ML20086H013
Jump to navigation
Jump to search
| ML20086H013 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 07/13/1995 |
| From: | Boulette E BOSTON EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20086H018 | List: |
| References | |
| BECO-LTR-#95-07, BECO-LTR-#95-7, NUDOCS 9507170375 | |
| Download: ML20086H013 (1) | |
Text
e m
i
-c
- t, Sosforr Edisor Pilgren Nuclear Power staten Rocky Hill Road Plymouth. Massachusetts 02360 E. T. Boulette, PhD Senior Vice President - Nuclear July 13, 1995 BECo Ltr.#95 070 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Docket No. 50-293 License No. DPR-35 Core Operatina Limits Reports Revision 11A and 11B of the Core Operating Limits Report are provided for your infolmation. The re9 ort provides the cycle specific limits for operation of the Pilgrim Nuclear Power Station during Cycie
- 11. This information is being submitted in accordance with the requirements of PNPS Technical specifications 6.9.A.4.d.
i W
j
. T. Boulette, PhD ETB/nas/ Rap 95/COLR Attachment cc:
Mr. R. Eaton, Project Manager Division of Reactor Projects - 1/11 Mail Stop: 14D1 U. S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike j
Rockville, MD 20852 U.S. Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19406 g
- got Senior Resident inspector Pilgrim Nuclear Power Station i\\
9507170375 950713 PDR ADOCK 05000293 P
_.. _ _ _ _ _