ML20071C836
| ML20071C836 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 01/31/1983 |
| From: | Harrison F CAROLINA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML20071C829 | List: |
| References | |
| NUDOCS 8303080158 | |
| Download: ML20071C836 (10) | |
Text
0 APPENDIX DOCKET No.: 050-325 UNIT:
Brunswick No. I DATE: January.1983 s-COMPLETED BY:
Francis Harrison
~
OPERATIONS
SUMMARY
BRUNSWICK UNIT NO. 1 Brunswick Unit.No. I operated at 32.5% availability factor for the month of December with a 20.1% capacity factor.
The unit separated from the grid December 11, 1982, for a refueling / maintenance outage.
There are 476 BWP and 160 PWR spent fuel bundles in the Brunswick No. 1 fuel pool.
1 l
8303000158 830110 PDR ADOCK 06000324 R
APPENDfX B AVERAGE DAILY POWER LEVEL DOCKET-NO. 050-0325 UNIT BRUNSWICK UNIT 1 DATE 01/04/83 COMPLETED BY FRANCES HARRIS 01 TELEPHONE 919-457-9521 DECEMBEP B2 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1 523.
17
-6.
2 516.
18
-6.
3 501.
19
-6.
4 515.
20
-5.
5 511.
21
-5.
6 508.
,22
-5.
7 507.
23
-5.
8 506.
24
-5.
3 9
- 503.
25.
-5.
10 459.
26
-5.
11
-8.
27'
-5.
12
-9.
28
-6.
i 13
-8.
29
-5.
14
-6.
30
-6.
15
-5.
31
-6.
16
-5.
i i
1.16 - 8 l
l l
OPERATING LATA REPORT DOCKET NO. 058-0325 DATE 01/04/83 COMPLETED EY FRANCES HARRI:Gis TELEPHONE 919-457-9521 GPERATING i.TATUS
- 1. UNIT NAME: BRUNSWICK UNIT 1 I NOTES I
- 2. REPORTING PERIOD: DECEMBER.82 I
I
- 3. LICENSED THERMAL POWER (MWT): 2436 I
I
- 4. NAMEPLATE RATING (GROSS MWE): 867.0 I
I
- 5. DESIGN ELECTRICAL RATING (NET MWE) : 821.0' I I
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.9 I I
- 7. MAX DEPENDABLE. CAPACITY (NET MWE): 790.0
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE
- 11. HOURS IN REPORTING PERIOD 744.0 8760.0 50761.0 l
- 12. NUMBER OF HOURS REACTOR WAS. CRITICAL 241.6 5623.2 33888.5
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0' O.0 1647.1
- 14. HOURS GENERATOR ON LINE
.241.6 5430.3 31970..G
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 l
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 376734.3 9478209.7 63896014.3 l
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 126519.0 3060980.0 21062188.0 l
- 18. NET ELECTRICI AL ENERGY GENERATED (MWH) 118192.0 2921622.0 20225119.0 l
- 19. UNIT SERVICE FACTOR 32.5 62.0 63.0 l
- 20. UNIT AVAILABILITY FACTOR 32.5 62.0 63.0
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 20.1 42.2 50.4 l
- 22. UNIT CAPACITY FACTOR (USING DER NET) 19.3 40.6 48.5
- 23. UNIT FORCED OUTAGE RATE 0.0 33.0 24.1
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
4/30/83 l
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERICI AL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERICIAL OPERATION 1.16 - 9
J.
APPENDIZ DOCKET No.: 050-324 UNIT: Brunswick No. 2 DATE: January 1983 COMPLETED BY:
Francis Harrison OPERATIONS
SUMMARY
BRUNSWICK UNIT NO. 2 Brunswick Unit No. 2 operated at 80.1% availability factor for the month of December with a 71.1% capacity factor. There were two power reductions and one off-line outage this month.
There are 424 BWR and 144 PWR spent fuel bundles in the Brunswick No. 2 fuel.
pool.
The corrected copy of the forced outage rate for November is attached.
l l-i e
l 4
-v e
r re-a
--n--n
- '- - - - - - - + -
n--
wsennunwJwrvewn DOCKET NO. 050-0324 DATE 12/21/92 COMPLETED BY FRANCES HARRISO TELEPHONE 919-457-9521 OPERATING i.TATUS 1.
uNIi N/"E: 9RUNSWiCh UNIT 2 I NOTES I
- 2. REPORTI'G PERIOD: NOVEMBER 82 I
I 3.
