported on 830629.Extension for Submittal of Final Rept from 840815 to 840915 Requested Due to Need for Evaluation of post-demonstration Test Insp
ML20095H082
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/13/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-30191-TDS, DER-83-42, NUDOCS 8408280335
Download: ML20095H082 (2)


Text

o EECGygg NRC Arizona Public Service Company 193) gg g g REGle.y yg;:

August 13, 1984 ANPP-30191-TDS/IRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 83-42 A 50.55(e) Potentially Reportable Deficiency Relating To Thermove11s In The Reactor Coolant System.

File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between P. Johnson and J. Roedel on June 29, 1983 (B) ANPP-27398, dated July 25, 1983 (Interim Report)

(C) ANPP-27852, dated September 21, 1983 (Time Extension)

(D) ANPP-28320, dated November 30, 1983 (Time Extension)

(E) ANPP-28575, dated January 9,1984 (Time Extension)

(F) ANPP-28733, dated January 27, 1984 (Interim Report, Revision 1)

(G) ANPP-29714, dated June 11, 1984 (Time Extension)

(H) Telephone conversation between P. Narbut and T. Bradish on August 14, 1984

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), Interim Reports were transmitted by Reference (B) and (F),

and Time Extensions were requested by References (C), (D), (E), and (G).

At that time, it was estimated that a Final Report would be available by August 15, 1984.

As discussed in Reference (H) the Post Demonstration Test Inspection is in process. The results of the inspection must be evaluated prior to submittal of the Final Report. APS expects this report to be completed prior to August 31, 1984, however, a time extenstion is requested until September 15, 1984.

8408280335 840813 PDR ADOCK 05000528 S PDR Cf ZE- 27

k s'

l Mr. T. W. Bishop DER 83-42 Page Two There is.no new information or change to the Interim Report at this time.

Very truly ur [

.. . 6,14. 4 N E. E. Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director EEVB/TRB:nj cc: Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen R. P. Zimmerman S. R. Frost i J. Self M. Woods T. J. Bloom l

Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339 i

- - _ _.