ML20086H013

From kanterella
Revision as of 10:57, 15 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rev 11A & 11B to Pilgrim Nuclear Power Station Colr.
ML20086H013
Person / Time
Site: Pilgrim
Issue date: 07/13/1995
From: Boulette E
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20086H018 List:
References
BECO-LTR-#95-07, BECO-LTR-#95-7, NUDOCS 9507170375
Download: ML20086H013 (1)


Text

m e

. . i

-, -c

  1. t, l Sosforr Edisor Pilgren Nuclear Power staten Rocky Hill Road Plymouth. Massachusetts 02360 E. T. Boulette, PhD Senior Vice President - Nuclear July 13, 1995 BECo Ltr.#95 070 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Docket No. 50-293 License No. DPR-35 Core Operatina Limits Reports Revision 11A and 11B of the Core Operating Limits Report are provided for your infolmation. The re9 ort provides the cycle specific limits for operation of the Pilgrim Nuclear Power Station during Cycie
11. This information is being submitted in accordance with the requirements of PNPS Technical specifications 6.9.A.4.d.

i

. W j

. T. Boulette, PhD l ETB/nas/ Rap 95/COLR Attachment cc: Mr. R. Eaton, Project Manager  !

Division of Reactor Projects - 1/11 i Mail Stop: 14D1 l U. S. Nuclear Regulatory Commission i 1 White Flint North  ;

11555 Rockville Pike j Rockville, MD 20852 U.S. Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19406 g got i Senior Resident inspector Pilgrim Nuclear Power Station i\

9507170375 950713 PDR ADOCK 05000293 P PDR

_ . . _ _ _ _ _