c February 10, 1989 Fort St. Vrain Unit No. 1 P-89054 U. S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Docket No. 50-267 THE FORT ST, VRAIN INITIAL APPROACH l
TO FCWER (B-SERIES) l l
l INTERIM REPORT 50 Report For Period Ending February 4,1989 i
8903010006 :::v0z 10 s
PDR ADOCK 05000267
- p P
PDC i
\\
w i)
I February 10, 1989 l.
Fort St. Vrain l'
Unit No. 1 P-89054 l
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.
20555 l
Docket No. 50-267 l
1 Interim Report 21 covering tha 90-day period from August 23, 1981, to November 22, 1981, reported the completion of the majority of tests at 100% of plant load.
Significant power levels or appropriate plant conditions required for rem 61ning tests have not been achieved since then. During the period covered by this report, the reactor did not operate above 80% power.
The reactor is i
currently limited to 82% power by the Nuclear Regulatory Commission.
)
No farther initial approach'to power tests were performed during the l
90-day period ending February 4,1989.
i Further interim reports will report the results of any startup tests which will remain in the "open" status.
s..
hPublicService~
==;&,.
February 10, 1989 Fort St. Vrain Unit No. 1 P-89054 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.
20555 Docket No. 50-267
SUBJECT:
STARTUP REPORT #50 FOR FORT ST. VRAIN NUCLEAR GENERATING STATION, UNIT NO. 1
REFERENCE:
Facility Operating License Number DPR-34
Dear Sirs:
Attached, please find a copy of the fif tieth Startup Report for Fort St. Vrain Nuclear Generating Station, Unit No. 1.
This report covers the period from November 6, 1988, through February 4, 1989. This report'is being submitted in fulfillment of the requirements of Section 7.5.la of the Fort St. Vrain Technical Specifications.
If you have any questions, please contact Mr. M. H. Hoimes at (303)-
480-6960.
Sincerely, C. H. Fuller Manager, Nuclear Production CHF:cas cc: Regional Administrator, Region IV ATTN:
Mr. T. F. Westerman, Chief Project Section B Mr. Robert Ferrell L
Fenior Resident Inspector, FSV l.
L Attachment k