Initial Approach to Power (B-Series) Startup Test Rept, for Period Ending 840820
ML20098F658
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 08/20/1984
From: Gahm J
PUBLIC SERVICE CO. OF COLORADO
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
P-84354, NUDOCS 8410030223
Download: ML20098F658 (3)


Text

v. ,

1 public servlee company oe conende.  !

l

. 16805 WCR 19 1/2, Platteville, Colorado 80651 September 13, 1984 I

' Fort St. Vrain Unit #1 P-84354 Mr. E. H. Johnson, Chief Reactor Project Branch 1 3@@@h@k Region IV Nuclear Regulatory Commission $@ l 8 M 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 -

I

REFERENCE:

Facility Operating License No. DPR-34 Docket No. 50-267

Dear Mr. Johnson:

Enclosed, please find a revised copy of the thirty-second Startup Report for Fort St. Vrain Nuclear Generating Station, Unit No. 1.

This report covers the period from May 23, 1984, through August 20, 1984, and is submitted in fulfillment of the requirements of Section 7.5.la of the Fort St. Vrain Technical Specifications.

Sincerely, .

W. Gahm Manager, Nuclear Production Enclosure cc: Director, I & E Director, MIPC JWG/djm l

l 8410030223 840820 \

PDR ADOCK 03000267 R

/

PDR gD  !

SoS go

$*[# \

r THE FORT ST. VRAIN INITIAL APPROACH TO l

POWER (B-SERIES) I 1

INTERIM REPORT 32 l Report for Period Ending August 20, 1984 i

t b 'imi --

_____m__ _ _ _. ___h_ _m__

1 4

Interim Report 21 covering the 90-day period from August 23, 1981, to November 22, 1981, reported the completion of the majority of tests at 100% of plant load. Significant power levels or appropriate plant conditions required for remaining tests have not been achieved since then, however. At present, the reactor is shutdown for an investigation of six control rod pairs that failed to automatically insert upon actuation of the Plant Protective System Scram logic. No further initial approach to power tests were performed during the 90-day perind ending August 20, 1984.

Future interim reports will report the results of any startup tests which still remain in the "open" status.

_ _ - - _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - . _ _ _ _ _