ML20071C836

From kanterella
Revision as of 00:39, 27 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Repts for Dec 1982
ML20071C836
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 01/31/1983
From: Harrison F
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20071C829 List:
References
NUDOCS 8303080158
Download: ML20071C836 (10)


Text

, 0 APPENDIX DOCKET No.: 050-325 UNIT: Brunswick No. I s- DATE: January.1983 ~

COMPLETED BY: Francis Harrison OPERATIONS

SUMMARY

BRUNSWICK UNIT NO. 1 -

Brunswick Unit.No. I operated at 32.5% availability factor for the month of

  • December with a 20.1% capacity factor. The unit separated from the grid December 11, 1982, for a refueling / maintenance outage.

There are 476 BWP and 160 PWR spent fuel bundles in the Brunswick No. 1 fuel pool.

1 l

8303000158 830110 PDR ADOCK 06000324 R PDR

APPENDfX B .

AVERAGE DAILY POWER LEVEL DOCKET-NO. 050-0325

. UNIT BRUNSWICK UNIT 1 DATE 01/04/83 COMPLETED BY FRANCES HARRIS 01 TELEPHONE 919-457-9521 DECEMBEP B2 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) ,

1 523. 17 -6.

2 516. 18 -6.

3 501. 19 -6.

4 515. 20 -5.

5 511. 21 -5.

6 508. ,22 -5.

7 507. 23 -5.

3 8 506. 24 -5.

9 - 503. .

25. -5.

10 459. 26 -5.

11 -8. 27' -5.

12 -9. 28 . -6.

i 13 -8. 29 -5.

14 -6. 30 -6.

15 -5. 31 -6.

16 -5.

i i .

1.16 - 8 l

  • l l

OPERATING LATA REPORT

- DOCKET NO. 058-0325 DATE 01/04/83 COMPLETED EY FRANCES HARRI:Gis TELEPHONE 919-457-9521 GPERATING i.TATUS

1. UNIT NAME: BRUNSWICK UNIT 1 . I NOTES I
2. REPORTING PERIOD: DECEMBER.82 I -

I

3. LICENSED THERMAL POWER (MWT): 2436 I I
4. NAMEPLATE RATING (GROSS MWE): 867.0 I I
5. DESIGN ELECTRICAL RATING (NET MWE) : 821.0' I I
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.9 I I
7. MAX DEPENDABLE. CAPACITY (NET MWE): 790.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 744.0 8760.0 50761.0 l 12. NUMBER OF HOURS REACTOR WAS. CRITICAL 241.6 5623.2 33888.5
13. REACTOR RESERVE SHUTDOWN HOURS 0.0' O.0 1647.1
14. HOURS GENERATOR ON LINE .241.6 5430.3 31970..G

! 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 l 16. GROSS THERMAL ENERGY GENERATED (MWH) 376734.3 9478209.7 63896014.3 l 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 126519.0 3060980.0 21062188.0 l 18. NET ELECTRICI AL ENERGY GENERATED (MWH) 118192.0 2921622.0 20225119.0 l 19. UNIT SERVICE FACTOR 32.5 62.0 63.0 l 20. UNIT AVAILABILITY FACTOR 32.5 62.0 63.0

21. UNIT CAPACITY FACTOR (USING MDC NET) 20.1 42.2 50.4 l 22. UNIT CAPACITY FACTOR (USING DER NET) 19.3 40.6 48.5
23. UNIT FORCED OUTAGE RATE 0.0 33.0 24.1
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 4/30/83 l 26. UNITS IN TEST STATUS (PRIOR TO COMMERICI AL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY -------- --------

INITIAL ELECTRICITY -------- --------

COMMERICIAL OPERATION -------- --------

1.16 - 9

J. .

APPENDIZ DOCKET No.: 050-324 UNIT: Brunswick No. 2 DATE: January 1983 COMPLETED BY: Francis Harrison OPERATIONS

SUMMARY

BRUNSWICK UNIT NO. 2 Brunswick Unit No. 2 operated at 80.1% availability factor for the month of -

December with a 71.1% capacity factor. There were two power reductions and one off-line outage this month. ,

There are 424 BWR and 144 PWR spent fuel bundles in the Brunswick No. 2 fuel.

pool. ,

The corrected copy of the forced outage rate for November is attached.

l l-i e

l 4

, - - - -- -v e --, , , , ------r - re-a , -

-, - -- --n--n - '- - - - - - - + - n-- --,

wsennunwJwrvewn

DOCKET NO. 050-0324 DATE 12/21/92 .

