ML20096E056

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Mar 1992 for Brunswick Nuclear Electric Plant,Unit 2,correcting Number of Hours Reactor Critical
ML20096E056
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 03/31/1992
From: Rumple R
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20096E031 List:
References
NUDOCS 9205190044
Download: ML20096E056 (1)


Text

.

CP&L CO PLAFT PERFORMANCE - DATA - SYSTEM '

PAGE:

J21 FLV %TE 05/06/92

' OPERATING DATA REPORT' RPD36-000' RLd lime 12:26:55 BRUNSWICK UNIT _2 F

DOCKET NO. 050-0324 COMPLETED'BY RONALD RUMPLE-OPERATING STATUS TELEPHONE- (919)457-2752-

1. UNIT NAME: BRUNSWICK UNIT 2 l NOTES _
3. REPORTING PERIOD: MARCH 92
3. LICENSED THERMAL POWER (MWT): 1436
4. NAMEPLATE RATING-(GROSS'MWE): 867.0
5. DESIGN ELECTRICAL RATING (NET MWE): 821.0
6. M.AX DEPENDABLE CAPACITY (GROSS MWE): 782.0
7. MAX DEPENDABLE CAPACITY (NET MWE): 754.0 8 '. IF CHANGES OCCUR IN: CAPACITY RATINGS (ITEMS 3-THRU 7)_SINCE:LAST. REPORT, GIV" REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED IF ANY- (NET MWE) :

10.-REASONS FOR RESTRICTION IF ANY:

i THIS-YR TO '

CUMUL'-

MONTH LDATE

'ATIVE

_.i

11. HOURS IN REPORTING PERIOD

.744.00 2184.00' 143856.00-

13. NUMBER OF HOURS REACTOR CRITICAL 744.00 1884'.50 91597'.55
13. REACTOR RESERVE SHUTDOWN HRS

.00

. 00

.00~

14. HOURS GENERATOR ON LINE 744.00-

-1709.03' 86662.52

- 15. UNIT RESERVE SHUTDOWN HOURS

.00

.00

__.00,

16. GROSS THERMAL ENERGY GEN.-(MWH) 1348483.85 3265068.24: 183195768.89'
17. GROSS ELEC. ENERGY GEN. (MWH)-

438580.00

=.1073805.00 59257899.00

18. NET ELEC. ENERGY GENERATED (MWH) 424023.00

-1034410.00

-56824882.00

19. UNIT SERVICE FACTOR 100.001 78.25 60.24
20. UNIT AVAILABILITY-FACTOR' 100.00 78.25!

60.24

31. UNIT CAP.-FACTOR-(USING MDCl NET) 75.'59
62.82:

50.18:

22. UNIT CAP. FACTOR (USING DER' NET)-

69.42-

-57.691 148.11--

33. UNIT FORCED OUTAGE RATE

.00--

14'.38-13.39.

24. SHUTDOWNS SCHED. OVER NEXT 6 HONTHS (TYPE, DATE, AND_ DURATION:OF_EACH):

i

35. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:

4

- 26. UNITS IN TEST STATUS-(PRIOR TO COMMERCIAL OPERATION):._ FORECAST ' ACHIEVED

-INITIAL CRITICALITY INITIAL ELECTRICITY

. COMMERCIAL' OPERATION 1.16 - 9 9205190044 920509 DR ADOCK 0500 4