II :1
. Dt:he%<rCompany ' ' D L Rens Catauba Nuclear Generation Departnen! \ ice he:ident 4M10 ConcordRoad . (S03)3313M Office .
York, SC29745 . . (803)&113126 Tax
! DUKEPOWER April 1,1994 .
t U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001
Subject:
Catawba Nuclear Station Docket Nos. 50-413 and 50-414 199310 CFR 50.59 Report i
Pursuant to 10 CFR 50.59, find attached a summary of all changes, tests, and experiments whcih were completed under the provisions of 10 CFR 50.59 from '
October 1,1992 to September 30,1993.
Very truly yours, i
D. L. Rehn GCD/5059COV.494 Attachment :
xc: S. D. Ebneter Regional Administrator, Region 11 1
1 R. J. Freudenberger Senior Resident inspector i
R. E. Martin, ONRR l 9404050160 940401
)
\ >
mm . m>_ e
U. S. Nuclear Regulatory Commission 7 April 1,1994 Page 2 bxc: (w/o attachments)
ELL - EC050 M. E. Patrick Z. L. Taylor NCMPA-1 NCEMC PMPA SREC (w/ attachments)
Group File: 801.01 Catawba Document Control: 801.01 i
1 I
l
r
' CATAWBA NUCLEAR STATION
SUMMARY
OF PROCEDURE-RELATED 10 CFR 50.59 EVALUATIONS J IT/2/A/4350/15B, Change #12-l Descrintion This change adds a section to the procedure so that the response of the Diesel Generator (D/G) to a step load l increase while on an isolated bus can be measured.
Evalpation l This change is being implemented to satisfy retest requirements following replacement of the D/G governor. He l test method used is identical to that used in PT/2/A/4350/12, Section 12.1, except that different pumps are being ' l used to provide the load on the D/G. He pumps being used for this test are operated in their normal alignment. l Starting pumps while the D/G is on an isolated bus is no different than the loading seen by the D/G during a sequencer actuation. This test has no effect on the ability of D/G,2.A to supply essential power to Train A should the 2B D/G be unable to supply its loads. He margin of safety as defined in the basis of the Technical Specifications is not reduced. Therefore, the implementation of this modification does not represent an unreviewed safety question.
IT/l/A/4200/21 A, Change #36 i
Dexrinhos ;
This change added two enclosures to the procedure to allow testing of valves 1KC-51 A and 1KC-54B under '
design basis conditions as required by Generic Letter 89-10.
Evaluation His change has no impact on the flow and heat removal capacity for any loads normally aligned to the KC System. The KC pump flowrate under this change remains within limits associated with normal plant operation.
No new failure modes were identified to be associated with this change. This change has no adverse affect on the ability of the KC Systern to supply post-accident loads. Equipment used or affected by this test are either isolated or operated in their normal alignment. No operating parameters nor design limits are affected by this change.
The rnargin of safety as defined in the basis of the Technical Specifications is not reduced. Therefore, the implementation of this modification does not reposent an unreviewed safety question.
IT/2/A/4200/21 A, Change #13 Descrintion This change added five enclosures to the procedure to allow testing of valves 2KC-50A,2KC-53B,2KC-228B, 2KC-C37A, and 2KC-C40B under design basis conditions as required by Generic Letter 89-10.
Evaluatios His change has no impact on the flow and heat removal capacity for any loads nonnally aligned to the KC System. The KC pump flowrate under this change remains within limits associated with normal plant operation.
No new failure modes were identified to be associated with this change. This change has no adverse affect on the ability of the KC System to supply post-accident loads. Equipment used or affected by this test are either isolated Procedures Page1
C or operated in their normal alignment. No operating parameters nor design limits are affected by this change.
The margin of safety as defimed in the basis of the Technical Specifications is not reduced. Therefore, the ;
implementation of this modification does not represent an unreviewed safety question.
l PT/2/A/4200/21 A, Change #17 Description This change added one enclosure to the procedure to allow testing of valve 2KC-51A under design basis conditions as required by Generic Letter 89-10.
Evaluation This change has no impact on the flow and beat removal capacity for any loads normally aligned to the KC l System. The KC pump flowrate under this change remains within limits associated with normal plant operation. -
No new failure modes were identified to be associated with this change. This change has no adverse affect on the ability of the KC System to supply post-accident loads. Equipment used or affected by this test are either isolated -
or operated in their normal alignment. No operating parameters nor design limits are affected by this change.
The margin of safety as defmed in the basis of the Technical Specifications is not reduced. Therefore, the ,
implementation of this modification does not represent an unreviewed safety question. ,
PT/l/A/4200/27, Change #22 Description This change deleted several unnecessary procedure sign-offs related to independent verification and acknowledgment by an SRO.
Evaluation With regard to independent verification, it was determined that the specific steps did not require independent <
verification per the guidance given in Operations Management Procedure 1-5. For the SRO sign-off.. it was determined that the intent of the step was met without requiring an SRO-signoff. These changes do not affect the test method and in no way affect the ability of the NW system to perform its intended function. The margin of safety as defined in the basis of the Technical Specifications is not reduced. Therefore, the implementation of this mcxlification does not represent an unreviewed safety question.
I PT/2/A/4200/27, Change #17 1
Descrintion This change deleted several unnecessary procedure sign-offs related to independent verification and acknowledgment by an SRO. 1 Evaluation With regard to independent verification, it was determined that the specific steps did not require independent verification per the guidance given in Operations Management Procedure 1-5. For the SRO sign-off, it was determined that the intent of the step was met without requiring an SRO-signoff. These changes do not affect the test method and in no way affect the ability of the NW system to perform its intended function. The margin of safety as defined in the basis of the Technical Specifications is not reduced. Therefore, the implementation of this modification does not represent an unreviewed safety question.
l Procedures Page 2
I
.j EP/1/A/5000/1C, RETYPE #15 Descrintion This retype changes step 16. Due to poor throttling characteristics of valve 1NI-208, minor mod CE-4163 was performed to install a throttle valve downstream of INI-210. INI-208 has been returned to the closed position, IN!-210 opened, and the new valve (INI-482) throttled for a controlled bleed.
Evaluation Since this rety,,e only changes the procedure as needed to account for changes made to the plant and are described on a compensatory action, no further review of the FSAR beyond that performed for the mod and the comp action, is required.
IIP /0/B/1003/11, RETYPE #10 Description The purpose of this procedure is to provide a method of operation, calibration and source check for the Eberline Model RM-14. Changes within this retype improve efficiency in personnel / time management while ensuring all Technical Specifications are met. RM-14s at exit / release locations will still be source checked daily _ since these locations are the last survey point prior to equipment / personnel release. RM-14s h>cated throughout the plant will j he source checked weekly.
Evaluation ,
The original procedure was written before installation of the PCM Whole Body Counters and the Small Article )
Monitors located at each release point. The PCMs and SAMs are now our primary means of release for personnel i and equipment. The contamination alarms indicated on the PCMs and SAMs are investigated by RP personnel I using the designated RM-14s at each release point. This procedure does not affect any structures, systems, or components, it does not involve any test or experiments and does not require an unreviewed safety question evaluation.
11P/0/B/1004/02, RETYPE #7 Description The purpose of this procedure is to provide guidance for RP Source Handling. The retype includes guidance to account for sources that do not require leak testing per CNS Tech Specs 3/4.7.9 but are greater than exempt ]
concentrations and exempt quantities (Reference memo to WP Deal from RE Sorber, dated 6/18/91), to reduce j paperwork, and to eliminate the need for RP/ Inst. Cal personnel to log out sources used for calibration or source checks of instruments on a daily basis. j Evaluation Upon completion of review of the FSAR and Tech Specs, the revisions to this procedure will not create an ,
unreviewed safety question or require a change to Tech Specs; nor does it use or affect any safety related equipment. It is not used for the evaluation of accidents as described in the FSAR.
I i
lip /0/B/1004/03, RETYPE #4 )
l I
i Procedures l Page 3
Descrintion nis procedure provides guidance for leak test and inventory of radioactive sources. It was changed so that leak test of sealed sources is required only for sources that exceed the limits of Tech Spec Section 3/4.7.9. Sources that are greater than 100uci beta and/or gamma emitting material or less than Suci alpha emitting material no longer require leak test and inventory by this procedure, but accountability of these sources will be maintained by ;
adhering to HP/0/B/1004/02. These changes will clarify the source inventory and leak test requirements, documentation and filing. They will also reduce the number of sources requiring leak testing by adhering to the Tech Spec limits.
Evaluation l He procedure was changed to reflect requirements of CNS Tech Specs Section 3/4 7.9. This change does not ;
constitute an unresolved safety question and does not involve equipment or systems that are safety related.
i HP/0/B/1009/04, RETYPE #20 '
Descrintion This procedure provides guidance for environmental monitoring for emergency conditions within the ten mile radius of CNS. This retype specifies use of a single channel analyzer, as opposed to a portable multi-channel gamma analyzer for field iodine measurements and will require a change to FSAR Section 12.5.2.1.1, last paragraph. The single channel analyzer is easier to maintain and use. This change also affects FSAR Section )
12.5.2.2.1, last paragraph. He new instrument only measures gross kxline concentration and does not distinguish l between particulate and gaseous lodine. FSAR Section 12.5.3, page 12-35, second paragraph mentions
" particulate", which needs to be deleted.
Evaluation it was determined that the single channel analyzer meets the requirements for measuring Iodine concentrations,- ;
and can do so much more quickly than the multi-channel analyzer. In addition, air sample cartridges are saved 1 after the initial analysis and can be re-analyzed at other locations such as the ASC or MNS, if more analysis is warranted. Changes made to this procedure do not involve systems, components or structures addressed in the FSAR and do not involve an unresolved safety question.
IP/0/B/3343/01, Change #13 i Description ne purpose of this procedure is to provide guidance to perform the Met System (EEB) weekly cal check. This procedure change increases allowable ranges to equal the requirements listed in Reg. Guide 1.23 since new equipment was installed per Minor Mod CE-3706 and tolerances were not changed at that time.
i Evaluation i
The system operation described in the FSAR will remain the same. The new equipment installed under the minor
~
mod exceeds the design basis of the recorders described by the FSAR. This system is not safety related and does not involve any equipment or system that is safety related. %e probability or consequences of a malfunction of equipment important to safety as described by the FSAR, will not be increased. No operating parameters, safety limits, or setpoints will be changed; therefore, no margins of safety as defined by Tech Specs will be reduced. In conclusion, there will be no unreviewed safety questions created by this change and no changes to Tech Spec will be required, i Procedures Page 4
IP/0/A/3850/09, Change #16 Description This procedure provides guidance for inspection and maintenance on motor control center breakers. This change allows removal of the retaining spring clips from the 600 volt molded case circuit breakers whenever a breaker is removed from service for maintenance.
Evaluation Retaining spring clips laying on the bus during maintenance creates a high potential for a fault to occur. PIR 0-C92-0770 deems this component as performing no useful function and creates a potential for a fault condition.
This change will nor require any changes to the FSAR. System functions, as described by the FSAR, will not be affected by this change. This change does involve safety related equipment, but does not involve tests that have not previously been evaluated. The probability or consequences of a malfunction of equipment important to safety, as described by the FSAR, will not be increased. No operating parameters, safety limits or setpoints will be changed, therefore no margins of safety , as defined by Tech Specs, will be reduced. In conclusion, there will be no unreviewed safety questions created by this change and no changes to Tech Specs will be required.
