Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20148U0111997-06-17017 June 1997 Confirmatory Survey of Group E Effluent Discharge Pathway Areas Fsv Nuclear Station Platteville,Co ML20133D7661996-09-16016 September 1996 Confirmatory Survey Plan for Fsv Nuclear Station Decommissioning Project ML20129A4621996-09-11011 September 1996 Rev 0 to Fsv Decommissioning Project Final Survey Requirements for Liquid Effluent Pathway ML20100L3581996-02-22022 February 1996 Proposed Tech Specs,Submitting Corrected Version of Plant Decommissioning TS Updated to Reflect All Approved Amends ML20097C2601996-01-17017 January 1996 Confirmatory Survey Activities Plan for Fsv Nuclear Station PSC Platteville,Co ML20101F2091995-09-18018 September 1995 Issue 7 to DPP 5.4.2, Odcm ML20084B8801995-05-25025 May 1995 Rev 1 to Fsv Nuclear Station Decommissioning Project Final Survey Plan for Site Release ML20084B6881995-05-10010 May 1995 Issue 5 to Fire Protection Operability Requirements (Fpor) FPOR-7, Fire Extinguishers ML20082K2461995-04-14014 April 1995 Proposed Decommissioning Tech Specs Administrative Control 5.3.1,reflecting Organizational Changes That Impact Membership of Decommissioning Safety Review Committee ML20082T2151995-04-12012 April 1995 Issue 7 to Fire Protection Operability Requirements (Fpor) FPOR-12, Fire Detectors ML20082B9411995-03-17017 March 1995 Confirmatory Survey Plan for Repower Area,Fort St Vrain, Platteville,Co ML20082C0801995-03-16016 March 1995 Proposed Confirmatory Survey Plan for Repower Area,Fort St Vrain,Platteville,Co ML20082B9821995-03-15015 March 1995 Instrumentation Comparison Plan Between Orise & Fort St Vrain ML20086S2471995-02-0909 February 1995 Decommissioning Plan for Fort St Vrain Nuclear Generating Station ML20077C7171994-11-30030 November 1994 Issue 9 to FPOR-14, Fire Protection Operability Requirements ML20078C0641994-10-12012 October 1994 Revised Fire Protection Operability Requirements,Including Issue 21 to Depp Table of Contents,Issue 2 to FPOR-22 & Issue 3 to FPOR-23 ML20081J7951994-09-15015 September 1994 Issue 5 to DPP 5.4.2, Odcm ML20063M1551994-02-17017 February 1994 Rev 0 to Fsv Nuclear Station Decommissioning Project Final Survey Plan for Site Release ML20057A6151993-08-30030 August 1993 Issue 2 to FPOR-23, Fire Water Makeup Sys ML17291B3261993-05-18018 May 1993 Proposed TS Section 2.2 Re Activated Graphite Blocks,Section 2.4 Re Channel Calibr & SR 3.2.1 Re Verification of Reactor Bldg Pressure & SR 3.2.2 Re Verification of Pressure Drop Across Each HEPA Filter ML20036A8241993-05-0707 May 1993 Proposed TS 4.3 Re Prestressed Concrete Reactor Vessel Water Leakage Protection ML20118B2141992-09-25025 September 1992 Proposed Decommissioning Tech Specs Replacing Radiation Safety with Nuclear Safety, Revising Applicability Requirements for Specs Dealing W/Reactor Bldg Confinement Integrity & Clarifying Items Re Unreviewed Safety Questions ML20114D6871992-09-0101 September 1992 Tritium Leach Test on H-327 Graphite ML20096H1961992-05-19019 May 1992 Decommissioning TS Deleting Section 4.2.15 Re LCO 4.2.15 Covering Pcrv Cooling Water Sys Temps ML20095B0951992-04-14014 April 1992 Proposed Tech Specs Re Organization,Review & audit-administrative Controls ML20094L2831992-03-19019 March 1992 Proposed Tech Specs Re Controls & Limits Appropriate for Decommissioning ML20086C5301991-11-15015 November 1991 Proposed Tech Spec Limiting Condition for Operation 4.2.15 Re Pcrv Cooling Water Sys Temps ML20079M4261991-10-11011 October 1991 Revised Abnormal Operating Procedures,Reflecting Deletion of Issue 9 of EP Class ML20091D7631991-10-11011 October 1991 Proposed,Revised Limiting Condition for Operation 4.2.15 Re Prestressed Concrete Reactor Vessel Cooling Water Sys Temp ML20082L9311991-08-30030 August 1991 Proposed Tech Specs Re Decommissioning ML20082H8851991-08-16016 August 1991 Issue 2 to Abnormal Operating Procedure AOP-I-2, Chemical, Petroleum & Hazardous Waste Spill Response ML20091C4141991-08-0202 August 1991 Issue 58 to Abnormal Operating Procedure AOP-L, Loss of Instrument Air Header ML20024H3341991-05-10010 May 1991 Nonproprietary Rev 2 to FSV-P-SCP-100, Fort St Vrain Initial Radiological Site Characterization Program Program Description ML20072V5291991-04-12012 April 1991 Revised Defueling Emergency Response Plan,Including Section 1 Definitions,Section 2 Scope & Applicability,Section 3 Summary of Fsv Derp,Section 4 Emergency Classifications & Section 5 Emergency Organization ML20070V6871991-03-20020 March 1991 Issue 55 to Abnormal Operating Procedure AOP-R, Loss of Access to Control Room ML20072S0521991-03-15015 March 1991 Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 9 to CMIP-11, Classification of Emergency for McGuire Nuclear Station & Rev 11 to CMIP-12, Classification of Emergency for Oconee Nuclear Station ML20066J1171991-02-15015 February 1991 Issue 56 to Intro Section of Abnormal Operating Procedure (Aop),Issue 58 of AOP-A,Issue 58 to AOP-B,Issue 56 of AOP D-1 & Issue 2 of RERP-TRANSPORTATION ML20066A3781990-12-21021 December 1990 Proposed Decommissioning Tech Specs Re Reactor Bldg Integrity,Reactor Bldg Ventilation Exhaust Sys,Radiation Monitoring Instrumentation & Pcrv Shielding Water Tritium Concentration ML20059L5891990-09-14014 September 1990 Proposed Tech Specs Changing Design Features Section 6.1 to Permit Removal of CRD & Orifice Assemblies from Core Regions Defueled in Support of Plant Closure Activities ML20058N1071990-08-10010 August 1990 Issue 56 to AOP-I, Discussion of Fire ML20042F3151990-04-26026 April 1990 Proposed Tech Specs Re Defueling ML20034C7851990-04-25025 April 1990 Issue 57 to Abnormal Operating Procedure AOP-EP Q, Steam Leak or Inadvertent Lifting of Steam Relief Valve ML20034C7781990-04-25025 April 1990 Issue 57 to Abnormal Operating Procedure AOP-H-2, Abnormal Radioactive Gas Release from Plant ML20034C7831990-04-19019 April 1990 Issue 56 to Abnormal Operating Procedure AOP-N, Loss of Instrument Bus ML20034C7761990-04-19019 April 1990 Issue 55 to Abnormal Operating Procedure AOP D-1, Single Circulator Trip ML20034C7771990-04-19019 April 1990 Issue 57 to Abnormal Operating Procedure AOP-H-1, Abnormal Radioactive Liquid Waste from Plant ML20034C7841990-04-19019 April 1990 Issue 57 to Abnormal Operating Procedure AOP-P, Loss of DC Bus ML20034C7801990-04-19019 April 1990 Issue 59 to Abnormal Operating Procedure AOP-K-1, Environ Disturbances - Earthquake ML20034C7821990-04-19019 April 1990 Issue 57 to Abnormal Operating Procedure AOP-L, Loss of Instrument Air Header ML20034C7791990-04-19019 April 1990 Issue 57 to Abnormal Operating Procedure AOP-H-3, High Activity in Plant 1997-06-17
