ML20081G233
From kanterella
ML20081G233 | |
Person / Time | |
---|---|
Site: | Waterford |
Issue date: | 03/21/1995 |
From: | ENTERGY OPERATIONS, INC. |
To: | |
Shared Package | |
ML20081G227 | List: |
References | |
SR-95-001-00, SR-95-1, NUDOCS 9503230060 | |
Download: ML20081G233 (20) | |
Similar Documents at Waterford | |
---|---|
Category:PRESERVICE & INSERVICE INSPECTION & TEST REPTS
MONTHYEARML20148Q2571997-07-0101 July 1997
[Table view]Rev 0 to Entergy Operations Waterford-3 Steam Electric Station ISI Plan Second 10-Yr Interval ML20081G2331995-03-21021 March 1995 Steam Generator Eddy Current Exam (6th Refueling), 12 Month Special Rept ML20070H3591994-07-14014 July 1994 Sixth Refueling ISI Summary Rept ML20128F6071993-02-0404 February 1993 Ses Unit 3,Inservice Insp Summary Rept,First Interval,Third Period,Fifth Refueling,Oct-Dec 1992 ML20082N3901991-09-0303 September 1991 Rev 7,Change 1 of Inservice Testing Plan Re Pumps & Valves ML20077R6961991-08-0707 August 1991 Fourth Refueling Inservice Insp Summary Rept ML20059G5751990-09-0606 September 1990 Rev 4 to 10-Yr Inservice Insp Program ML20006E5811990-02-0909 February 1990 Third Refueling Inservice Insp Summary Rept for Waterford Steam Electric Station Unit 3. ML20151Z1251988-08-24024 August 1988 Inservice Insp Summary Rept,First Interval,First Period, Second Refueling,Apr-May 1988 ML20209G5231987-04-27027 April 1987 Inservice Insp Summary Rept:First Interval,First Outage ML20107F9011984-10-30030 October 1984 Part 1 of Vol B to Preservice Insp Rept, Class 1 Data: Zones 1-8 ML20107G0411984-10-30030 October 1984 Vol F to Preservice Insp Rept, Data Ref - Other Sources Errata Conclusions/Recommendations ML20107G0361984-10-30030 October 1984 Vol E to Preservice Insp Rept, Certifications ML20107G0301984-10-30030 October 1984 Vol D to Preservice Insp Rept, Procedures ML20107G0241984-10-30030 October 1984 Vol C to Preservice Insp Rept, Program Plan ML20107F8941984-10-30030 October 1984 Parts 1 & 2 of Vol a to Preservice Insp Rept, NIS-1 Introduction Results ML20107G0141984-10-30030 October 1984 Part 9 of Vol B to Preservice Insp Rept, Class 2 Data: Zones 53-65 ML20107F9091984-10-30030 October 1984 Part 2 of Vol B to Preservice Insp Rept, Class 1 Data:Zones 9-12 ML20107F9221984-10-30030 October 1984 Part 3 of Vol B to Preservice Insp Report, Class 1 Data: Zones 13-16 ML20107F9471984-10-30030 October 1984 Part 4 of Vol B to Preservice Insp Rept, Class 1 Data: Zones 17-18 ML20107F9671984-10-30030 October 1984 Part 5 of Vol B to Preservice Insp Rept, Class 1 Data: Zones 19-21 ML20107F9701984-10-30030 October 1984 Part 6 of Vol B to Preservice Insp Rept, Class 1 Data: Zones 22-40 ML20107F9871984-10-30030 October 1984 Part 7 of Vol B to Preservice Insp Rept, Class 2 Data: Zones 41-44 ML20107G0111984-10-30030 October 1984 Part 8 of Vol B to Preservice Insp Rept, Class 2 Data: Zones 45-52 ML20088A5661975-07-29029 July 1975 Shop Preservice Insp Program,Vol 5,Exam Data ML20088A5581975-07-29029 July 1975 Shop Preservice Insp Program,Vol 4,Exam Data ML20088A5531975-07-29029 July 1975 Shop Preservice Insp Program,Vol 3,Rept 1997-07-01 Category:TEXT-SAFETY REPORT MONTHYEARML20217F2891999-10-13013 October 1999
[Table view]Drill 99-08 Emergency Preparedness Exercise on 991013 ML20217G7211999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Waterford 3 Ses. with ML20211Q2141999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Waterord 3 Ses.With ML20210Q6361999-07-31031 July 1999 Corrected Monthly Operating Rept for July 1999 for Waterford 3 ML20210S0581999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Waterford 3.With ML20210D8951999-07-23023 July 1999 Safety Evaluation Accepting First 10-yr Interval Inservice Insp Plan Requests for Relief ISI-018 - ISI-020 ML20209H3781999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Waterford 3 Ses. with ML20195J8951999-06-17017 June 1999 Safety Evaluation Granting Relief for Listed ISI Parts for Current Interval,Per 10CFR50.55a(g)(5)(iii) ML20207E8631999-06-0303 June 1999 Safety Evaluation Accepting Licensee 990114 Submittal of one-time Request for Relief from ASME B&PV Code IST Requirements for Pressure Safety Valves at Plant,Unit 3 ML20195K3391999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Waterford 3 Ses.With ML20195C3041999-05-28028 May 1999 Annual Rept on Abb CE ECCS Performance Evaluation Models ML20206S7401999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Waterford 3.With ML20205T2621999-04-22022 April 1999 LER 99-S02-00:on 990216,contract Employee Inappropriately Granted Unescorted Access to Plant Protected Area.Caused by Personnel Error.Security Personnel