IP/0/A/3850/23, Change #9 pescrintion This procedure provides guidance to the inspection and testing of molded case circuit breakers. 'Ihis change adds the 125VDC distribution center feeder / incoming breakers to the CNS existing breaker testing and inspection program. These breakers will be tested in accordance with " Periodic Tests" as described by the FSAR section 8.3.2.1.2.3.2 and in accordance with Nuclear Generation Directive 3.2.2.
Evaluation This procedure change will nor require a change to the FSAR. System functions, described by the FSAR, will not be affected by this change. This change does involve safety related equipment, but does not involve tests that have not been previously evaluated. The probability or consequences of a malfm Fon of equipment important to safety, as described by the FSAR, will not be increased. No operating parameters, safety limits or setpoints will be changed, therefore no margins of safety , as defined by Tech Specs, will be reduced. In conclusion, there will be no unreviewed safety questions created by this change and no changes to Tech Specs will be required.
IP/1/A/3181/01, Change #18 Description "Ihe purpose of this procedure is to provide guidance for working with the Liquid Waste System (WL) safety related sump level control switches. This change changes steps in the procedure to verify that the pump is "on" when actuating the middle switch (Hi-Ili Level), reflects as-built conditions and makes the procedure agree with the correct logic for pump actuation.
Evaluation Procedures Page 5
1 This procedure change does not increase the probability or consequences of an accident or a malfunction of equipment important to safety evaluated in the FSAR. Neither does it create the possibility for an accident or a malfunction of a different type than any evaluated in the FSAR. His procedure change will not reduce the margin
. of safety as defined in the basis for any Tech Spec. Therefore, it is determined that no unreviewed safety questions are created as a result of this procedure change.
Irr/0/A/4400/22A, Change #39 Description ne purpose of this procedure is to provide guidance for IWP testing of the Nuclear Service Water System (RN)
Pumps for Train A. This procedure change adds an additional flowpath so that the flow specified as the reference value can be obtained (RN-to-CA flush line). .After the pump data has been recorded and the RN flow through the line secured, RC will be used to backflush the RN-to-CA line to remove RN grade water left in the CA suction Pi ping.
Evaluation During the time that RN is flowing to RC, RN A Train will conservatively be considered inoperable due to the possibility of " starving" other components (KC, NS, KD, CA) of flow. However, RN B Train will be unaffected by this test, and would be able to perform its function in the event of an accident. Neither the possibility nor the consequences of any accident will be increased by this change since B Train RN is unaffected. Neither the probability nor the consequences of a malfunction of equipment important to safety will be created by this change.
He margin of safety, as defined in the bases to Tech Specs, will not be reduced.
OP/2/A/6150/06, Retype #7 Dewrintion The purpose of this procedure is to provide guidance for draining the Reactor Coolant System (NC). This procedure retype incorporates various human factor and editorial changes. Among the more significant changes, retype #7 changes references and some step sequences for reduced inventory from ;6% to a more conservative 25 %, changes Limit and Precaution (L&P) 2.2 to state requirements for operation below 6.5 % level regardless of the reason for draining the NC System, L&P 2.23 changed to when NC System level should be maintained to greater than or equal to 6.5 % whm fuel is in the core, added Enclosure 4.11 to provide draining of S/G tubes via i nitrogen injection during initial drain of NC System, during vacuum refill or when filling refueling cavity, added l' step 2.15 to Enclosure 4.1 to ensure the PZR is not pressurized prior to opening 2NC-300, step 2.2.9 of Enclosure 4.2 and the caution prior to step 2.2.9 were added to allow the option of increasing the drain down rate i for completely draining the NC loops by closing the NCDT outlet and recire valves, moved step to drain S/G l bowls to allow maximizing core cooling flow during bowl drain operatiore, added L&P 2.28 to ensure S/G tubes j are drained prior to fill & vent if the NC System is drained below 20%, and changed step 2.19 of Enclosure 4.10 i to require all 4 power sources available to ensure ND operability.
Evahiation l All changes associated with Retype #7 were designed to enhance the performance of this procedure incorporating !
current Human Factors philosophies. These changes will not result in a degradation of any system, ne operation of the NC System as discussed in the FSAR Section 5.4.7 and the NV System as discussed in FSAR Section 9.3.4 l and the accident analysis of Chapter 15 will not be changed. No unreviewed safety question is judged to be ,
create <L l Procedures Page 6
l OP/0/B/6200/23, Retype #2 Description The purpose of this procedure is to provide guidance for operating the RN System chemical addition system. This procedure retype is being revised to meet current NPDES requirements. The current discharge limits for CT-1 have dropped from 1.2 ppm to 0.4 ppm at Outfall 001. Also, biomonitoring was added as a requirement in the latest NPDES permit. These changes, along with the addition of instructions for the vendor injection and detoxification were added to this revision.
Evahution The effect of this test on the current RN System flow balance was discussed and the discussion determined that based on the current RN System balance, which _was performed with 2 pumps, that this procedure would not ,
reroute an amount of RN flow to RF that would cause RN flow to fall below the flow balance criteria. This assumes no more than 100 gpm flow is available to each RN/RF hose rack. These changes better reflect the injection process and will not have an adverse affect on the safe operation of the plant. Therefore, this revision does not: affect structures, systems, or components that are addressed in the FSAR in a significant manner, appear significant enough as to require inclusion into the FSAR, involve procedures as described in the FSAR in a significant manner, involve tests or experiments not addressed in the FSAR. No unreviewed safety question exists.
OP/1/B/6300/01, Change #35 (CIV #2) & #36 (CIV #1)(Both Changes Restricted) .