LICENSE 3 TEERNAL POWER (MWT)t 2436 I
I 4
NAMEPLA E RATING (GROSS MWE): 867.6 I
I
- 5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I
I
- 6. MAX DE~ENDABLE CAPACITY (GROSS MWE): 915.0 I I
T.
MA): DE?iNDABLE CAPACITY i.NLT MWE): 79G.0
- 9..IF CHM.:ES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT,
?IVF RE SONS:
9.
P0ki$ _-VEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
- G. REASONi 20R RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE
- 1. HOURS IN REPORTING FERIOD 720.0 S016.0 62041.0 2.
NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 2975.8
'0142.7
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. H'0URS GENERATOR.ON LINE 0.0 2785.3 35554.6
- 15. UNIT REiERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERHAL ENERGY. GENERATED (MWH)
O.0 5025312.2 65022949.8
- 17. GROSS EL'ECTRICAL ENERGY GENERATED (MWH) 0.0 1589624.0 21583561.0
- 18. NET EL3CTRICI AL ENERGY GENERATED (MWH)
-7387.0 1484411.0 20673813.0
- 19. UNIT SERVICE FACTOR 0.0 34.7 57.3
- 20. UNIT AVAILABILITY FACTOR 0.0 34.7 57.3
- 21. UNIT CAPACITY FACTOR (USING'MDC NET)
-1.3 23.4 42.2
- 22. UNIT CAPACITY FACTOR (USING DER NET)
-1.2 22.6 40.6
- 23. UNIT FORCED OUTAGE RATE 0.0 17.3 17.1
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURA' TION OF EACH):
4
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 12/ 2/82
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERICI AL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERICIAL OPERATION 1.16 - 9 G
4PPENDIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0324 UNIT BRUNSWICr' UNIT 2 DATE 01/07/83 COMPLETED BY FRANCES HARRIS 01 TELEPHONE 919-457-9521 DECEMBER 92 9AY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1-
-9.
1,7 795.
2
-9.
18 781.
3
-9.
19 592.
4
-11.
20 796.
5 156.
21 795.
A 364.
22 3?3.
7' 570.
23
-16.
A 652.
24 328.
9
- 682.
25.
^630.
10 578.
26 729.
It 7?7.
27 6S9 12 799.
28 724 1.<
794.
29 v a, v
14 774.
3g
- 79g, I
IK 792.
31 T/>.
/
l 16 799.
i i
j 1.16 - 8
~..
OPERATING DATA REPORT DOCKET NO. 050-0324 DATE 61/07/83 COMPLETED BY FRANCES HARRIS 0t TELEPHONE 919-457-9521 OP': RATING STATUS
- 1. UNI NAME: BRUNSWICK ONIT 2
- I NOTES I
- 2. REPORTING PERIOD: DECEMBER 82 I
I
- 3. LICE'.45ED THERMAL POWER (MWT): 2436 I
I 4
N41EPL4TE RATING (GROSS MWE): 867.0 I
I
- 5. DE5 :N ELECTRI:AL RATING (NET MWE): 821.0 I
I 5
MAX bE'a-:1DAHLE CAPACITY (GROSS MWE): 815.0 I 7.
v44 ;ER 1043u2 CAPACITY (NET MWE): 790.0
- 3. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GI#d REABONS:
- v..04i4 _EJEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE 10
.EA.iN9 FOR RESTRICTION IF ANY THIS YR TO CUMUL MONTH DATE ATIVE It HJU'M f'J REP 09 TING PERIOD 744.0 8760.0 62795.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 633.4 3609.2 38776.1 0.0 0.0 0.0 13.;Y4 TY4 RESERVE SHUTDOWN HOURS
.595.8 3381.1 36150.4 14 "0045 GENERATOR ON LINE 5
_W ! : R PE4VM SHUTDOWN HOURS 0.0 0.0 0.0
- 16. C h00:. THEdMAL ENERGY GENERATED (MWH) 1274129.0 6299441.2 66296979.8
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 433131.0 2022755.0 22016692.0
- 19. NET ELE::TRICI AL ENERGY GENERATED (MWH) 418113.0 1902524.0 21091926.0
.v. UNif SiiVICd FACTOR 80.1 38.6 67.6 20 UNIT AVoILABILITY FACTOR 80.1 38.6 57.6
- 21. UNIT CALACITY ACTOR (USING MDC NET) 71.1 z7.5 4z S
- 22. UNIT CADACITY CACTOR (USING DER NET) 68.5 26.5 40.9
- 23. UNIT FORCED OUTAGE RATE 19.8 17.7 17.1
- 24. 5HUTD0wNS SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 25. IF SHUTUOWN Af END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
9/ 0/ 0
~
d '. I '; TEST BTATUS (DRIOR TO COMMER1CI AL OPERATION): FORCAST ACHE: VED INITIAL CRITICALITY INITIAL ELECTRICITY COMMdRICIAL OPERATION 1.16 - 9
Q.
p m
DOCKET NO.
