THE FORT ST. VRAIN INITIAL APPROACH TO POWER (B-SERIES)
INTERIM REPORT 46 Report For Period Ending February 9, 1988 8803210043 890209 PDR ADOCK 05000267 g[,
R DCD e'
I
\\
Interim Report 21 covering the 90-day period from August 23, 1981, to November 22, 1981, reported the completion of the majority of tests at 100% of plant load.
Significant power levels or appropriate plant conditions required for remaining tests have not been achieved since then. During the period covered by this,eport, the reactor did not operate above 80% power.
The reactor is currently limited to 82% power by the Nuclear Regulatory Crimmission.
No further initial approach to power test, were performed during the 90-day period ending February 9,1988.
Further interim reports will report the rasults of any startup tests which will remain in the "open" status, i
I i
e l
I THE FORT ST. VRAIN INITIAL APPROACH TO POWER (B-SERIES)
INTERIM REPORT 46 Report for Period Ending February 9,1988
o Interim Report 21 covering the 90-day period from August 23, 1981, to November 22, 1981, reported the completion of the majority of tests at 100*4 of :lant load.
Significi.e power levels or appropriate plant conditions required for remaining tests hava not been achieved since then. During the period covered by this report, the reactor did not operate above 80% power.
The reactor is currently limited to 82% power by the Nuclear Regulatory Come.ission.
No further initial approach to power tests were performed during the 90-day period ending February 9, 1988.
Further interim reports will report the results of any startup tests which will remain in the "open" status.
O eubiic service ~
=::=...
16805 WCR 19 1/2, Platteville, Cclorado 80651 March 9, 1988 Fort St. Vrain Unit No. 1 P-88089 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.
20555 Docket No. 50-267
SUBJECT:
STARTUP REPORT #46 FOR FORT ST. VRAIN NUCLEAR GENERATING STATION, UNIT NO 1
REFERENCE:
Facility Operating License Number DPR-34
Dear Sirs:
Enclosed, please find a copy of the forty-sixth Startup Report for Fort St. Vrain Nuclear Generating Station, Unit No. 1.
This report covers the period from Nove,tber 12, 1987, through February 9,1988.
This report is being submitted in fulfillment of the requirements of Section 7.5.la of the Fort St. Vrain Technical Specifications.
If you have any questions, please contact Mr. M. H. Holmes at (303) 480-6960.
Sincerely, j
AT (k C. H. Fuller Manager, Nuclear Production Enclosure cc: Regional Administrator, Region IV I
ATTN:
Mr. T. F. Westerman, Chief Project Section B fgh Mr. Robert Farrell Senior Resident Inspector, USNRC 3
Fort St. Vrain CHF:djm l