Part 21 Rept Re Ruskin Div Supplied Dampers W/Itt Actuators. Div Currently Evaluating Loctite Compound Which May Be Applied,Following Verification of Proper Damper Adjustment, to Threads of Extension Shaft in Place
ML17304B169
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/02/1989
From: Hill T
PHILLIPS INDUSTRIES, INC.
To:
NRC
References
REF-PT21-89, REF-PT21-89-071-000 PT21-89-071-000, PT21-89-71, NUDOCS 8905180154
Download: ML17304B169 (10)


Text

gc CELE RA,TED D BUTION DEMONS A,Tl0.'i SYSTEM REGULAT INFORMATION DISTRIBUTIO STEM (RIDS)

ACCESSION NBR:8905180154 DOC.DATE: 89/02/02 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION HILL,T.D. Phillips Industries, Inc.

RECIP.NAME RECIPIENT AFFILIATION NRC No Detailed Affiliation Given

SUBJECT:

Part 21 rept re dampers supplied by ITT actuators.Ruskin Div evaluating Loctite compound following verification.

DISTRIBUTION CODE: IE19D COPIES RECEIVED:LTR I ENCL TITIE: Part 21 Rept (50 DKT)

~ SIZE:

8 NOTES:Standardized plant.. 05000528 Standardized plant. 05000529 Standardized plant. 05000530 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 1 0 PD5 PD ~

1 1 CHAN,T 1 1 DAVIS,M 1 1 DAVIS,M.J. 1 1 INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 IRM TECH ADV 1 .1 IRM/DCTS/DAB 1 1 NRR CRUTCHFIELD 1 1 NRR VARGA,S 1 1 NRR/DEST/ADE 8H 1 1 NRR/DEST/ADS 7E 1 1 NRR/DLPQ/QAB 10 1 1 NRR/DOEA/GCB 11 1 1 NRR JURIS VIB 9D 1 1 NUDOCS-ABSTRACT 1 1 G FIL 01 1 1 RES/DSIR/EIB 1 1 RG 1 1 RGN2 1 1 RGN3 1 1 RGN4 1 1 RGN5 1 1 EXTERNAL: INPO RECORD CTR 1 1 LPDR 1 1 NRC PDR 1 1 NSIC SILVERiE 1 1 NOTES: 1 1 NOZE I0 ALL 'KIDS" R1KIPZEPIS'IZASE HELP US 10 REDUCE HASTEl CXKZACT 'IHE DOCUMEÃZ CGNZROL DESK RXM Pl-37 (EXT. 20079) KO,EIZMHCGR KNR HARB HKN DISTRIBUTICN LI8TB HR DOCUMENXS KRJ DGNiT NEEDf TOTAL NUMBER OF COPIES REQUIRED: LTTR 29 ENCL 28

~ 1 ~

I Air Distribution Group Ruskin Division Manufacturing Quality Components for Better Building February 2, 1989 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 10555

Dear Sir:

In accordance with the requirements of 10 CFR part 21, Ruskin Manufacturing Company, located at 3900 Dr. Greaves Road, Grandview.

Missouri, 64030, is herewith reporting that we have discovered a deficiency with equipment furnished by Ruskin Manufacturing Company for Nuclear Power Plant application.

On December 19, 1988, Ruskin Division received letter notification from Arizona Nuclear Power Project (ANPP) requesting Ruskin input for completion of Reportabi lity Evaluation Request 88-18. The identified problem on Ruskin supplied dampers with ITT actuators was the rotation of extension shaft into or out of the damper yoke assembly which results in misadjustment of the damper blade stop position. The reason for rotation was identified as no securing mechanism (ie. set screw) between the extension shaft and the yoke.

This problem was originally identified as affecting Bubbletight Dampers, which were supplied only to t he Palo Verde jobsite, equipped with ITT actuators. Resolution of the problem was accomplished by ANPP, wi th Ruskin, by applying Locti te 277 to the threads which attached the yoke to the extension sha ft. ANPP has evaluated 'this fix and found it to be acceptable with no impact on original damper qualifications.

