Part 21 & Updated Interim Deficiency Rept RER-QSE 86-47 Re Diesel Engine Generator Failure.Initially Reported on 861223.Iron Plated Rod Previously Identified as 6 Should Be Rod 9.Final Rept Will Be Submitted by 870220
ML20212Q123
Person / Time
Site: Palo Verde  
Issue date: 01/13/1987
From: Haynes J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
REF-PT21-87, REF-PT21-87-009-000 ANPP-39703-JGH, PT21-87-009-000, PT21-87-9, RER-QSE-86-47, NUDOCS 8702020152
Download: ML20212Q123 (3)


Text

%

Arizona Nuclear Power Project P O. BOX 52034 e PHOENIX, ARIZONA 85072-2034 January 13, 1987 ANPP-39703-JGil/DJW/DRL-92.11 U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:

Mr. D. F. Kirsch, Director Division of Reactor Safety and Projects Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, 3 Docket No 530

Subject:

Update to Interim Report - RER-QSE 86-47 A 50.55(e) Potentially Reportable Deficiency and 10CFR21 Relating to Diesel Generator Engine Failure File: 87-006-216

Reference:

(A) Telephone Conversation between D. Willet and R. Rouse on December 23,1986 (Initial Notification - RER-QSE 86-47)

(E) ANPP-39650, dated January 9, 1987 (Interim Report - RER -

QSE 86-47)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in reference A and an interim report by reference B.

Additional information to update reference B is attached. It is still expected that this information will be finalized by February 20, 1987 at which time a complete report will be submitted.

Very trul yours, A

J. G. Ilaynes Vice President Nuclear Production

~

JGil/DRL:kp

n b:

8 x

w m

Attachments c$

  1. T cc: See Page 2 g

h,,

o W

o 8702020152 870113 PDR ADOCK 05000528 S

PDR k

ff'lf

T Update to Intelim Report RER-QSE 86-47 Mr. D. F. Kirsch Director Page Two January 13, 1987 ANPP-39703-JGH/DJW/DRL-92.11 cc:

J.11. Taylor Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 A. C. Gehr (4141)

R. P. Zimmerman (6295)

Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339 r

e k

sw.

'a i.

UPDATE TO INTERIM REPORT - RER-QSE 86-47 POTENTIAL REPORTABLE DEFICIENCY ARIZONA NUCLEAR POWER PROJECT (ANPP)

PVNCS UNITS 1,'

2, 3 The iron plated rod in the Unit 2A diesel generator, was the number nine (9) connecting rod and not the number six (6) connecting rod as previously l

indicated.

Incorrect information originally supplied was a result of incorrect verbal Information received from the vendor.

i Because of this communication problem, traceability of location and serial numbers for diesel generator connecting rods will be verified by ANPP.

- I 1

3 l

4 I

b i

t I

I t

i 2

3 1

i i

4 9

l 5

g I

m.

m

-