ML20080P746

From kanterella
Revision as of 11:29, 21 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Interim Deficiency Rept DER 83-42 Re Thermowells in Rcs. Initially Reported on 830729.Final Rept Extension Requested Due to Extensive Investigation & Evaluation.Final Rept Will Be Submitted by 831201
ML20080P746
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 09/21/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-27852-BSK, DER-83-42, NUDOCS 8310070352
Download: ML20080P746 (2)


Text

-

E901@

%c Arizona Public Service Cgany P O. BOX 21666 e PHOENIX. ARIZbh r Septembiog21,, ,1983 ANPP-27852-BSK/RQT U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office' Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. D. M. Sternberg, Chief Reactor Projects Branch 1

Subject:

Time Extension for Report - DER 83-42 A 50.55(e) Potentially Reportable Condition Relating To Thermowells In The Reactor Coolant System File: 83-019-026; D.4.33.2

Reference:

(A) Telephone Conversation between P. Johnson and J. Roedel on July 29, 1983 (B) ANPP-27398, dated July 25, 1983 (Interim Report)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B).

-At that time, it was estimated that a Final Report would be available by September 21, 1983.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by December 1,1983, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours,

~

. M n E. E. Van Brunt, Jr.

APS Vice President, Nuclear Projects Management ANPP Project Director EEVBJr/RQT:sn ec: See Attached Page 2 B310070352 830921 PDR ADOCK 05000528PDR l g

1 1 U

) J;

\

4. .. g

cc: ' Richard DeYoung, Director Office of Inspection.and Enforcement '

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G.. Woods, Jr.

G. C. Andognini J. A. Roedel D. B. Fasnacht A. C. Rogers

'B. S. Kaplan W. E. Ide J. Vorees

'J. R. Bynum

, D. D. Green /P. P. Klute i

A. C. Gehr W. J. Stubblefield

. W. G. Bingham R. L. Pa tterson .

R. W. Welcher R. M. Grant D. R. Hawkinson L; E. Vorderbrueggen G. A.'Fiorelli S. R. Frost j J. Self D. Canady l

Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339 J

i

,