Interim Deficiency Rept,Item 61 Re Inadequate Size of Battery Cables.Initially Reported on 830312.All Design Change Notices Issued & Work in Progress to Change Cables. Next Rept to Be Submitted When Further Info Available
ML20080C182
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/29/1983
From: Wells D
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, EF2-64309, NUDOCS 8308190251
Download: ML20080C182 (1)


Text

m D

,,onald

-, _ A..-Wells i- 7 (3t h 237 %$7 i j

Ecison 2M7E==

July 29, 1983 EF2-64309 Mr. James G. Keppler, Regional Administrator Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Subject:

Interim Report of 10CFR50.55(e)

Item on Battery Cables (#61)

Dear Mr. Keppler:

This interim report involving battery cables has been prepared to pro-vide the current status of this problem.

This item was originally reported to Mr. J. Neisler of NRC Region III by Detroit Edison's Mr. J. D. Ryan, Quality Assurance Engineer -

Project Quality Assurance on March 12, 1983.

During the course of a review of the D.C. system for battery load curve data, it was discovered that some cables were inadequately sized. The circuits were primarily associated with motor operated valves and switch gear, where long lengths of cable were used.

Approximately thirty-five (35) circuits were affected.

All Design Change Notices (DCNs) necessary to make the cable changes have been issued to the field, and work is in progress.

Another report on this item, either interim or final, will be sent when further information is available. If you have questions concern-ing this matter, please contact Mr. G. M. Trahey, Assistant Director -

Project Quality Assurance.

Very truly yours, V

DAW /WEM/pn ec: Mr. Richard DeYoung, Director Office of Inspection and Enforcement U.S.. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. Bruce Little, Senior Resident Inspector p U.S. Nuclear Regulatory Commission 6450 North Dixie Highway Newport, Michigan 48166 r[V ' Fg 8308190251 830729 AUG 151N PDR ADOCK 05000341 S PDR