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20148U0111997-06-17017 June 1997 Confirmatory Survey of Group E Effluent Discharge Pathway Areas Fsv Nuclear Station Platteville,Co ML20133D7661996-09-16016 September 1996 Confirmatory Survey Plan for Fsv Nuclear Station Decommissioning Project ML20129A4621996-09-11011 September 1996 Rev 0 to Fsv Decommissioning Project Final Survey Requirements for Liquid Effluent Pathway ML20097C2601996-01-17017 January 1996 Confirmatory Survey Activities Plan for Fsv Nuclear Station PSC Platteville,Co ML20101F2091995-09-18018 September 1995 Issue 7 to DPP 5.4.2, Odcm ML20084B8801995-05-25025 May 1995 Rev 1 to Fsv Nuclear Station Decommissioning Project Final Survey Plan for Site Release ML20084B6881995-05-10010 May 1995 Issue 5 to Fire Protection Operability Requirements (Fpor) FPOR-7, Fire Extinguishers ML20082T2151995-04-12012 April 1995 Issue 7 to Fire Protection Operability Requirements (Fpor) FPOR-12, Fire Detectors ML20082B9411995-03-17017 March 1995 Confirmatory Survey Plan for Repower Area,Fort St Vrain, Platteville,Co ML20082C0801995-03-16016 March 1995 Proposed Confirmatory Survey Plan for Repower Area,Fort St Vrain,Platteville,Co ML20082B9821995-03-15015 March 1995 Instrumentation Comparison Plan Between Orise & Fort St Vrain ML20086S2471995-02-0909 February 1995 Decommissioning Plan for Fort St Vrain Nuclear Generating Station ML20077C7171994-11-30030 November 1994 Issue 9 to FPOR-14, Fire Protection Operability Requirements ML20078C0641994-10-12012 October 1994 Revised Fire Protection Operability Requirements,Including Issue 21 to Depp Table of Contents,Issue 2 to FPOR-22 & Issue 3 to FPOR-23 ML20081J7951994-09-15015 September 1994 Issue 5 to DPP 5.4.2, Odcm ML20063M1551994-02-17017 February 1994 Rev 0 to Fsv Nuclear Station Decommissioning Project Final Survey Plan for Site Release ML20057A6151993-08-30030 August 1993 Issue 2 to FPOR-23, Fire Water Makeup Sys ML20079M4261991-10-11011 October 1991 Revised Abnormal Operating Procedures,Reflecting Deletion of Issue 9 of EP Class ML20082H8851991-08-16016 August 1991 Issue 2 to Abnormal Operating Procedure AOP-I-2, Chemical, Petroleum & Hazardous Waste Spill Response ML20091C4141991-08-0202 August 1991 Issue 58 to Abnormal Operating Procedure AOP-L, Loss of Instrument Air Header ML20024H3341991-05-10010 May 1991 Nonproprietary Rev 2 to FSV-P-SCP-100, Fort St Vrain Initial Radiological Site Characterization Program Program Description ML20072V5291991-04-12012 April 1991 Revised Defueling Emergency Response Plan,Including Section 1 Definitions,Section 2 Scope & Applicability,Section 3 Summary of Fsv Derp,Section 4 Emergency Classifications & Section 5 Emergency Organization ML20070V6871991-03-20020 March 1991 Issue 55 to Abnormal Operating Procedure AOP-R, Loss of Access to Control Room ML20072S0521991-03-15015 March 1991 Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 9 to CMIP-11, Classification of Emergency for McGuire Nuclear Station & Rev 11 to CMIP-12, Classification of Emergency for Oconee Nuclear Station ML20066J1171991-02-15015 February 1991 Issue 56 to Intro Section of Abnormal Operating Procedure (Aop),Issue 58 of AOP-A,Issue 58 to AOP-B,Issue 56 of AOP D-1 & Issue 2 of RERP-TRANSPORTATION ML20058N1071990-08-10010 August 1990 Issue 56 to AOP-I, Discussion of Fire ML20034C7781990-04-25025 April 1990 Issue 57 to Abnormal Operating Procedure AOP-H-2, Abnormal Radioactive Gas Release from Plant ML20034C7851990-04-25025 April 1990 Issue 57 to Abnormal Operating Procedure AOP-EP Q, Steam Leak or Inadvertent Lifting of Steam Relief Valve ML20034C7841990-04-19019 April 1990 Issue 57 to Abnormal Operating Procedure AOP-P, Loss of DC Bus ML20034C7751990-04-19019 April 1990 Issue 57 to Abnormal Operating Procedure AOP-B, Reactor Scram ML20034C7771990-04-19019 April 1990 Issue 57 to Abnormal Operating Procedure AOP-H-1, Abnormal Radioactive Liquid Waste from Plant ML20034C7761990-04-19019 April 1990 Issue 55 to Abnormal Operating Procedure AOP D-1, Single Circulator Trip ML20034C7801990-04-19019 April 1990 Issue 59 to Abnormal Operating Procedure AOP-K-1, Environ Disturbances - Earthquake ML20034C7831990-04-19019 April 1990 Issue 56 to Abnormal Operating Procedure AOP-N, Loss of Instrument Bus ML20034C7791990-04-19019 April 1990 Issue 57 to Abnormal Operating Procedure AOP-H-3, High Activity in Plant ML20034C7821990-04-19019 April 1990 Issue 57 to Abnormal Operating Procedure AOP-L, Loss of Instrument Air Header ML20154M4361988-09-0909 September 1988 Rev a to EE-FP-0005, Evaluation of Cable Trays Outside of Congested Cable Area ML20154L8751988-05-26026 May 1988 Simulation Facility Program Plan ML20148Q4681988-03-31031 March 1988 Rev 2 to Guidance for Development of Simulation Facility to Meet Requirements of 10CFR55.45 ML20154L8911988-03-31031 March 1988 Rev 2 to Guidance for Development of Simulation Facility to Meet Requirements of 10CFR55.45 ML20150E3141988-03-18018 March 1988 Issue 1 to Procedure SR 5.4.1.3.8.abcd-R1, Steam Line Rupture Detection/Isolation Sys (Slrdis) Calibr & Testing for Panel I-93543 ML20150E2901987-12-31031 December 1987 Issue 5 to Procedure SR 5.3.4b1-A Loop I Shutdown Cooling Power Operated Valve Test ML20238E3541987-08-0707 August 1987 Rev a to EE-ISI-002, Condensate Line Erosion Insp Program ML20236N8681987-08-0505 August 1987 Exercise Manual Fort St Vrain Nuclear Generating Station Nrc/Fema Graded Exercise 870805 ML20235Y7861987-07-29029 July 1987 Issue 2 to MAP-4, Maint Dept Personnel Experience, Qualification & Training Requirements ML20237J6921987-06-0909 June 1987 Issue 6 to MQCIM-1, Maint QC Insp Program. Annotated Page to Rev 4 to Updated FSAR Encl ML20235Y7731987-05-25025 May 1987 Training Mgt Procedure Index ML20237J7151987-05-0101 May 1987 Issue 12 to Q-18, QA Monitoring & Audit Program ML20215H9731987-04-30030 April 1987 Revised Buckle Users Manual:Creep Collapse of Thin-Walled Circular Cylindrical Shells Subj to Radial Pressure & Thermal Gradients ML20215H6101987-04-10010 April 1987 Program Plan for Integrated Validation of NUREG-0737 Initiatives 1997-06-17
[Table view] |
Text
s.
