Fort St Vrain Initial Approach to Power (B Series), Interim Rept 34 for Period Ending 850220
ML20100E354
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 03/15/1985
From: Gahm J
PUBLIC SERVICE CO. OF COLORADO
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
P-85076, NUDOCS 8504030426
Download: ML20100E354 (3)


Text

'

/

)

v (

THE FORT ST. VRAIN INITIAL APPROACH TO PCWER (B-SERIES)

INTERIM REPORT 34 Report For Period Ending February 20, 1985 l

k

@d65'O(0f U

O hek.g)C

/

8504035426 850315 DR ADOCK0500g7

).

4 P

$0 y./{

L

. Interim Report 21 covering the 90-day period from August 23, 1981, to November 22, 1981, reported the completion of the majority of tests at 100*4 of plant load. Significant power levels or appropriate plant coriditions required for remaining tests have not been achieved since then. At present, the reactor is shutdown for control rod drive refurbishment.

No further initial approach to power tests were performed during the 90-day period ending February 20, 1985.

Future interim reports will report the results of any startup tests which will remain in the "open" status.

(

-C...

.i Pui>iie service comimn.v =# C:E = 2*

16805 WCR 19 1/2, Platteville, Colorado 80651 s

March 15, 1985 Fort St. Vrain Unit #1 P-85076 Regional Administrator M@M0WM %

Region IV U.S. Nuclear Regulatory Commission E2lE 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 p

ATTN: Mr. E. H. Johnson Docket No.

50-267

REFERENCE:

Facility Operating License No. DPR-34

SUBJECT:

Thirty-fourth Startup Report For Fort St.

Vrain Nuclear Generating Station, Unit No. 1

Dear Mr. Johnson:

Enclosed, please find a copy of the thirty-fourth Startup Report for Fort St. Vrain Nuclear Generating Station, Unit No. 1.

This report covers the period from November 23, 1984, thrcugh February 20, 1985, and is submitted in fulfillment of the requirements of Section 7.5.la of the Fort St. Vrain Technical Specifications.

Sincerely,

/J. W/Gahm

  1. Manager, Nuclear Production Enclosure cc: Director, I & E Director, MIPC JWG/djm NdOh p omk' sal-RT-To l.