r THE FORT ST. VRAIN INITIAL APPROACH TO POWER (B-SERIES)
INTERIM REPORT 47 Report For Period Ending May 10, 1988
>h f
h![ bOh!: $$bbo 67
< l, p
o Interim. Report 21 covering the 90-day period from August 23,
~1981, to November 22, 1981,. reported the completion of the majority of tests at 100% of -plant load.
Significant power levels or
~ appropriate. plant conditions required for remaining tests have not been achieved since'then. During the period covered by this report, the reactor did not operate above 80% power.
The reactor is currently limited to 82% power by the Nuclear Regulatory Commission.
No further initial approach to power tests were performed during the 90-day period ending May 10, 1988.
Further. interim reports will report the results of any startup tests which will remain in the "open" status.
1 8
k
D 3
4 h Public Service ~
- =r/;c.....
16805 WCR 19 1/2, Platteville, Colorado 80651 July 15,1988 Fort St. Vrain Unit No. 1 P-88272 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.
20555 Docket No. 50-267
SUBJECT:
STARTUP REPORT #47 FOR FORT ST. VRAIN NUCLEAR GENERATING STATION, UNIT N0. 1
REFERENCE:
Facility Operating License Number DPR-34
Dear Sirs:
Attached, please find a copy of the forty-seventh Startup Report for Fort St. Vrain Nuclear Generating Station, Unit No. 1.
This report covers the period from February 10, 1988, through May 10, 1988.
This report is being submitted in fulfillment of the requirements of Section 7.5.la of the Fort St. Vrain Technical Specifications.
If you have any questions, please contact Mr. M. H. Holmes at (303) 480-6960.
nc ely s
C. H. Fuller Manager, Nuclear Production Attachment cc: Regional Administrator, Region IV ATTN: Mr. T. F. Westerman, Chief Project Section B Mr. Robert Farrell Senior Resident Inspector, FSV CHF:djm i \\
.