Descrintion The purpose of this procedure is to provide guidance for operation of the turbine generator. These procedure -
changes temporarily adds new Enclosures (Stop Valve #1 LII Leak Repair) which will be used to repair the LH leaks with the unit on-line in the event the leaks increase.
Evaluation During performance of these enclosures, all Turbine Trips and Overspeed Protection will be available. GE has reviewed the work plan and concurs that the guidance set forth by the enclosures will allow successful repair of the leaks while on-line. The Turbine Generator.will not be operated outside of its design and operating parameters, no unreviewed safety questions arejudged to be created by this change. i MP/0/A/7150/05, Retype #10 l
Descrintion The purpose of this procedure is to provide guidance for ice basket weight determination. This retype clarifies the l process, eliminates unnecessary steps, and equipment weighing process, and places data sheets in more logical and
{
useable order. "me most significant change involves the "On-line Weighing Method", in that the dial indicator is '
unnecessary. The retype also reduces the number of consecutive weights from eight to five.
Evaluation
]
The dial indicator was used to monitor the amount each ice basket was lifted as the weighing progressed. <
Experience has shown that the dial indicator is unnecessary and the use of a 1/2 pump stroke between weights is {
sufficient. Also, five weights has proven to be more than adequate to establish the weight of an ice basket. This 'l procedure has been compared with Tech Specs, the FSAR, design documents, and station procedures to ensure i
Procedures i Page 7 l l
I
.I that the actions it controls will provide accurate ice basket weights to support the surveillance requirements of Tech Specs and the accident analysis as described in the FSAR. Since the ice Baskets will be maintained in an operable condition through the use of this procedure the possibility of a malfunction will be reduced, therefore no unreviewed safety question exists. I MP/0/A/7150/016A, RETYPE #1 Description The purpose of this procedure is to provide guidance for Centrifugal Charging Pump corrective maintenance. This procedure was retyped to incorporate procedure changes 0 to 6, which significantly changed the procedure as a ,
whole.
Evaluation This procedure affects Technical Specifications 3.1.2.1, 3.1.2.3, 3.1.2.4, 3.5.2, and 3.5.3. Operations has the responsibility and the procedures for compliance with these Tech Specs, as this procedure is only used for system pump corrective maintenance. Maintenance will be performed on this pump only when these Tech Specs allow, per Operation's procedures. This retype will clarify and assure that maintenance activities will return the pumps to as4esigned conditions and has been reviewed against approved vendor manuals, design documents, and station procedures to ensure the corrective maintenance controlled by this procedure will return the pump to as-designed condition. This also ensures compliance to the FSAR accident analysis.
MP/0/A/7150/039, RETYPE #8 Description The purpose of this procedure is to provide guidance for Reactor Coolant Pump Seal Removal and Replacement.
This procedure was retyped to incorporate procedure changes 0 to 10, which significantly changed the procedure as a whole. Specific guidance was added for ensuring #1 Seal Ring and Runner are matched, to ensure all identification information for the new EPDM o-rings installed during the seal rebuild is recorded, removed all interference items identifiol in the prerequisites, allows procedure section 11.1 and 11.2 to be performed prior to !
NC System drain, moved certain procedure steps from the procedure section to an Enclosure since they are not part of a normal seal rebuild, requires a TIR check without the o-ring installed to ensure a proper fit, coupling installation steps were rewritten to overcome potential ambient and system temperature variances to ensure proper fit, and added precautions to handling EPDM o-rings.
Evaluation Tech Specs 3.2.3, 3.4.1, and 5.4 are affected by this procedure. Operations has the responsibility and the procedures for compliance with these Tech Specs, as this procedure is only used for system pump corrective maintenance. Maintenance will te performed on this pump only when these Tech Specs allow, per Operation's procedures. This retype will clanfy and assure that maintenance activities will return the pumps to as-designed conditions and has been reviewed against approved vendor manuals, design documents, and station procedures to ensure the corrective maintenance controlled by this procedure will return the pump to as-designed conditio'i. This ;
also ensures compliance to the FSAR accident analysis. i MP/0/A/7150/57, RETYPE #7 Description Procedures Page 8
]
l
)
1
-1 The purpose of this procedure is to provide guidance for Residual Heat Removal Pump Removal, Replacement !
and Corrective Maintenance. This retype provides additional guidance to install the pump impeller onto the shaft to ensure a proper clearance fit and to prevent galling between the shaft and impeller during installatmn. !
l Evaluation I Tech Specs 3.2.3, 3.4.1, and 5.4 are affected by this procedure. Operations has the responsibility and the ,
procedures for compliance with these Tech Specs, as this procedure is only used for system pump corrective '
maintenance. Maintenance will be performed on this pump only when these Tech Specs allow, per Operation's ,
procedures. His retype will clarify and assure that maintenance activities will return the pumps to as-designed l conditions and has been reviewed against approved vendor manuals, design documentr., and station procedures to ;
~
ensure the corrective maintenance controlled by this procedure will return the pump to as-designed condition. This also ensures compliance to the FSAR accident analysis.
MP/l/A/7150/59, CIIANGE #3 Descrintion The purpose of this procedure is to provide guidance for charging the Recipr(cating Charging Pump Suction and Discharge Pulsation Dampers. This change provides more accurate charge pressure for changing temperatures.
Evaluation He manufacturar recommended damper charge pressure changes depending on the damper's ambient temperature. 1 This change allows for determining correct damper charge by using a new equation, P'/T'=P*/r" (for a constant volume), where P' and T' are the recommended charge pressure at a specified temperature (70 degrees F). This change was also necessary since the suction damper was modified per NSM CN-ll271. This procedure has been .
reviewed against approved vendor manuals, design documents, and station procedures to ensure the corrective j maintenance controlled by this procedure will return the pump to as-designed condition. This also ensures -'
compliance to the FSAR accident analysis.Also, changes implemented by NSM CN-ll271 has been incorporated into this procedure.