050-0324 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME Brunswick 2 DATE January 1983 COMPLETED BY Francen II,rrison REPORTMONTII ecember 1982 D
TELEPl!ONE (919) a s7-9 s 11 l
I r
t s
i s
I I-,
,$E 3
j.E ii
! '
- Licensee je,,
jvt Cause & Corrective Date R
E Ej 2yJ Event to d pu p
Action to F
$ i:,
u 3 ;f,. $
Report #
Prevent Recurrence o
U l
4 i
i a
d i
f b_
l 10.1
- B 5
NA Ileduced power for control rod adjust-82-06; 821209 8
ment and rod' improvement shuffle.
Performed a control rod improvement to obtain a hotter rod pattern which would
~
result in the unit operating at a higher stable power level.
I 2
3 4
Method:
Exhibit G. Instructions F: Forced
~ Reason:-
S: Scheduled A l'iiuipment Failure (Explain) l Manual
. for Preparation of Data ll Maintenance of Test 2-Manual Scram.
Entry Sheets for Liecusee C Itefueling 3 Automatic Scram.
Event Report (LER) File (NUREG-s 4 Continuations 0161)
D Iteguiatory Restrictlun E Operator Training & Ucense Examination 5-Load Reductions 6-Other 8
F. Administrative G Operational Error (Explain)
Exhibit I.Same Sourec
~
(9/77)
H-Other (Explain) r
(%
p
- o DOCKET NO. 050-0324 UNITSHUTDOWNS AND POWER REDUCTIONS UNIT N AME Brunswick 2 DATE January 1983 REPORT MONTil December 1982 COMPLETED DY F*nnces II:irrison TELEPl!ONE (919) 45/-9521 a
a.
4.
5 E
.E E 3
j.5 F,
' ' Licensee 3%
%g Cause & Corrective No.
Date k
5g R
2yG Event gg
. Action to H
$5 5
.5 5. '
Report #
wU Prevent Recurrence o
-c 1
U D
82-068 821222 F
47.8 A
3.
NA EB GENERA R"eactor scram - Power unbalance scram.
Determined cause of scram to be technicia i
error. Restarted unit.
(1) Require relay crew tdchnicinas workin; at BSEP' to use BSEP procedures.
c (2) Require' relay callbration be' done i
shutdown.
I 2
3 4
Method:
Exhibit G Instructions F: Forced
~ Reason:
for Prerstation of Data S: Schedu!cd A.I'quipment Failure (Explatn)
- l. Manual D.M.iiniensnee of Test 2 Manual Scram.
Entry Slicets for Licensee C.Ilefueling 1 Automatic Scram.
Event Repost (LER) File (NUREG.
0161) 4 Continuations D Itegulatory Restriction E Operator Training & License Examinatioh 5-Load Reductions s
6-Other I
F-Administrative C Operational Etrur (Explain)
Exhibit 1.Same Source (9/77)
!!-Other (Explain)
- n..
g
...eq._
NCKET NO. 30-0324 UNITSi. 30WNS AND POWER REDUCTIONS UNIT NAME Brun gick 2 DATE Januarv 1983 COMPLETED DY Frnnern 11 ir e ; 90n REPORTMONTHDecember 1982 TELEPI(ONE (9141 as7-os?i "t.
s.
r a
E "h
3 '*E 1
'
- Licensee Er E%
Cause & Corrective 3h Event
($
. Action to No.
Date h
3$
H 35 el Ji g,.'
Repor #
00 Prevent Recurrence o
5 u
N 82-071-821227 S
5.8 B
5 NA Reduced power for rod improvement.
l, c
-s i
l I l 2
3 4
Method:
Exhibit G. Instructions F: Forced Reason:
for Preparation of Data 5: Scheduled A l'quipment Failure (Explain) l Manual ll M.iintenance of Test 2 M.mual Scram.
Entry Sheets for Licensee C Itefueling
- 1. Automatic Scram.
Event Report (LER) File (NUREG.
D llegulatory Restriction 4 Continuations
'0161)
E Operator Training & License Examination 5-Load Reductions 6-Other I
F Administrative l
G-Operational Errur (Explain)
Exhibit I.Same Source
! N/77)
!! Other(Explain) r,..
.