ML20083G291

From kanterella
Revision as of 00:37, 19 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Repts for Dec 1983
ML20083G291
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 12/31/1983
From: Dietz C, Harrison F
CAROLINA POWER & LIGHT CO.
To: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
BSEP-84-0025, BSEP-84-25, NUDOCS 8401110233
Download: ML20083G291 (10)


Text

=

APPENDIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0325 UNIT BRUNSWICK UNIT 1 DATE 01/04/84 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 DECEMBER 1983 I

DAY. AVG. DAILY POWER LEVEL DAY AVG.' DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 753 17 773

'2 771 18 ~748 3 766 19 782 4 769 20 783 5 764 21 700 6 764 22 257

'7 768 23 -11 8 '770 24 -10 9 744 25 33 10 773 26 584

, 11 766 27 742 12 767 28 695

, 13 768 29 783 14 769 30 794 15 766 31 791 16 769 i

8401110233 831231 PDR ADOCK 05000314 R pop 9

1.16 - 8 i

._,-,_2.,. ___ - . - _ . . _ . . _ . _ _ _ . - _ . _ . _ _ . . _ _ _ - . - - . _ _ . _ - ,_._ .

. . . . . . - - . _ - - . . - ~ . . . . . . - .

OPERATING DATA REPORT DOCKET NO. 050-0325 DATE 01/04/84 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 OPERATING STATUS

1. UNIT NAME: BRUNSWICK UNIT 1 i NOTES I
2. REPORTING PERIOD: DECEMBER 83 I i
3. LICENSED THERMAL POWER (MWT): 2436 I I
4. NAMEPLATE RATING (GROSS MWE): 867.0 I l
5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I i
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 1 1
7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 -------------------------------
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 744.00 8760.00 59521.00
12. NUMBER OF HOURS REACTOR CRITICAL 675.06 2509.61 36397.98
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 1647.10
14. HOURS GENERATOR ON LINE 661.72 2118.50 34088.53 15.' UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 1532756.53 4529036.53 68425055.39
17. GROSS ELEC. ENERGY GEN. (MWH) 513353.00 1484863.00 22547051.00
10. NET ELEC. ENERGY GENERATED (MWH) 498486.00 1388721.00 21613840.00
19. UNIT SERVICE FACTOR 88.94 24.18 57.27
20. UNIT AVAILABILITY FACTOR 88.94 b4.18 57.27
21. UNIT CAP. FACTOR (USING MDC NET) 84.81 20.07 45.97
22. UNIT CAP. FACTOR (USING DER NET) 81.61 19.31 44.23
23. UNIT FORCED OUTAGE RATE 11.06 6.15 23.12
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

4

~ 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICITY ________

COMMERCIAL OPERATION ________

1.16 - 9

APPENDIX DOCKET NO.: 050-325 UNIT: Brunswick No. 1 DATE: December 1983 COMPLETED BY: Frances Harrison OPERATIONS

SUMMARY

BRUNSWICK UNIT NO. 1 Brunswick Unit No. 1 operated at an 88.94% availability factor for the month of December with an 84.81% capacity factor. There was one off-line outage and one power reduction. Details are in Appendix D, The Unit Shutdowns and Power Reduction Log.

There are 656 BWR and 160 PWR spent fuel bundles in the Brunswick No. 1 fuel pool.

4 W

N n- e .. , , , - , _ - , , ,

y .-, ..m._ , , . , . , , ,, , , . . , , , , . . , , , , ,_-_ ,_,y,,,,-,.r,c

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO- 050-0325 UNIT NAME Brunswick I DATE January 1984 REPORT MGNT11 December 1983 COMPLETED BY Frances Harrison TELEPIIONE (919)457-9521

. q c es $ en 5 E No' Date 1y '

3.a

!;; 3b g3m Li' $#

Event 5,3 gu b*3' C'"S* A C""'C8i

Action to oO m giy Repost # ro u g Prevent Recurrence d .

83032 831222 F 82L3 A 3 NA Rx scram-EHC malfunction caused Rx pressure increase.

Repaired EHC pressure control system by replacing defective card in EHC

, logic cabinet l

I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructicas S: Scheduled A Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C Refueling 3 Automatic Scram. . Event Report (LER) File (NUPEG.

D Regulatory Restriction 0161)

E-Operator Training & Ucense Examination l-Continuatlons i -

F-Administrative 5-Load Reductions 5 G-Operational Error (Explain) (,-O tl.e r Exhibit I Same Source 08/77) li-Other (Explain)

L --

UNIT SHUTDOWNS AND POWER REDUCTIONS IX)CKET NO. 050-0325 UNITNAME Brunswick I DATE January 1984 COMPLETED BY Frances Harrison REPORTMONTil December 1983 TELEPHONE (919) 457-952I

- e.

u E E No.

3g 3 yY5 Licensee Eg j", Cause & Curreceive Date h Eg  % 2s5 Event p Action to H

f5 E j g5 g Repoet # mO g{

  • Prevent Recurrence d

e 83034 831228 S 00 B 5 NA ZZ ZZZZZZ Reduced power for rod improvement

.e t

I l

l l

l I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A Equipment Failure (Explain) l-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

D-Regulatory Restriction . Event ReporI(LER) File (NUREG-E-Operalor Training & License Examination 4-Continuations - 0161)

F-Administrative 5-Load Reductions 5 G-Operational Error (Explain) 6-Other (4/77) li-Other(Explain) Exhibit !-Same Source

[ .

APPENDIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0324 UNIT BRUNSWICK UNIT 2 DATE 01/04/84 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521

-DECEMBER 1983 DAY -AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET). (MWE-NET) i 1 -9 17 -7

2. -8 18 -8 3 -9 19 -7

-9 . :20 -8 14

'5 -8 21 -8 6 -8 22 -8 7- -9 23 -10 8' -9 24 -10

9. -9 25 -8

~ 10 -9 26 -8 11 -8 27 -7 zi2 -8 28- -7'

-13 -8 29 -8.

-14 -9' 30 -9

'15 - -8 31- -8 16 1.16 -'8

OPERATING DATA REPORT DOCKET NO. 050-0324 DATE 01/04/84 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 OPERATING STATUS

1. UNIT NAME: BRUNSWICK UNIT 2 i NOTES I
2. REPORTING PERIOD: DECEMBER 83 f 1 I
3. LICENSED THERMAL POWER (MWT): 2436 I I
4. NAMEPLATE RATING (GROSS MWE): 867.0 I DESIGN ELECTRICAL RATING (NET MWE): 821.0 l l 5.

I

6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 1
7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 744.00 8760.00 71545.00
12. NUMBER OF HOURS REACTOR CRITICAL .00 5951.30 44727.42
13. REACTOR RESERVE SHUTDOWN HRS .

.00 .00 .00

14. HOURS GENERATOR ON LINE .00 5634.73 41785.47
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) .00 12279737.66 78576721.02
17. GROSS ELEC. ENERGY GEN. (MWH) .00 4093006.00 26109698.00
18. NET ELEC. ENERGY GENERATED (MWH) -6080.00 3935892.00 25027818.00
19. UNIT SERVICE FACTOR .00 64.32 58.40
20. UNIT AVAILABILITY FACTOR .00 64.32 58.40
21. UNIT CAP. FACTOR (USING MDC NET) -1.03 56.87 44.28
22. UNIT CAP. FACTOR (USING DER NET) -1.00 54.73 42.61
23. UNIT FORCED OUTAGE RATE- .00 10.18 15.97
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND [CoATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 12/22/83
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICITY -------- --------

COMMERCIAL OPERATION 1.16 - 9 _ _ _ _ _ _ _ _ _ _ _ _

APPENDIX DOCKET NO.: 050-324 UNIT: Brunswick No. 2 DATE: December 1983 COMPLETED BY: Frances Harrison OPERATIONS

SUMMARY

. BRUNSWICK UNIT NO. 2 l Brunswick Unit No. 2 was shut down for a planned Intergranular Stress Corrosion Cracking outage.

There are 424 BWR and 144 PWR spent fuel bundles in the Brunswick No. 2 fuel pool.

p l.

r 8

UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0324 UNIT NAME Brunswick II DATE January 1984 I REPORT MONT11 December 1983 COMPLETED BY Frances Harrison l TELEPHONE (9I9) 457-9521 i

1 I .

c ri 4 e.o S E l

l No. Date E.

j_y

-o y 7y3

.c :3 cc cen5 e Event j'T .,

h o Cause a Corrective Action to ju ei

$3 5 j5y Repori # ,#0 Prevent Recurrence 5

83-105 831102 S 693.3 *H I NA XX ZZZZZZ Intergranular Stress Corrosion l . Cracking Outage er I

, *Intergranular StressCorgosionCrackingOutage F: Forced Reason: Method: Exhibit G last:uctions S: Scheduled A Ecinipment Failure (Explain) l-Manual for Preparation of Data B4taintenance of Test 2 Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. . Event Report (LER) File (NUREG-D Regidatory Restriction 0161) 4-Continuatlons -

1 E-Operator Training & Ucense Examination F Administrative 5-Load Reductions 5 G-Operational Error (Explain) 6-Other Exhib3 Same Source 08/77) Il-Other (Explain) -

.w=mwo - * ~-=

_q ..

W_ _("%

l e

CNLL Carolina Power & Light Company Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429 January 4, 1984 FILE: B09-13510C SERIAL: BSEP/84-0025 Mr. R. C. DeYoung, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 LICENSE NOS. DPR-71 AND DPR-62 DOCKET NOS. 50-325 AND 50-324 MONTHLY OPERATING REPORT

Dear Mr. DeYoung:

In accordance with Technical Specification 6.9.1.6 for the Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Carolina Power & Light Company herewith submits the report of operating statistics and shutdown experience for the month of December 1982.,

Very truly yours, C. R. Dietz, Ceneral Manager Brunswick Steam Electric Plant FH/j sa/LETJA Enclosures cc: Ms. J. C. Baker

_ Mr. S. W. McDowell' Mr. J. P. O'Reilly Mr. S. L. Rosen v

g\

. _ . . .