COMPLETED BY FRANCES HARRISO

TELEPHONE 919-457-9521 OPERATING i.TATUS
1. uNIi N/"E: 9RUNSWiCh UNIT 2 I NOTES I
2. REPORTI'G PERIOD: NOVEMBER 82 I I
3. LICENSE 3 TEERNAL POWER (MWT)t 2436 I I 4 NAMEPLA E RATING (GROSS MWE): 867.6 I I
5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I I
6. MAX DE~ENDABLE CAPACITY (GROSS MWE): 915.0 I I T. MA): DE?iNDABLE CAPACITY i.NLT MWE): 79G.0 -------------------------------
9. .IF CHM.:ES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT,

?IVF RE SONS: '

9. P0ki$ _-VEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
  • G. REASONi 20R RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

1. HOURS IN REPORTING FERIOD 720.0 S016.0 62041.0
2. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 2975.8 '0142.7
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. H'0URS GENERATOR.ON LINE 0.0 2785.3 35554.6
15. UNIT REiERVE SHUTDOWN HOURS 0.0 0.0 0.0 5025312.2
16. GROSS THERHAL ENERGY . GENERATED (MWH) O.0 65022949.8
17. GROSS EL'ECTRICAL ENERGY GENERATED (MWH) 0.0 1589624.0 21583561.0
18. NET EL3CTRICI AL ENERGY GENERATED (MWH) -7387.0 1484411.0 20673813.0
19. UNIT SERVICE FACTOR 0.0 34.7 57.3
20. UNIT AVAILABILITY FACTOR 0.0 34.7 57.3
21. UNIT CAPACITY FACTOR (USING'MDC NET) -1.3 23.4 42.2
22. UNIT CAPACITY FACTOR (USING DER NET) -1.2 22.6 40.6
23. UNIT FORCED OUTAGE RATE 0.0 17.3 17.1
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURA' TION OF EACH):

4

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 12/ 2/82
26. UNITS IN TEST STATUS (PRIOR TO COMMERICI AL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY -------- --------

INITIAL ELECTRICITY -------- --------

COMMERICIAL OPERATION -------- --------

1.16 - 9 G

. 4PPENDIX B AVERAGE DAILY POWER LEVEL -

DOCKET NO. 050-0324 UNIT BRUNSWICr' UNIT 2 DATE 01/07/83 COMPLETED BY FRANCES HARRIS 01 TELEPHONE 919-457-9521 DECEMBER 92 9AY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL .

(MWE-NET) (MWE-NET) 1- -9. 1,7 795.

2 -9. 18 781.

3 -9. 19 592.

4 -11. 20 796.

5 156. 21 795.

A 364. 22 3?3.

7' 570. 23 -16.

A 652. 24 328.

9 - 682. . 25. ^630.

10 578. 26 729.

It 7?7. 27 6S9 12 799.

  • 28 724 .

1.< 794. 29 v va, 14 774. 3g 79g, I IK 792. 31 T/>.

/

l 16 799.

i i

j 1.16 - 8

~..

OPERATING DATA REPORT DOCKET NO. 050-0324 DATE 61/07/83 COMPLETED BY FRANCES HARRIS 0t TELEPHONE 919-457-9521 OP': RATING STATUS ,

1. UNI NAME: BRUNSWICK ONIT 2 *I NOTES I
2. REPORTING PERIOD: DECEMBER 82 I I
3. LICE'.45ED THERMAL POWER (MWT): 2436 I I 4 N41EPL4TE RATING (GROSS MWE): 867.0 I . I
5. DE5 :N ELECTRI:AL RATING (NET MWE): 821.0 I I 5 MAX bE'a-:1DAHLE CAPACITY (GROSS MWE): 815.0 I '
7. v44 ;ER 1043u2 CAPACITY (NET MWE): 790.0 ---- -------------------------
3. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GI#d REABONS: -
v. .04i4 _EJEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE 10 .EA.iN9 FOR RESTRICTION IF ANY THIS YR TO CUMUL MONTH DATE ATIVE It HJU'M f'J REP 09 TING PERIOD 744.0 8760.0 62795.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 633.4 3609.2 38776.1 13.;Y4 TY4 RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 14 "0045 GENERATOR ON LINE .595.8 3381.1 36150.4

. 5 _W ! : R PE4VM SHUTDOWN HOURS 0.0 0.0 0.0

16. C h00:. THEdMAL ENERGY GENERATED (MWH) 1274129.0 6299441.2 66296979.8
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 433131.0 2022755.0 22016692.0
19. NET ELE::TRICI AL ENERGY GENERATED (MWH) 418113.0 1902524.0 21091926.0

.v. UNif SiiVICd FACTOR 80.1 38.6 67.6 20 UNIT AVoILABILITY FACTOR , 80.1 38.6 57.6

21. UNIT CALACITY ACTOR (USING MDC NET) 71.1 z7.5 4z S
22. UNIT CADACITY CACTOR (USING DER NET) 68.5 26.5 40.9
23. UNIT FORCED OUTAGE RATE 19.8 17.7 17.1
24. 5HUTD0wNS SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. IF SHUTUOWN Af END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 9/ 0/ 0

~

d ' . I '; TEST BTATUS (DRIOR TO COMMER1CI AL OPERATION): FORCAST ACHE: VED INITIAL CRITICALITY ,

INITIAL ELECTRICITY ,

COMMdRICIAL OPERATION -------- --------

1.16 - 9

p m Q.

