Corrected Monthly Operating Rept for Mar 1992 for Brunswick Nuclear Electric Plant,Unit 2,correcting Number of Hours Reactor Critical
ML20096E056
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 03/31/1992
From: Rumple R
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20096E031 List:
References
NUDOCS 9205190044
Download: ML20096E056 (1)


Text

. .- - . . - _ - .. - . . . _- - - .. _. - . . - .

CP&L CO PLAFT PERFORMANCE - DATA - SYSTEM ' PAGE: J21 FLV %TE 05/06/92 ' OPERATING DATA REPORT' RPD36-000' RLd lime 12:26:55 BRUNSWICK UNIT _2 >

F DOCKET NO. 050-0324 COMPLETED'BY RONALD RUMPLE- ,

OPERATING STATUS TELEPHONE- (919)457-2752-

1. UNIT NAME: BRUNSWICK UNIT 2 l NOTES _
3. REPORTING PERIOD: MARCH 92
3. LICENSED THERMAL POWER (MWT): 1436
4. NAMEPLATE RATING-(GROSS'MWE): 867.0

, 5. DESIGN ELECTRICAL RATING (NET MWE): 821.0

6. M.AX DEPENDABLE CAPACITY (GROSS MWE): 782.0 -------------------------------
7. MAX DEPENDABLE CAPACITY (NET MWE): 754.0 8 '. IF CHANGES OCCUR IN: CAPACITY RATINGS (ITEMS 3-THRU 7)_SINCE:LAST. REPORT, GIV" REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY- (NET MWE) :

10.-REASONS FOR RESTRICTION IF ANY:

i THIS- YR TO ' CUMUL'--

MONTH LDATE 'ATIVE

_.i

11. HOURS IN REPORTING PERIOD .744.00 2184.00' 143856.00-
13. NUMBER OF HOURS REACTOR CRITICAL 744.00 1884'.50 91597'.55  :
13. REACTOR RESERVE SHUTDOWN HRS .00 .

. 00 .00~

14. HOURS GENERATOR ON LINE 744.00- -1709.03' 86662.52

- 15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .

- __.00, ,

16. GROSS THERMAL ENERGY GEN.-(MWH) 1348483.85 3265068.24: 183195768.89'
17. GROSS ELEC. ENERGY GEN. (MWH)- 438580.00 =.1073805.00 59257899.00
18. NET ELEC. ENERGY GENERATED (MWH) 424023.00 -1034410.00 -56824882.00
19. UNIT SERVICE FACTOR 100.001 78.25 60.24
20. UNIT AVAILABILITY-FACTOR' 100.00 78.25! 60.24
31. UNIT CAP.-FACTOR-(USING MDCl NET) 75.'59 :62.82: 50.18:
22. UNIT CAP. FACTOR (USING DER' NET)- 69.42- -57.691 148.11--
33. UNIT FORCED OUTAGE RATE .00-- 14'.38- 13.39.
24. SHUTDOWNS SCHED. OVER NEXT 6 HONTHS (TYPE, DATE, AND_ DURATION:OF_EACH):

i . .

-- 35. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:

4

- 26. UNITS IN TEST STATUS-(PRIOR TO COMMERCIAL OPERATION): ._ FORECAST ' ACHIEVED

-INITIAL CRITICALITY --------

INITIAL ELECTRICITY -------- --------

. COMMERCIAL' OPERATION  :--- --- --------

1.16 - 9 9205190044 920509 4 DR ADOCK 0500