ML20101U059

From kanterella
Revision as of 09:09, 28 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Amended Deficiency Rept,Item 111 Re Design Defect on RHR Reservoir Freeze Over.Temporary Auxiliary Boiler Will Be Used to Add Heat to RHR Svc Water Reservoirs,Instead of Operating Emergency Diesel Generators
ML20101U059
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/15/1985
From: Jens W
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
111, EF2-70232, NUDOCS 8502060561
Download: ML20101U059 (1)


Text

1 I

Wayne H. Jens

. Vt23 PrCsident Nuclear Operations

"-"2

[hehtWt 6400 North Dixie Highway Edison :=r-- Januery 15, 1985 EF2-70232 Mr. James G. Keppler Regional Administrator Region III.

U..S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

Reference:

(1) Fermi 2 NRC Docket;No.-50-341 (2) Letter, D. A. Wells to J. G. Keppler February 6,1984, QA-84-0079 (3) Letter, W. H. Jens to J. G. Keppler July 5, 198 4, EF2-69272 i

l (4) Letter, W. H. Jens to J. G. Keppler November 30, 19 8 4, EF 2-70219

Subject:

Amended Report of 10CFR50.55(e)

Item 111, " Design Deficiency on the RHR Reservoir Freeze Over" l Detroit Edison will use a temporary auxiliary boiler to add any heat necessary to prevent freezing of'the~ Residual Heat Removal Service Water (RHRSW) reservoirs tais winter.

4 Therefore, Detroit Edison will not operate the Emergency Diesel Generators to supply heat'to the RHRSW reservoirs as had been indicated in References (3) and (4).

, If.you have any questions concerning this matter, please contact Mr.' Lewis Bregni,.(313)'586-5083.

1 Sincerely, J.

cc: P. M. Byron R. C. DeYoung /g g

/

R. C. Knop M. D. Lynch Q (

. USMRC, Document Control Desk-20555 1

Washington, D.C.

8502060561 850115 PDR ADOCK 05000341 MM351985' S PDR Qk f30lo r