MP/0/A/7150/73, CIIANGE #7 Description This procedure provides instructions to maintenance technicians who remove the steam generator primary manways for inspection and repair and provides steps which ensure that all removal and replacement activities are evaluated with respect to their effect on NC System vent path. This change deals specifically with hardware enhancements which facilitates the actual process of removing and installing the covers.
i Evaluatio1 This procedure change does not change the design intent of the steam generators, nor does it change the ability of the steam generators to perform their design function, therefore the effect of this change is not significant relative to the FSAR, nor does it warrant inclusion into the FSAR. It also does not include tests or experiments not addressed in the FSAR.
MP/0/A/7150/93, RETYPE #1 peserintion Procedures i Page 9 i
1
I l
%is procedure provides guidance to install / remove the secondary steam generator shell cover and associated !
wrapper plug, applicable to those of BWNS manufacturer. This safety evaluation does not attempt to justify the !
placement of any hole in the steam generator shellt rather, it specifically provides instructions for the l installation / removal of a cover over a pre-existing hole. j Evaluation Ir.stallation of the shell cover / wrapper plug ensures that no pressure boundary will be compromised on the steam generator. Worst case, there would be a 2.7" diameter hole in the shell, assuming a total failure of the cover. His could be considered a steam or feed line rupture, which both are bounded by the accident analysis in the FSAR.
He shell covers used have been verified (through NSM process) to be in conformance with applicable ASME code requirements. No malfunctions fall outside of what has already been evaluated in the FSAR and no operating limits or assumptions made in any safety analysis have been violated.
MP/0IA/7150/97, RETYPE #1 Description This procedure provides guidance for PM inspection of the Standby Make-up Pump pulsation dampers. This retype adds reference to PIR 0-C92-0812 and CNTC 1544-NV-P004-01 identifying minimum damper charge requirement, added steps to require verification of damper charge after a pump test if the damper is found below 90% charge during the pre-test damper charge verification, changed a step to require a damper recharge if the damper is found to be below 90% of the required charge, changed steps to use damper surface temperature, ,
instead of room temperature.
Evaluation This procedure was reviewed against approved vendor manuals, design documents, and station procedures to ensure activities controlled by this procedure will return the equipment to as-built condition, which will ensure compliance with FSAR accident analysis, will reduce the possibility of a malfunction, and does not involve an unreviewed safety question.
MP/0/A/7150/99, RETYPE #3 Description This procedure provides guidance for Steam Generator Nozzle Dam Installation / Removal. The change involves adding steps for the removal procedure for cold leg dams to ensure doing so will not cause a loss of Residual Heat Removal capability during reduced inventory conditions, and to ensure that no more than one cold nozzle is ;
removed at any one time.
Evaluation This change does not alter the structure or function of the Steam Generator or the nozzle dams, does not cause the.
Steam Generators or the nozzle dams to be used in a method contrary to their design intent, does not warrant inclusion into the FSAR, nor does it involve tests or experiments not addressed in the FSAR.
MP/0/A/7150/101, Initial Issue l Description This procedure was written to replace a similar Chemistry procedure for mixing sodium tetraborate ice solution Procedures Page 10
i d
l i
l i
since Maintenance performs this function. Chemistry will continue to sample the ice solution water.
Evaluation This procedure contains all of the requirements of the original Chemistry procedure, while minor revisions were made to make it more usable and clear. This procedure has been compared with Tech Specs and the FSAR to ensure that the actions controlled by this procedure will produce borated ice for use in the ice condenser that will meet all applicable requirements.
MP/0/A/7450/26, CHANGE #3 pescrintion This procedure provides guidance for Westinghouse 8000 Series Fans Corrective Maintenance. The change ,
reflects recommendations from the manufacturer relative to belt deflection force. j Evaluation !
Maintenance performed under this procedure has been reviewed against approved vendor manuals, design documents, and station procedures to ensure the corrective maintenance performed by this procedure returns the i equipment to as-built condition. This ensure compliance with the FSAR accident analysis. ,
I MP/0/A/7450/40, Initial Issue
\
Description j This procedure provides guidance for Control Room Chiller PMs.
Evaluation .,
Maintenance performed under this procedure has been reviewed against approved vendor manuals, design j documents, and station procedures to ensure the corrective maintenance performed by this procedure returns the i equipment to as-built condition. This ensure compliance with the FSAR accident analysis.
MP/0/A/7450/46, Initial Issue Description This procedure provides guidance for Control Room Compressor and Motor Assembly Corrective Maintenance.
Evaluation Maintenance performed under this procedure has been reviewed against appmved vendor manuals, design documents, and station procedures to ensure the corrective maintenance performed by this procedure returns the equipment to as-built condition. This ensure compliance with the FSAR accident analysis.
MP/0/A/7450/48, Initial issue Description This procedure provides guidance for Temporary Alteration of Station Dampers.
Evaluation Procedures Page 11
1 l
l
- j Maintenance performed under this procedure has been reviewed against approved vendor manuals, demgn
- documents, and station procedures to ensure the corrective maintenance performed by this procedure returns the equipment to as-built condition. This ensure compliance with the FSAR accident analysis.
l MP/0/A/7450/69, RETYPE #2 Descrintion This procedure provides guidance for maintenance and repair of Barber Coleman Actuators for Bahnson Service Company Administrative Field procedure number AFP-CNS-5.032, Rev. 2, dated 4/16/92.
Evaluation Tida procedure has been compared with Tech Specs, the FSAR, uid design documents to ensure that the actions it controls will comply with established Duke Power and station requirements to maintain plant equipment in its as-built condition, therefore the possibility of a malfunction will be reduced by this procedure.
