ML20096E043

From kanterella
Revision as of 20:32, 1 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Feb 1992 for Brunswick Nuclear Electric Plant,Unit 2,correcting Number of Hours Reactor Critical
ML20096E043
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 02/29/1992
From: Rumple R
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20096E031 List:
References
NUDOCS 9205190037
Download: ML20096E043 (1)


Text

. _ .

CP5L CO PLANT PERFORMANCE DATA-SYSTEM PAGE 2 RUN'DATE 05/06/92 OPERATING DATA REPORT RPD36-000

' RUN TIME 12:26:13 BRUNSWICK UNIT 2 DOCKET NO. 050-0324 COMPLETED BY RONALD RUMPLE OPERATING STATUS TELEPHONE (919)457-2752

1. UNIT NAME: BRUNSWICK UNIT 2 NOTES
2. REPORTING PERIOD: FEBRUARY 92
3. LICENSED THERMAL POWER (MWT): 2436
4. NAMEPLATE RATING (CROSS MWE): 867.0 1 5. DESIGN ELECTRICAL CATING (NET MWE): 821.0
6. MAX DEPENDABLE CAPACITY (GROSS MWE) : 782.0 -------------------------------
7. MAX DEPENDABLE CAPACITY (NET MWE) : 754.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE\:
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL t MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 696.00 1440.00 143112.00
12. NUMBER OF HOURS REACTOR. CRITICAL 474.31 1140.50 90853.55
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS GENERATOR ON LINE 408.92 965.03 85918.52
15. UNIT RESERVE SHUTDOWN FOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 780272.24 1916584.39 181847285.04
17. GROSS ELEC. ENERGY GEN. (MWH) 259810.00- 635225.00 58819319.00
18. NET ELEC. ENERGY GENERATED (MWH): 248391.00 610387.00 FC100859.00-
19. UNIT SERVICE FACTOR 58.75 67.02 60.04
20. UNIT AVAILABILITY FACTOR 58.75 67.02 60.04
21. UNIT CAP. FACTOR (USING MDC NET) 47.33 56.22 50.05- ,
22. UNIT CAP. FACTOR (USING DER NET) 43.47 51.63 48.00
23. UNIT FORCED OUTAGE RATE 41,25 22.93- 13.49
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE,-DATE, AND DURATION.OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY -------- --------

i INITIAL ELECTRICITY --------- --------

COMMERCIAL OPERATION -------- ---------

1.16 -9 s

9205190037 920509 PDR ADOCK 05000324 F PDR

.R . - - - ..