THE FORT ST. VRAIN INITIAL APPROACH TO POWER (B-SERIES) i l

INTERIM REPORT 41 Report For Period Ending November 16, 1986 8612300376 861210 PDR ADOCK 05000267 P

PM A

c-Interim Report 21 covering the 90-day period from August 23, 1981, to November 22, 1981, reported the completion of the majority of tests at 100% of plant load.

Significant power levels or appropriate plant conditions required for remaining tests have not been achieved since then. During the period covered by this report, the reactor was shutdown on May 31, 1986, to perform Environmental Qualification modifications.

No further initial approach to power tests were performed during the 90-day period ending November 16, 1986.

Further interim reports will report the results of any startup tests which will remain in the "open", status.

,