MP/0/A/7600/08, RETYPE #6, and MP/0/A/7600/09, RETYPE #2 Descrintion This procedure provides guidance foi corrective maintenance for Tulline 1,2,3,4, and 6' Plug Valves (MP/0/A/7600/08) and Tufline 1/2 and 3/4" Plug Valves (MP/0/AD600/09). This retype results from OE-5817 which describes failures of Tufline Plug Valve cover fasteners which failed at Seabrook Unit 1. No similar failures have been reported at Catawba, however the procedure was changed to add a caution statement to inspect these fasteners for cracking and to determine any generic concerns.
Evaluation This change does not increase the probability or consequences of a accident previously evaluated, nor does it create the possibility of accident than any already evaluated in the FSAR. This component will still function as originally designed and does not increve the possibility of an malfunction to equipment important to safety previously evaluated in the PSAR. The a gin of safety defined in the bases of Tech Specs will not be reduced.
MP/0/A/7650/33, Initial Issue I
Description This procedure provides guidance for retubing the Reactor Coolant Drain Tank Heat Exchanger and provides technical direction to restore the heat exchanger to the original as-designed and constructed conditions.
Manufacturer's drawings and specs were incorporated into this procedure.
Evaluation l Past tubing failures have resulted in exhausting the plugging margin of the heat exchanger. The entire tuhmg bundle is being replaced by this procedure, with design approved tubing material, however, the bundle is being restored to the original design drawing specs and conditions, therefore the retubing work does not require inclusion into the FSAR. This activity does not involve any procedures described in the FSAR. Implementation of !
this procedure does not change the intended design function or safety function of the heat exchanger, nor is the 'I integrity of the Hx violated, but restored. No new failure or accident mode is created as a result of this procedure, nor are any changes to system parameters or operating sequences invo'ved.
Procedures Page 12 ')
MPiO/A/7650/57, RETYPE #6 Description This procedure provides guidance for Polar Crane Operation and Upper Containment Load Paths. This retype addresses movement of the polar crane during Modes I through 4.
Evaluation One change to this procedure allows movement of the polar crane bridge over the Steam generator enclosures, but under no circumstances is the main block allowed to be moved over the Steam Generator enclosures during Modes I through 4. The Steam Generator enclosures are excluded from all safe load paths to be used during Modes 1 through 4, thus if the auxiliary block ia used to carry a heavy load during Modes I through 4, it may not be moved over the enclosures. It is concluded as changed, the procedure will still forbid the transportation of any heavy load over the Steam Generator enclosures during Modes I through 4.
The other change ensures that both the operator of the polar crane and the associated flag person is qualified to use the crane as required, particularly for critical lifts. The protection afforded the Steam Generator enclosures / Steam Generators is not degraded the these changes. No other equipment is affected by this retype. There is no relaxation of operator / flag person qualification requirements, thus the probability of personnel error is not increased. No common mode failure is created. Neither any fission product barrier nor any source term evaluation is adversely affected. Neither any setpoint, design limit, or operating parameter is changed.
IT/l/A/4150/13B, CilANGE #31 i
Description This procedure provides guidance for the Calorimetric Reactor Coolant Flow Measurement and the change allows cold leg spare temperatures to be used in the flow calculation per Westinghouse analysis.
Evaluation i
Westinghouse has determined that the average of the cold leg active and spare RTD tempe atures for NC System flow determination are conservative based on data from Wolf Creek. This change does not affect equipment important to safety in any manner, the probability or consequences of an accident previously evaluated in the FSAR will not be increased, nor will the consequences of a malfunction of equipment important to safety previously evaluated in the FSAR will not be increased. No margin of safety is reduced.
IT/0/A/4150/17 CIIANGE #3 l
DescriptiOn This procedure provides guidance for Total Core Unloading. This change revises the unload pattem to reflect the perimeter of core coupling of detector pattern, and ensures proper procedure adherence (human features change);
Evaluation This new pattern enhances the effectiveness of the refueling / operation and protection of the fuel. Advantages include allowing a single core to be monitored by 3 excore detectors as late as possible in the unload process, increases opportunities for open water core movements, facilitates the control of drop lights and shoehorns. No safety features are jeopardized and no Tech Spec requirements are violated.
Procedures Page 13
.e l
PT/2/A/4200/01 A, RETYPE i
Description This procedure provides guidance for performing the Containment Integrated Leak Rate Test. "Ihis retype changes ,
some test alignments for some penetrations due to post operation system alignment needs, allows ND to remain in operation for core cooling, and the structural integrity test is not performed, however, the test still conforms to the requirements of 10CFR50, Appendix J and the provisions of ANSI N45.4-1972 (Mass Point Method).
t Evaluation This test is essentially the same test as outlined in Chapter 14 of the FSAR. The alignments for this test satisfy the requirements for containment closure and containment integrity for fuel movement. This procedure has been compared with Tech Specs, the FSAR, and design documents to ensure that the actions it controls will comply '
with established Duke Power and station requirements to maintain plant equipment in its as-built condition, therefore the possioility of a malfunction will be reduced by this procedure.
FT/2/A/4200/09, RETYPE Description This procedure provides guidance for Engineered Safeguards Features testing. This retype adds response times for valves 2SA2 and 5 for use by the quarterly IWV test, ensures VC/YC equipment is shown in the correct load group, deletes RN pump discharge isolation valve and motor coolant inlet isolation valve response times since the pumps are initially running, changed electrical alignment so that the KC and RN pumps are running, changed sequence of steps to record auto-connected load prior to manually starting KF pumps and deleted KF pump and Hydrogen Recombiners for power calculation, changed electrical alignments to allow use of normal or alternate incoming feeders to 4160V essential SWGR, setup of process cabinets and SSPS for initiation of test moved from procedure to enclosures, added steps to verify 2 ETA 3(4) TRIP light on sequencer panel is ON to verify breakers receives a trip signal from load sequencer, deleted valve 2RN-291/351 since valves will not close due to minimum flow requirements of RN pumps, and deleted somejumpers for NW interlocks since the interlocks are met.
