ML20086E906

From kanterella
Revision as of 14:43, 15 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rev 9 to UFSAR & Rev 8 Fire Hazards Analysis Rept
ML20086E906
Person / Time
Site: Oyster Creek
Issue date: 05/19/1995
From: J. J. Barton
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20086E908 List:
References
C321-95-2176, NUDOCS 9507120331
Download: ML20086E906 (2)


Text

. .

. . . _ _ . . _ ~ . . . . . . .

.. s s Vf 3 i

1 i

i 2:

RtfNuclear GPU Nuclear Corporation .

= r 388 Forked River, New Jersey 08731-0388 609 971-4000 Writer's Direct Dia! Number:

{

May 19,1995  ;

C321-95-2176 g i i l

U.S. Nuclear Regulatory Commission =

3 Attn: Document Control Desk ' 5 Washington, DC. 20555  !

8

Dear Sirs:

E

Subject:

Oyster Creek Nuclear Generating Station Docket No. 50-219 Updated Final Safety Analysis Report, ku , (UFSAR)

J i

Fire Hazards Analysis Report, Rev. 8 (FHAR) J 7

4 Pursuant to 10CFR50.71(e), GPUN is forwarding one signed original and ten copies of the 4

) Updated Final Safety Analysis Repon, Update 9. Update 9 reflects changes made to the ];

facility to procedures described in the UFSAR, safety evaluations supporting license d amendments, and analyses of new safety issues up through December 31,1994. -

q R

Additionally, the update reflects the removal of reference drawings which are controlled under the existing drawing control program. A safety evaluation concluded this will assure /jg the use of valid drawings with no impact on safety. j B

In addition, as pan of the annual SAR update process enclosed herewith is one (1) copy of Revision 8 to the Oyster Creek FHAR. The FHAR, Revision 8, reflects the methodology Q

=

used at Oyster Creek to meet 10CFR50, Appendix R. Revision of the document resulted j from changes to the facility, procedures, and new design information having been y incorporated since Revision 7, up through May 15,1995, as annotated by revision bars. g i

& =

9507120331 950519 ,8g,, g pcMhSSk ,

t a a

PDR ADOCK 05000219 r -

K PDR 1 GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation f

I

y -.

V w

Each replacement page includes a vertical line in the margin adjacent to the mvised text as well as a footer indicating Update 9,06/95. In addition, a list of effective pages has been provided which identifies the current revision number for each page of the Updated FSAR following page replacement.

I If you have any questions regarding this submittal, please contact Geraldine Ixvin at 609-971-4963.

Very %v yo s,

~

J (

Jc hn J. .arton ice President Oyster Creek JJB/gl cc: Administrator, Region I sworn to and s bscribed Senior NRC Resident Inspector before me this /f ay .

j fff[

Oyster Creek NRC Project Manager U 11 4

JUDITH M. CROWE Notary Public of New Jersey MyCommission Expires O// 0 5 /d 600 t

A J