Text

c;  :,

~

.c -

THE FORT ST. VRAIN INITIAL APPROACH TO POWER (B-SERIES)

INTERIM REPORT 33 Report For Period Ending November 22, 1984 ease 40

^-

y ,

4 Interim Report 21 covering the 90-day period from August 23, 1981, to November 22, 1981, reported the completion of the majority of tests at 100% of plant load. Significant power levels or appropriate plant conditions required for remaining tests have not been achieved since then, however. At present, the reactor is shutdown for an investigation of six control rod pairs that failed to automatically insert upon actuation of the Plant Protective System Scram Logic. No further initial approach to power tests were performed during the 90-day period ending November 22, 1984. I Future interim reports will report the results of any startup tests which will remain in the "open" status.

1 l

l l

l

publie 9?rvice Company Cf Odesab V 16805 WCR 19 1/2, Platteville, Colorado 80651 December 12, 1984 Fort St. Vrain Unit #1 P-84524 3@MOWE A Mr. Robert Martin, Regional Administrator h DEC l 81984 Nuclear Regulatory Commission, Region IV 611 Ryan Plaza Drive, Suite 1000 .i //

Arlington, TX 76011 ,

ATTN: Mr. E. H. Johnson

SUBJECT:

Facility Operating License No. DPR-34 Docket No. 50-267

Dear Mr. Martin:

Enclosed, please find a copy of the thirty-third Startup Report for Fort St. Vrain Nuclear Generating Station, Unit No. 1. This report covers the period from August 23, 1984, through November 22, 1984, and is submitted in fulfillment of the requirements of Section 7.5.la of the Fort St. Vrain Technical Specifications.

Sincerely, u/4s/A J. W. Gahm Manager, Nuclear Production Enclosure cc: Director, I & E l Director, MIPC JWG/djm )

l l

Hoof %

ggogoonwaL '

T*o RIV