ML20073S325

From kanterella
Revision as of 04:02, 27 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Initial Approach to Power Tests (B-Series), Interim Rept 26 for Period Ending 830222
ML20073S325
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 02/22/1983
From:
PUBLIC SERVICE CO. OF COLORADO
To:
Shared Package
ML20073S318 List:
References
NUDOCS 8305060552
Download: ML20073S325 (2)


Text

.- -

~

THE FORT ST. VRAIN INITIAL APPROACH TO POWER TESTS (B-SERIES)

INTERIM REPORT 26 4 Report for Period Ending February 22, 1983 I

i j

l l

8305060552 830413 DR ADOCK 05000gsy PDR t

3 . v.. ._

_1 Interim Report 21 covering the 90-day period from August 23, 1931, to November 22, 1931, reported the completion of the majority of tests at 100% of plant load. Since the plant had just completed a modification outage in April, 1982, and has not attained significant power levels required for remaining tests, no further initial approach to power tests were performed during the 90-day period ending February 22, 1983.

Future interim reports will report the results of any startup tests which still remain in the "open" status.

c.- n , - - - - .,------,,,a , - - , - - - -