L cono i tions ex i stea for other Induc ear 1 5 I I es wner husk 1 n na s s~po i dampers with ITT actuators utilizing s arne extension shaft and yoke design, without locking mechanism.

On February 2, 1989, sufficient information was available which reasonably indicated a deficiency may exist. The deficiency dis-covered indicated that the extension shaft may rotate, causing damper misadjustment which may cause actuator to overstroke or understroke, which may cause insufficient blade closure resulting in excessive leakage. In some cases this misadjustment could result in potential failure of 8905180154 8~0~02

=

linkage attachments and operability of linkage system.

r5 PDR ADOCN, 05000528 8 PNU P.Q. Box 129 ~ Grandview, Mo 64030 ~ 816/761-7476 ~ FAX: 816/765 8955

l Director, Office of "I'nspection and Enfor cement U.S.'uclear Regulatory Commission Page 2 Ruskin Division is currently evaluating a Loctite compound which may be applied, following verification of proper damper adjustment, to the threads of the extension shaft in place. Loctite 277 used at Palo Verde is also being evaluated for use at other jobsites, however, this compound requires disassembly and reassembly of the yoke extension shaft.

Attachment I to this letter identifies the affected jobsites by location and the number of units supplied for each.

Upon completion of evaluations referenced above, results will be immediately transmitted to your office and all affected jobsites.

In closing, please. find enclosed a copy of the letter describing 1I the s i tuati on contained in thi s etter, whi ch vri 1 1 1 be sent to each affected site.

If further questions should arise, please contact us at once.

Thank you for your cooperation.

Sincerely, RUSKIN t1ANUFACTURING DIVISION Thomas D. Hill President Enclosures Attachment I Notification Form Letter Note: For further discussions, questions or concerns on this matter, please contact:

Richard J. Yarges Vice President, (juality 1-816-761-7476 RY/r lm

ATTACHMENT"I Shearon Harris Nuclear Plant Carolina Power E Light Co.

P.O. Box 101 New Hill, NC 27562 36 operators Attn: L. I. Lof1 in Manager, Engineering Palo Verde Nuclear Gen. Plant Arizona Nuclear Power Project P.O. Box 52034 Phoenix, AZ 85072-2034 42 operators Attn: E.C. Sterling Engineering Manager Oconee Nuclear Plant Duke Power Co.

P.O. Box 33189 Quality Assurance Dept.

Charlotte, NC 28242 9 operators Attn: Q.A. Manager, Vendors Div.

Catawba Nuclear Plant Duke Power Co.

See Above 57 operators Attn: Q.A. Manager, Vendors Div.

Enrico Fermi Nuclear Plant Detroit Edison Co.

Fe. mi 2 6400 N. Dixie Highway Newport, MI 48166 40 operators Attn: Gregory Brooks Materials Manager, Warehouse Bldg. 105 TAC

r MK,IIFS INGRPRIES INC.

Air Distribution Group Ruskin Division Manufacturing Quality Components for Better Building Attention:

Subject:

Oamo . s with ITT Actuators It has recently come to our attention that dampe. s supplied to you with ITT Actuators may, in some instances, become out of adjus..".ent due to the extension shaft from the actuator rotating in the yok This misadjustment could result in excessive leakage or possible failure of linkage attachments and operability of linkage syste:-..

We have supplied safety related dampers with a total of ITT operator linkage systems. We are evaluating potential fixes which would allow in place correction.

Ruskin Oivision has notified the Nuclear Regulatory Commission of this situation in accordance with the requirements of 10 CFR oar: 21.

We will be contacting you with further information and making arrange-ments to rework the dampers as soon as possible.

Sincerely, RL'Si;!;l:tAtt"."-.-," "R I ilG O I '/ I S I 0'l P.O. Box 129 ~ Grandview, Mo 64030 ~ 816/761-7476 ~ FAX: 816/765.8955