Public rORT ST, VRAIN NUCLEAR GENERATING STATION
$9fVICge PUBLIC SERVICE COMPANY OF COLORADO D'O DOCUMENT TRANSMITTAL TO
.Lontmspt Control Desk DATE May 23. 1995 FROM _DShbie Russell Fort St. Vrain
_16E05 WCIL194 Pinttev111e. CO 80651 THE FOLLOWING MATERIAL IS TRANSMITTED HEREWITH:
1 copy of each:
Fire Protection Operability Requirements Index, dated 5-10-95, Issue 25 FPOR 7 Issue 5 O
9505310315 950510 ADOCK0500g7 PDR O
'\\
PLEASE RETURN YOUR SIGNED ACKNOWI EDGEMENT INDICATING RECEIPT OF THE ABOVE MATERIAL (SiONE DI t D AT E)
Form tC) 372 22 3374 IMTIATOR - Forward White Copy to Rec 6pient. Retam Yellow Copy RECIPIENT - Retum Acknowledged White Copy to initiator
DFPP 05-10-95 4-Issue 25 SECTION DFP.S.1 FIRE PROTECTION OPERABILITY REQUIREMENTS TABLE OF CONTENTS NUMBER TITLE ISSUE EFFECTIVE DATE FPOR-0 Fire Protection Operability 4
12-07-92 FPOR-1 Emergency Diesel Generator Carbon 4
12-07-92 Dioxide System FPOR-2 Carbon Dioxide Hose Reels -
4 12-07-92 DELETED FPOR-3 Halon Systems 5
12-07-92 FPOR-4 Deluge Spray Systems 3
12-07-92 FPOR-5 Fixed Water Spray Systems 4
12-07-92 FPOR-6 Plant Yard Hydrants 4
02-15-95 l
FPOR-7 Fire Extinguishers 5
05-10-95 FPOR-8 Breathing Air System - DELETED 3
12-07-92 FPOR-9 Fire Hose Stations 4
12-07-92 FPOR-10 Fire Water Pumps 5
02-15-05 FPOR-11 Fire Water Headers and Mains 3
12-07-92 FPOR-12 Fire Detectors 04-12 95 FPOR-13 Fire Barriers
?
13-0*-92 FPOR-14 Fire Doors 9
11-08-94 FPOR-15 Fire Dampers 5
12-07-92 FPOR-16 Fire Protection Cooldown Trains -
5 12-07-92 DELETED FPOR-17 Alternate Cooling Method (ACM) 5 12-07-92 DELE *ED FPOR-18 Ladders - DELETED 4
12-07-92 FPOR-19 Cable Wraps - DELETED 3
12-07-92 FPOR-20 Emergency Lighting - DELETED 4
12-07-92 FPOR-21 Site Fire Brigade - DELETED 2
12-07-92 FPOR-22 Storage of Activated Graphite -
2 10-12-94 DELETED FPOR-23 Fire Water Makeup System 3
10-12-94
FPOR-7 I
Iccus 5
^
4..
Pcg3 1 of 2 i
(
FIRE PROTECTION OPERABILITY REQUIREMENTS Fire Extinguishers FPOR-7 Operable Fire Extinguishers shall be in their designated locations.
APPLICABILITY: At all times.
ACTIONS:
If a Fire Extinguisher is found inoperable or missing from its designated
- location, it shall be replaced by an equivalent / alternate extinguisher within one (1) hour.
SURVEILLANCE REOUIREMENTS:
Each Fire Extinguisher shall be determined operable:
a.
At least once per 31 days, by verifying:
1)
Located in designated place.
2)
No obstruction to access or visibility.
[]
3)
Operating instructions on nameplate legible and facing
'V outward.
4)
Safety seals and tamper indicators not broken or vissing.
5)
Fullness determined by weighing or " hefting."
6)
Examined for obvious physical
- damage, corrosion, leakage, or clogged nozzle.
7)
Pressure gauge reading or indicator in the operable range or position.
8)
For wheeled units, the condition of the tires, wheels, carriage, hose, and nozzle checked.
b.
At least once per 12 months, by performing:
1)
A thorough examination of the mechanical elements of the fire extinguisher.
hose assemblies.
2)
Conductivity test of CO2 3)
Check that each extinguisher has been hydrostatically p
tested within its required frequency.
V
FPOR-7
/
Page 2 of 2 Inzus 5 e
O l
BASIS FOR FPOR-7:
To suppress incipient fires, dry chemical,
- Halon, and Carbon Dioxide portable fire extinguishers are provided throughout the station in potential fire hazard areas.
NFPA 10, Portable Fire Exinguishers, is used as guidance for the location, selection,
(
maintenance, and testing of these extinguishers.
These extinguishers are also approved by Underwriters Laboratories.
The extinguishers are inspected periodically to verify their presence in the designated location, that they are fully charged, l and are operable.
This will ensure they are available and contain l
sufficient capacity should their use be required.
I O