DOCKET NO. 050-0324 -

UNIT SHUTDOWNS AND POWER REDUCTIONS Brunswick 2

' UNIT N AME DATE January 1983 COMPLETED BY Francen II,rrison REPORTMONTIID ecember 1982 TELEPl!ONE (919) a s7-9 s 11 t

l, r I . . . .

. s i s I

I-, ,$E 3 j .E ii  ! '

  • Licensee je,, jvt Cause & Corrective ,

.%. Date R E Ej $ 2yJ -

. Event p pu ,

Action to ,

F $ i:, u 3 ;f, . $ . Report # to d o . . Prevent Recurrence a l . 4 i i U d - i . . .

f --

b_ l .

82-06; 821209 8 10.1

. ment and rod' improvement shuffle.

Performed a control rod improvement to ~

obtain a hotter rod pattern which would ,

- result in the unit operating at a higher

. stable power level. ,.

I 2 3 4 - -

F: Forced ~ Reason:- .

Method: Exhibit G. Instructions S: Scheduled A l'iiuipment Failure (Explain) l Manual . . for Preparation of Data ll Maintenance of Test 2-Manual Scram. Entry Sheets for Liecusee

, C Itefueling . 3 Automatic Scram. Event Report (LER) File (NUREG-

- D Iteguiatory Restrictlun s 4 Continuations 0161) .

E Operator Training & Ucense Examination 5-Load Reductions

- F. Administrative .

6-Other .

8

. G Operational Error (Explain) . Exhibit I .Same Sourec

~

(9/77) H-Other (Explain) -

r .. .,.. .

-o

(% ,

p .

UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0324 UNIT N AME Brunswick 2 DATE January 1983 COMPLETED DY F*nnces II:irrison REPORT MONTil December 1982 TELEPl!ONE (919) 45/-9521 a

a. . . .
4. 5 E

.E E 3 j .5 F, ' ' Licensee 3% Cause & Corrective .

2yG gg No. Date k 5g R . Event %g ,

. Action to ,

H

$5 5 .5

-c 5.' . Report # wU o U

. . Prevent Recurrence

. 1 D - 82-068 821222 F 47.8 A 3. NA EB GENERA R"eactor scram - Power unbalance scram.

. Determined cause of scram to be technicia i error. Restarted unit.

(1) Require relay crew tdchnicinas workin; at BSEP' to use BSEP procedures.

c (2) Require' relay callbration be' done

  • i

. shutdown. "

I 2 3 4 - <

F: Forced ~ Reason: .

Method: Exhibit G Instructions S: Schedu!cd A.I'quipment Failure (Explatn) l. Manual .

for Prerstation of Data D.M.iiniensnee of Test 2 Manual Scram. Entry Slicets for Licensee

, C.Ilefueling 1 Automatic Scram. Event Repost (LER) File (NUREG.

D Itegulatory Restriction . 4 Continuations -

0161) .

E Operator Training & License Examinatioh s 5-Load Reductions .

. F-Administrative '

6-Other -

I C Operational Etrur (Explain) , Exhibit 1.Same Source *

!!-Other (Explain)

(9/77) '.

n. . .,

g ,

.. .eq._

UNITSi. 30WNS AND POWER REDUCTIONS NCKET NO. 30-0324 .

. UNIT NAME Brun gick 2 DATE Januarv 1983 .

COMPLETED DY Frnnern 11 ir e ; 90n REPORTMONTHDecember 1982 TELEPI(ONE (9141 as7-os?i s.

"t.r a

  • Er -

- E "h '

  • Licensee E% Cause & Corrective '

No. Date H

h 3$ $ 3 3h '*E 1 . Event

($

00

. Action to ,

35 el Ji g ,.' Repor # .

o . . Prevent Recurrence

. - 5 u N

  • 82-071- 821227 . S 5.8 B 5 NA -- -

Reduced power for rod improvement.

l, . .

.. c

. -s . .

i , .

l Il 2 3 4 .

F: Forced Reason: .

  • '. Method: Exhibit G. Instructions 5: Scheduled A l'quipment Failure (Explain) l Manual . for Preparation of Data ll M.iintenance of Test 2 M.mual Scram. Entry Sheets for Licensee

, C Itefueling 1. Automatic Scram. Event Report (LER) File (NUREG.

D llegulatory Restriction -

. . 4 Continuations . '0161) .

E Operator Training & License Examination 5-Load Reductions .

. F Administrative .

6-Other I l

G-Operational Errur (Explain) Exhibit I .Same Source *

! N/77)  !! Other(Explain)

  • r, . . .