ML20128F830

From kanterella
Jump to navigation Jump to search
Fort St Vrain Initial Approach to Power (B-Series),Interim Rept 35,Rept for Period Ending 850521
ML20128F830
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 05/21/1985
From: Gahm J
PUBLIC SERVICE CO. OF COLORADO
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
P-85211, NUDOCS 8507080376
Download: ML20128F830 (3)


Text

~

F THE FORT ST. VRAIN INITIAL APPROACH TO POWER (B-SERIES)

INTERIM REPORT 35 Report For Period Ending May 21, 1985 i

I l

i I

t l

,ipOD

\\>

4o(a 5%D 9507000376 850521 i

PDR ADOCK 05000267 R

PDR

-v a

Interim Report 21 covering the 90-day period from August 23, 1981, to November 22, 1981, reported the completion of the majority of tests at 100% of plant load.

Significant power levels or appropriate plant conditions required for remaining tests have not been achieved since then. At present, the reactor is shutdown for control rod drive refurbishment and circulator bolting changeout. No further initial approach to poser tests were performed during the 90-day period ending May 21, 1985.

Further interim reports will report the results of any startup tests which will remain in the "open" status. -

O PublicService

. io., *.

Companyof Colorado 16805 WCR 19 1/2, Platteville, Colorado 80651 June 19, 1985 Fort St. Vrain Unit No. 1 P-85211 Regional Administrator b$$bb Region IV

)

U. S. Nuclear Regulatory Commission g74g 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 p

ATTN: Mr. E. H. Johnson Docket No. 50-267

SUBJECT:

Thirty-fifth Startup Report For Fort St. Vrain Nuclear Generating Station, Unit No.1

REFERENCE:

Facility Operating License No. DPR-34

Dear Mr. Johnson:

Enclosed, please find a copy of the thirty-fifth Startup Report for Fort St. Vrain Nuclear Generating Station, Unit No. 1.

This report covers the period from February 21, 1985, through May 21, 1985, and is submitted in fulfillment of the requirements of Section 7.5.la of the Fort St. Vrain Technical Specifications.

Sincerely, d

. W. Gahm Manager, Nuclear Production Enclosure cc: Director, I & E Director, MIPC

\\\\

1\\ >

JWG:djm 4

A*

,g gSy &