A THE FORT ST. VRAIN INITIAL APPROACH TO PCWER (E-SERIES)

INTERIM REPC;T 45 Recort Fcr Fer'eca F.nding August 5,1935 i

8809190193 880080

( 3~ h PDR ADCCK 05000267

$6 P

PDC

(/

A Interim Report 21 covering tne 90-dav period rem August 23, 1981, to Novemoer 22, 1931, recorted the completion of the majority of tests at 100*. of olant load.

Sionificant cower levels or appropriate piant conditions recuired for remaining tests have not b e 5.n achieved since then. Dwing the period covered by tnis report, the reactor did not operate above S C'.

power.

The reactor is currently limited to 82'. power by the Nuclear Regulatory Cc mission.

No further initial approach to power tests were perfor.ed curing the 90-day period ending August 8, 19EB.

Further interim reports will report the results of any :tartup tests whir.h will remain in the "open" status.

(

hPublic Service ~

Company of Colottdo 16805 WCR 19 1/2, Platteville, Colorado 80651 September 15, 1988 Fort St. Vrain Unit No, 1 P-SS335 U. S. Nuclear Regulatory Commission ATIN:

Document Control Desk Wa,hington, 0.C.

20555 Docket No. 50- 07

SUBJECT:

siARTUP REPORT #48 FOR FORT ST. VRAIN NUCLEAR GENERATING STATION, UNIT NO. 1

REFERENCE:

Facility Operating License Number DPR-34

Dear Sirs:

Attached, please find a copy of the forty-eighth Startup Report for Fort St. Vrain Nuclear Generating Station, Unit No. 1.

This report cove,*s the period from M4y 11, 19F.*, through August 8, 1988.

This report is being submitted in fulfillment of the requirements of Section 7.5.la of the Fort St. Vrain Technical Specifications.

If you have any questions, please contact Mr. M. H. Holmes at (303) 480-6960.

Sincerely, C A \\, C k C. H. Fuller Manager, Nuclear Production Attachment cc: