ML20136D040
| ML20136D040 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 12/20/1985 |
| From: | Gahm J PUBLIC SERVICE CO. OF COLORADO |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| P-85479, NUDOCS 8601060020 | |
| Download: ML20136D040 (5) | |
Text
..
THE FORT ST. VRAIN INITIAL APPROACH TO POWER (B-SERIES)
INTERIM REPi." ?'
Report For Period Ending November 20, 1985 f['If>fih
[
b 9 9 e
5 s\\\\
Interim Report 21 covering the 90-day period from August 23, 1981, to November 22, 1981, reported the completion of the majority of tests at 100% of plant load.
Significant power levels or appropriate plant conditions required for remaining tests have not been achieved since then. At present, the reactor is shutdown for Environmental Qualification. No further initial approach to power tests were performed during the 90-aay period ending November 20, 1985.
Further interim reports will report the results of any startup tests which will remain in the "open" status.
~
s' THE FORT ST. VRAlli INITIAL APPROACH TO POWER (B-SERIES)
INTERIM REPORT 37 Report For Period Ending November 20, 1985
)
sc Interim Report 21 covering the 90-day period from August 23, 1981, to November 22, 1981, reported the completion of the majority of tests at 100% of plant load.
Significant power levels or appropriate plant conditions requfred for remaining tests have not been achieved since then. At present, the reactor is shutdown for Environmental Qualification. No further initial approach to power tests were performed during the 90-day period ending November 20, 1985.
Further interim reports will report the results of any startup tests which will remain in the "open" status, d
h = -.....
o d
./
OPublic Service ~
rosii, sa..ica Company of Colorado 16805 WCR 19 1/2, Platteville, Colorado 80651
,/:
,1 4
December 20, 1985
' L (
DEC 3 01985 Fort St. Vrain
\\g:
ij j
Unit No. 1 UU d
P-8547b Regional Administrator Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 7C011 ATTN: Mr. E. H. Johnson Docket No. 50-267
SUBJECT:
Thirty-seventh Startup Report For Fort St. Vrain Nuclear Generating Station, Unit No. 1
REFERENCE:
Facility Operating License No. DPR-34
Dear Mr. Johnson:
Enclosed, please find a copy of the thirty-seventh Startup Report for Fort St. Vrain Nuclear Generating Station, Unit No. 1.
This report covers the period from August 22, 1985, through November 20, 1985, and is submitted in fulfillment of the requirements of Section 7.5.la of the Fort St. Vrain Technical Specifications.
Sincerely,
/J.W.GahmA]h Manager, Nuclear Production Enclosure t
cc: Director, I & E Director, MIPC h
8f-// 78 i