ML20081G224

From kanterella
Jump to navigation Jump to search
Forwards 12 Month Special Rept SR-95-001-00, SG Eddy Current Exam (6th Refueling), Per 10CFR50.36(c)(2) & TS 4.4.4.5.b & 6.9.2.Inservice EC Exam of Facility SG Tubing Completed by Conam Nuclear,Inc on 940328
ML20081G224
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/21/1995
From: Starkey R
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20081G227 List:
References
W3F1-95-0028, W3F1-95-28, NUDOCS 9503230052
Download: ML20081G224 (1)


Text

.. - - .~.

6 I  ;

{gg yF- Entergy Operatiom, ins.

PO Box B

(.'

  • ggMQQ$ KMona.LA 70066 l l Te' 504-739-6650  ;

I l

1 i W3F1-95-0028 l A4.05 [

PR March 21, 1995  :

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 i

Subject:

Waterford 3 SES l Docket No. 50-382  ;

License No. NPF-38 Reporting of Special Report i Gentlemen:

i Attached is Special Report Number SR-95-001-00, " Steam Generator Eddy ,

Current Examination for 6th Refueling," for Waterford Steam Electric Station Unit 3. This Special Report is submitted per 10CFR50.36(c)(2) and Technical Specifications 4.4.4.5.b and 6.9.2.

Very truly yours,

)

R.S. Starkey Acting General Manager Plant Operations RSS/DFL/tjs Attachment cc: L.J. Callan (NRC Region IV), C.P. Patel (NRC-NRR), l G.L. Florreich, J.T. Wheelock (INP0 b cords Center),

R.B. McGehee, N.S. Reynolds. Administiator - LRPD, NRC Resident Inspectors Office (WMSB4101) g 230007 11- ,

h323OO52950321

  • L Q ADOCK 05000382 PDR

._-