Performed Review of Work & Work Area That Individual Was Involved with ML20205N9671999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Waterford 3 Ses.With ML20205E8531999-03-30030 March 1999 Corrected Pages COLR 3/4 1-4 & COLR 3/4 2-6 to Rev 1, Cycle 10, Colr ML20205A6331999-03-25025 March 1999 SER Accepting Request to Use Mechanical Nozzle Seal Assemblies as an Alternative Repair Method,Per 10CFR50.55a(a)(3)(i) for Reactor Coolant Sys Applications at Plant,Unit 3 ML20204H1401999-03-23023 March 1999 Rev 1 to Engineering Rept C-NOME-ER-0120, Design Evaluation of Various Applications at Waterford Unit 3 ML20204H1231999-03-22022 March 1999 Rev 1 to Design Rept C-PENG-DR-006, Addendum to Cenc Rept 1444 Analytical Rept for Waterford Unit 3 Piping ML20204H2451999-03-22022 March 1999 Rev 2 to C-NOME-SP-0067, Design Specification for Mechanical Nozzle Seal Assembly (Mnsa) Waterford Unit 3 ML20204F0791999-03-17017 March 1999 Rev 1 to Waterford 3 COLR for Cycle 10 ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results ML20207F3491999-03-0505 March 1999 LER 99-S01-00:on 990203,contraband Was Discovered in Plant Protected Area.Bottle Was Determined to Have Been There Since Original Plant Construction.Bottle Was Removed & Security Personnel Performed Search of Area.With ML20204B5141999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Waterford 3.With ML20203H8591999-02-17017 February 1999 Safety Evaluation Accepting Licensee Second Ten Year ISI Program & Associated Relief Requests for Plant,Unit 3 ML20199H6261999-01-21021 January 1999 Safety Evaluation Accepting Classification of Instrument Air Tubing & Components for Safety Related Valve Top Works.Staff Recommends That EOI Revise Licensing Basis to Permit Incorporation of Change ML20199C9101998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Waterford 3.With ML20196F4911998-12-0101 December 1998 SER Accepting Request for Relief ISI2-09 for Waterford Steam Electric Station,Unit 3 & Arkansas Nuclear One,Unit 2 ML20206N4131998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Waterford 3.With ML20195C4841998-11-0606 November 1998 SER Accepting QA Program Change to Consolidate Four Existing QA Programs for Arkansas Nuclear One,Grand Gulf Nuclear Station,River Bend Station & Waterford 3 Steam Electric Station Into Single QA Program ML20195E5161998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Waterford 3.With ML20155C1351998-10-26026 October 1998 Rev B to Entergy QA Program Manual ML20154K0801998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Waterford 3 Ses. with ML20151W8331998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Waterford,Unit 3. with ML20237B6831998-08-17017 August 1998 LER 98-S01-00:on 980723,discovered That Waterford 3 Physical Security Plan,Safeguards Document Was Not Under Positive Control of Authorized Person at All Times.Caused by Human Error/Inappropriate Action.Counseled Employee Involved ML20237C5661998-08-17017 August 1998 Safety Evaluation Accepting Licensee Request for Exemption from Section Iii.O of Appendix R to 10CFR50 ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML20237B5261998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Waterford 3 ML20236S9031998-07-22022 July 1998 SER Accepting Rev 19 to Quality Assurance Program for Waterford Steam Electric Station,Unit 3 ML20198H3911998-07-14014 July 1998 Non-proprietary Rev 5 to HI-961586, Thermal-Hydraulic Analysis of Waterford-3 Spent Fuel Pool ML20236N4181998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Waterford,Unit 3 ML20248E7781998-06-0101 June 1998 Annual Rept on Abb CE ECCS Performance Evaluation Models ML20249A4711998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Waterford 3 Ses ML20196A4051998-05-31031 May 1998 Rept of Facility Changes,Tests & Experiments,Per 10CFR50.59 for 970601-980531. with ML20198H4681998-05-20020 May 1998 Non-proprietary Rev 1 to HI-981942, Independent Review of Waterford Unit 3 Spent Fuel Pool Cfd Model ML20247A3891998-05-0101 May 1998 SG Eddy Current Examination (8th Refueling Outage) ML20247F6761998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Waterford,Unit 3.W/ ML20217M8951998-04-30030 April 1998 QA Program Manual ML20217P8281998-04-0707 April 1998 Safety Evaluation Accepting Relief Authorization for Alternative to Requirements of ASME Section Xi,Subarticle IWA-5250 Bolting Exam for Plants,Per 10CFR50.55a(a)(3)(i) ML20216B1751998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Waterford 3 Ses ML20217M1411998-03-0303 March 1998 Rev 2 of Waterford 3 Cycle 9 Colr 1999-09-30 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20081G233&oldid=2752466"