Evaluation None of these changes increases the probability nor the consequences of an accident. The most significant change is to have the RN & KC pumps rtmnirg prior to the test so that they may be bad shed. This does not affect the systems significantly since the pumps would run after the actuation signal regardless of whether they are running prior to the test. They will be in their normal alignment. Pumps which receive a start signal are aligned to assure that a minimum flow path is available. The procedure requires immediate verification of flow upon actuation.
Testing is performed in accordance with the FSAR and Tech Specs. The bases of Tech Specs were reviewed and the margin of safety is not reduced by this test.
PT/l/A/4200/09A, CIIANGE #150 Description This procedure provides guidance for Auxiliary Safeguards Test Cabinet Periodic Testing. This change allows an additional and less time consuming means for documenting quarterly IWV stroke times obtained from this test and added valves IIASV-5080,5160,5400 and 5410 to be timed by this procedure for use for the quarterly IWV procedures (as opposed by timed individually by the quarterly IWV procedures).
J Procedures Page 14
i Evaluation l This change essentially allows stroke time testing of certain valves during the Auxiliary Safeguards Test to be i used in the quarterly IWV procedures to satisfy the quarterly test requirements of these valves when the Auxiliary Safeguards test is performed. This prevents unnecessary stroking / wear of the valves due to testing. It is purely a documentary change and does not affect test methods, or the safe operation of the unit.
J IT/2/A/4200/09A, CIIANGE #96 Description This procedure provides guidance for Auxiliary Safeguards Test Cabinet Periodic Testing. nis change allows an additional and less time consuming means for documenting quarterly IWV stroke times obtained from this test.
Evaluation This change essentu >wa stroke time testing of certain valves during the Auxiliary Safeguards Test to be used in the quarterly IWv procedures to satisfy the quarterly test requirements of these valves when the Auxiliary Safeguards test is performed. This prevents unnecessary stroking / wear of the valves due to testing, it is purely a documentary change and does not affect rest methods, or the safe operation of the unit.
IT/0/A/4200/13, ClIANGE #10 Description ,
This procedure provides guidance for the stroke time testing of RN System Shared Valves. This change deleted the requirement to perform Independent Verification for the as-found/as-left position for these valves when testing and to delete notification of completion of this test to the SRO.
Evaluation Independent Verification of these valve positions prior to and after testing is not required per OMP Section 15.
These valves will go to their safe'- ,sition upon receipt of a safety signal. The intent of the SRO sign +ff for communicating completion of test accomplished without the need for procedure sign-off. These changes do not affect test methods, or the safe s ation of the unit.
.i PT/1/A/4200/13C, CIIANGE #36 and IT/2/A/4200/13C, CIIANGE #19 Description This procedure provides guidance for stroke time testing of RN System valves. This change deleted the requirement to perform Independent Verification for the as-found/as-left position for these valves when testing and to delete notification of completion of this test to the SRO.
- Evaluation Independent Verification of these valve positions prior to and after testing is not required per OMP Suion 1-5. ,
Rese valves will go to their safety position upm receipt of a safety signal. The intent of the SRO sign-off for ' )
communicating compietion of testing is accomplished without the need for procedure sign- changes do not affect test methods, or the safe operation of the unit.
IT/l&2/A/.12 cam, A, IT/l&2/4250/03B, and IT/l&2/A/4250/03C RETYPES Procedures Page 15
e i
Description This procedure provides guidance for IWP testing of the CA System Pumps for both units. The retypes removed the requirements for the CA CO2 System to be taken out of standby readiness during testing, added allowance to ' >
N/A steps requiring test valve line-up if system is already aligned to Standby Readiness, changed designation for Independent Verification from IV to DV for Double Verification, pump parameters being measured by test were altered to correspond to an acceptable flow band similar to that of the OPS monthly Head Verification Test, combined 2 former steps for removing test equipment into a single step with the option to perform this step out of sequence, re-ordered certain steps to a more logical sequence, added a caution statement to the Comp Measure enclosure to require the UST be isolated prior to establishing injection paths to the Steam Generators, and added an option to allow the use of either a 01800psig or 0-2000psig gauge for discharge pressure test instrumentation.
Evaluation At least 2 CA System pumps are required operable if testing occurs during Modes 1,2,or 3. No changes to these procedures affect operability of the remaining 2 operable CA pumps. Since no new failure modes are introduced, all possible scenarios are bounded by existing accident analysis. These pumps will continue to be operated within the appropriate mechanical design limits. The removal of steps which take the CO2 System out of service will ensure sufficient fire protection remains available for all of the CA pumps during testing. These procedures have been compared with Tech Specs, the FSAR, and design documents to ensure that the actions they control will l comply with established Duke Power and station requirements to maintain plant equipment in its as-built condition, therefore the possibility of a malfunction will be reduced by this procedure.
FT/l&2/4200/29, RETYPES Description This procedure provides guidance to stroke time test the SA System valves per the quarterly IWV requirements.
These retypes add enclosures to allow the stroke time test to be initiated by manual starts of the CAPT when testing the pumps per the IWP procedure, allows use of ajumper with an in-line switch used to initiate stroking of valve, and designation for Independent Verification has been changed from IV to DV for double verification.
