r THE FORT ST. VRAIN INITIAL APPROACH TO POWERTESTS(B-SERIES) j 1
f INTERIM REPORT 30 Report for Period Ending February 22, 1984 d
i L
g O h f0 000 R
A
Interim Report 21 covering the 90-day period from August 23, 1981 to November 22, 1981, reported the completion of the majority of
- tests at 100% of plant load.
.A major modification outage was completed in April,1982, but significant power levels or appropriate plant conditions required for remaining tests have not been achieved.
At present, the plant is in a scheduled shutdown period for refueling and-routine corrective and preventative maintenance. No further initial approach to power tests were performed during the 90-day period ending February 22, 1984.
Future interim reports will report the results of any startup tests which'still remain in the "open" status.
i, s
a L.
public Service Company
& Cderado
[
~
16805 WCR 19 1/2, Platteville, Colorado 80651 March 21, 1984 Fort St. Vrain Unit #1 P-84087 Mr. John T. Collins, Regional Administrator Region IV Nuclear Regulatory Commission 611 Ryan Plaza Drive Suite 1000 Arlington, TX 76011
REFERENCE:
Facility' Operating License No. DPR-34 Docket No. 50-267
Dear Mr. Collins:
Enclosed please find a revised copy of the thirtieth Startup Report for Fort St. Vrain Nuclear Generating Station, Unit No.
1.
This report covers the period from November 23, 1983, through February 22, 1984, and is submitted in fulfillment of the requirements of Section 7.5.la of the Fort St. Vrain Technical Specifications.
Very truly yours, SW Don Warembourg Manager, Nuclear roduction DW/djm Enclosure cc: Director I & E Director, MIPC