Final Deficiency Rept DER 84-21 Re Rosemount Transmitters Not Torqued to Specified Value.Initially Reported on 840430. Units 1 & 2 Mounting Hardware Replaced to Conform W/Matl & Installation Requirements
ML20099F614
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 11/05/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-31033-TDS, DER-84-21, NUDOCS 8411260520
Download: ML20099F614 (5)


Text

,

.'s :. .

fGOWo t:.

Arizona Public Setvice Company

~

C !:0 7 - 3 f.u w ; y November 5, 1984 .-

ANPP-31033-TDS/TRB'*,.,.," ' Y IiE U. S. Nuclear Regulatory Commission Region V . .

Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Waln'at Creek, California 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Reactor Safety and Projects e

Subject:

Final Report - DER 84-21' A 50.55(e) Reportable Condition Relating To Rosemount Transmitters Not Torqued To Specified Value.

File: 84-019-026;'D.4.33.2

Reference:

A) Telephone Conversation Mtween T. Young and J. Cook 'on April 31, 1984 B) ANPP-29530, dated May 17, 1984 (Interim Report)

C) ANPP-30353, dated August 29, 1984 (Time Extension)

D) ANPP-30532, dated Septeraber 27, 1984 (Time Extension)

E) ANPP-30930, dated October 26, 1984 (Time Extension)

Dear Sir:

Attached is our final written report of the Reportable Deficiency under 10CFR50.55(e), referenced above.

Very truly yours, om (

E. E. Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director

, EEVB/TRB/nj Attachment j' cc: See Page Two l

8411260520 841105 PDR ADOCK 05000528 S PDR l-

\

. .TE-A7

7:- --

,  :. 'e v t 'Mr. T.-W. Bish'p o DPR 84-21

--Page Two ice:' Richard DeYoung, Director Office of Inspection and Enforcement -

U. S. Nuclear Regulatory Commission -

Washington, D.'C. 20555 T. G. Woods, Jr.

D. P. Karner l

.W. E. Ide D. B. Fasnacht A.' C.' Rogers

., lL. A. Souza D.'E. Fowler T. D. Shriver C. N. Russo B. S.-Kaplan J. Vorees J. R. Bynum-J. M. Allen A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson R. P. Zimmerman L. Clyde M. Woods T. J. Bloom ,

D. N. Stover J. D. Houchen J. E. Kirby D. Canady Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339 i

l i l

-l l

l

. - - _. _. 1

x

. ; ' . :: , n

~

pg p_'+3; - ^~ -

y a -

4.

o

, ~

FINAL REPORT:- DER.84-211 I b2FICIENCY. EVALUATION 50.55(e).

ARIZONA'PUBLIC SERVICE COMPANY (APS) x PVNGS UNITS 1, 2, 3 4I.- DescripEion'of'Deficidacy-During a routine site. audit, the following_ discrepancies between i design drawings and "as-built", configurations.were noted:

A. ' Combustion Engineering (C-E). Drawings N001-13.01-727 andL-728'

- specify 300 series stainless. stee1' instrument-to-bracket mounting '

hardware for Rosemount transmitters supplied by 'C-E.' NCR SJ-37121 documents the use in Unit 1 of numerous carbon ' steel nuts and .

bolts having no grade markings and strong magnetic properties. ,

B. - Bechtel Drawings 13-J-ZZS-161, -162, -165, -166,~ -167, -168,

-174, and .-178 specify ASTM A193,' CL2 and GRB8 bracket-to-panel

~

mounting nuts and bolts for certain Rosemount transmitters. NCR- 2 SJ-3713 documents nuts without proper marking cut many transmitter installations in Unit 1.

Following the initial routine site audit, an extensive walkdown was done in Units 1 and 2. "

'EvaluaEion The subject transmitters measure pressure, level, and flow-rates in several safety-related systems. (LPSI pump A discharge flow, reactor coolant system pressure,' steam generator level.and MSIV hydraulic-accumulator pressure). Specific tag numbers for transmitters are identified in referenced SFRs and NCRs.

These instruments require mounting hardware of specific grade

material, along with proper docunentation and identification mark to

+

permit traceability. Also, thecinstallation of these transmitters should strictly adhere to mounting procedures and. detail inspection and acceptance codes.

In the event of a DBE, instruments not properly mounted could become. ,

disengaged and not perform their intended safety function.

The. root cause for the deficiencies described herein is the craftsmen's failure to pro'perly install the ins'truments and the failure of field-engineers and quality control to identify the use of improper materials.

II. Analysis of Safety Implications l; Based upon the>abovei this condition is evaluated as reportable under L 10CFP50.55(e); since, if left uncorrected, it could represent a L 'significant safety hazard.

= .

l This condition is evaluated as not reportable under 10CFR Part 21

l. since it does not constitute a' defect in a basic component.

L

~

---,,b., , - - - . ~ . .- - , , + - . --+ w ~ ., -, , , ~:. - -

., -  ;. , w r,. . .

ix 5

k

- Final Report DER'84-21 Page Two.

~

III. Corrective iction-In Units 1 and 2 mounting hardware (bolts and nuts) were replaced to

conform with material,and installation requirements. In certain cases, the vendor (C-E) advised that specific installed hardware were an acceptable substitute (e.g., carbon steel in lieu of 300 series ,

stainless steel). Where this occurred, the vendor prints were revised (see referenced FCR) to reflect the alternate acceptable '

material. The above corrective action will be implemented and documented -by referenced.SFRs/NCRs list in Section IV.

Specific instructions'(IOM-E-11465) have been issued to Construction

to assure proper installation and preclude recurrence of this deficiency in Unit 3. - Also, a walkdown of 26 sample Q-class installations per unit is being done per Project Validation of Q .

Instrument Procedure No. 5.26-08 to'further assure that other Q-class installations are installed per the requirements of the design documents.

IV. References (1) SFRs/NCRs NCR No. SJ-3712

-3713

-4618

-4619 Sr2 2SE-2082/NCR SJ4688 SFR 2EC-3083/NCR SJ4669 SFR 2SB-3084 -

SFR 2SB-3085 -

SFR 2SB-3086 -

SFR -2RC-3087/NCR SJ4690 SFR 2CH-3088 -

SFR 2CH-3089/1?CR SJ4691 SFR 2RC-3090/NCR SJ4692 SFR 2RC-3091 -

SFR 2RC-3092/NCR SJ4693 SFR 2SI-3093 -

SFR 2EW-3094/NCR SJ4694 SFR. 2SB-3095/NCR SJ4695 SFR 2NC-3096/NCR SJ4696 SFR 2CT-3097/NCR SJ4697 SFR 2SG-3098/NCR SJ4698 SFR 2AF-3099/NCR.SJ4699

, - - . , .n . - - . - - - ...,4 -- - . - - - . . - >7 ,

p. -,

, . s . : , +;: y. <

p:

. Final Report

, DER 84-21 1 Page Three

'(2) Correspondence C-E Letter IV-CE-30018-April 2,-1984

-IOM E-11/*65 September 19, 1984_MCC #333342 Letter B/ANPP-E-122970 October 12, 1984 (3) FCRs 78,677N 82,609N 4

-. '