ML20069G958

From kanterella
Revision as of 00:45, 29 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Final Deficiency Rept Re Cracking of 3/4-inch Carbon Steel Pipe.Initially Reported on 820430.Manufacturer Installed Eddy Current Tester to Aid in QC of Pipes.Faulty Sections of Pipe Replaced
ML20069G958
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 09/24/1982
From: Wells D
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, EF2-59395, EF2-59395.55E, NUDOCS 8210190332
Download: ML20069G958 (3)


Text