Fort St Vrain Initial Approach to Power (B-Series),Interim Rept 42,Rept for Period Ending 870214
ML20207T339
Person / Time
Site: Fort Saint Vrain 
Issue date: 02/14/1987
From: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
To: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
P-87093, NUDOCS 8703230456
Download: ML20207T339 (5)


Text

n D'f ;; '[ * -

1

/

-THE FORT ST. VRAIN-INITIAL APPROACH TO POWER (B-SERIES)

R INTERIM REPORT 42 Report-For Period-Ending February 14, 1987 T

7 /

V 8703230456 870214 PDR ADOCK 05000267 P

PDR

r.

i j

Interim Report'21 covering the 90-day period from Augst'23, 1981, to November 22, 1981, reported the completion of the majority of tests at 100% of plant load. Significant power levels or appropriate plant conditions required for remaining tests have not.been achieved since then.

During the period covered by this report,.the reactor was' shutdown on May 31, 1986, to perform Environmental Qualification modifications.

No further. initial approach to power tests aere performed during the 90-day period ending February 14, 1987.

Further interim reports will report the results of any startup tests which will remain in the "open" status, t'

l I

3

+'d'+w

---e

--=v.

m.

,-r

,~

-.1 y

Vs

.m f

-... :- +.;,

1 THE FORT ST.-VRAIN' INITIAL APPROACH TO-POWER (B-SERIES)~

INTERIM REPORT 42

-Report For Period Ending February 14, 1987 1

e 4

9 l

t i

4 4

4 4

4 h

w-e-e-+-me.

.rw ir. - e - t r,rn,w

, wnm--

,,y w

,. p'

-+

i-

~

Interim _ Report 21 covering the 90-day period from Augst 23,.1981, to NovemberL22, 1981, reported the completion of the majority of tests at 100% of plant load. Significant power levels or appropriate plant conditions required for remaining tests have not been achieved since_-then.

During the period covered by this report, the reactor was shutdown on May 31, 1986, to perform Environmental Qualification modifications.

No -further initial approach to power tests were performed during the 90-day period ending February 14, 1987.

Further ' interim reports will report the results of any startup tests which will _ remain in the "open" status.

fI

...e-Q Public Service-

= a %,.

c.

P.O. Box 840 Denver, CO 80201- 0840 March 10, 1987 R.O. WILLIAMS, JR.

Fort St. Vrain vicE PRESIDENT NUCLEAR OPERATIONS Unit No. 1 P-87093 Regional Administrator Region IV U. S. Nuclear Regulatory Commission f

i g l 7[gg7 h, il 611 Ryan Plaza Drive, Suite 1000

" P i'

-l ;!

Arlington, Texas 76011 d'

i.19 Attention: Mr. J. E. Gagliardo, Chief Reactor Projects Branch Docket No. 50-267

SUBJECT:

F0P.TY-SECOND STARTUP REPORT FOR FORT ST. VRAIN NUCLEAR GENERATING STATION, UNIT NO. 1

REFERENCE:

Facility Operating License Number DPR-34

Dear Mr. Gagliardo:

Enclosed, please find a copy of the forty-second Startup Report for Fort St. Vrain Nuclear Generating Station, Unit No. 1.

This report covers the period from November 17, 1987, through February 14, 1987, and is submitted in fulfillment of the requirements of Section 7.5.la of the Fort St. Vrain Technical Specifications.

If you have any questions, please contact Mr. M. H. Holmes at (303) 480-6960.

Sincerely, l

R. O. Williams, Jr.

Vice President, Nuclear Operations Enclosure i

cc: Director, I & E Director, MIPC ROW /djm 3\\

\\\\

(-387