Evaluation Hese chsnges serve to increase the effectiveness and availability of the CA System during testing of the SA System valves. The use of an in-line switch jumper will improve the accuracy of obtained stroke times and eliminate arching concems across the links, and change from IV to DV conforms to the new requirements ofIV per Site Directives. Rese procedures have been compared with Tech Specs, the FSAR, and design documents to ensure that the actions they control will comply with established Duke Power and station requirements to maintain plant equipment in its as-built condition, therefore the possibility of a malfunction will be reduced by this procedure.
PT/2/A/4350/15A Description PT/2/A/4350/15A is the diesel generator 2A periodic test procedure, his procedure change was made as a result of the implementation of modification CN-20528. This procedure change: 1) changed Catawba' Electrical Elementary drawing numbers, 2) changed the section of the procedure which addresses non-essential trip bypass verification, and 3) changed the section of the procedure which addresses overspeed trip verification to reflect the relocation of the speed switch.
Procedures Page 16
Evaluation -
No unreviewed safety question was created as a result of this procedure change. Only diesel generator 2A is made inoperable by this test; 2B is still available if required. The diesel is run in a normal alignment, both paralleled to the grid and in an idling condition, by approved operating procedures. All accident analysis assumptions continue to be met.
PT/2/A/4350/15B Description PT/2/A/4350/15B is the diesel generator 2B periodic test procedure. This procedure change was made as a result of the implementation of modification CN 20528. This procedure change: 1) changed Catawba Electrical Elementary drawing numbers, 2) changed the section of the procedure which addresses non-essential trip bypass verification, and 3) changed the section of the procedure which addresses overspeed trip verification to reflect the relocation of the speed switch.
Evahtation No unreviewed safety question was created as a result of this procedure change. Only diesel generator 2B is made inoperable by this test; 2A is still available if required. The diesel is run in a normal alignment, both paralleled to the grid and in an idling condition, by approved operating procedures. All accident analysis assumptions continue to be met.
FT/2/A/4400/01 Description PT/2/A/4400/01 is the ECCS flow balance procedure. This procedure change was a complete rewrite of the subject procedure. The rewrite included both previously approved changes as well as new additional changes to enhance the procedure.
Evaluation No unreviewed safety question was created as a result of this procedure rewrite. Perfonnance of this procedure will continue to ensure that all technical specification surveillance requirements are satisfied for the ECCS and that the system will be able to meet its design safety function when required during accident conditions.
i FT/2/A/4400/01 Description PT/2/A/4400/01 is the ECCS flow balance procedure. This change allows for a portion of be procedure to be perfonned in Mode 6 by aligning the RilR pumps to take suction from the hot leg loops (B & C). Valves 2FW- l
' 27A and 2FW-55B are closed while valves 2ND-1B, 2ND-2A, 2ND-36B, and 2ND-37A are in their open position. 'Ihe discharge path, cold leg injection lines, remains the same. Also, a page was added to perform comparisons ofinstalled indications to control room and operator aid computer indications.
Evaluation '
This test verifies the operability of ND pump 2A and at no time of this test will ND pump 2A be rendered non-ll functional nor will ND pump 2B be rendered inoperable. 'ND pump 2B is removed from service briefly to verify '
Technical Specification 4.5.2.h.3. While ND pump 2B is off, ND pump 2A is providing flow to the cold leg injection lines, thus ND flow to the cold legs is not interrupted and adequate core colling is maintained.
Pr/2/A/4400/01 Procedures Page 17 i
i 1
i Drscription IYT/2/A/4400/01 is the ECCS flow balance procedure. This change allows for a portion of the procedure to be performed in Mode 5 and allows for D/P testing of valve 2ND45B. This change adds a procedure enclosure which allows for D/P testing of valve 2ND-32A in Mode 5. Also, a page was added to perform comparisons of installed indications to control room and operator aid computer indications.
Evaluation j
. During the performance of the procedure, the procedure change ensures that one train of ND remams in service j and isolated from the train being tested. The train being tested remains isolated from the NC system and is operated recirculating back to the FWST. Operation in these alignments does not create any unreviewed safety question.
IT/2/A/4400/03D Drsenption PT/2/A/4400/03D is the component cooling system flow balance procedure for engineering safeguards and refueling. This change revised the procedure to allow its conduct with only the 2A2 pump. The acceptance criteria for the procedure was also revised to allow for throttling down on KC flow to the ND heat exchanger in order to maintain desired flows on all other essential header components. It has al;o been revised to meet only the acceptance criteria for those components required in Mode 6.
Evaluation Specific limits to KC flow have been incorporated into the procedure to allow the 2A2 KC pump to supply its required loads without experiencing runout, in this configuration and decay heat load, substantial marpa exists in the KC A train heat removal capability. The limits on ND heat exchanger flow are well below the limits prescribed in technical specification bases.
IT/0/A/4400/08A Description PT/0/A/4400/08A is the RN flow balance procedure for Train A. This procedure change reduced the minimum required RN flow from $200 gpm nominal (5279 gpm error adjusted) to 4925 gpm nominal (5000 gpm error adjusted) for the one pump RN flow balance. Difficulty was encountered in achieving the previous flows so the ability of the RN system to perform its safety function was analyzed using the reduced flows so that the units could continue to operate until the cause of the degraded flows could be determined.
Evaluation The RN system was shown to be capable of providing necessary cooling to all required plant equipment during an accident at the reduced flows. The change only changed the acceptance criteria for the test and not any test method or operating practices.
IT/0/A/4400/08A Description '
PT/0/A/4400/08 A is the RN flow balance procedure for Train A. This procedure change allowed for the use of a second R.N pump on Train I A should a second pump be needed or desired.
Evaluation i
i Procedures j Page 18 l l
i i
i
I Ahhough the single pump balance is preferred, it is not beyond 'the design scope of the single failure analysis'to use a second RN pump. Both pumps of the train receive a start signal from a loss of offsite power and/or a safety injection. Balancing the system with two pumps requires full operability of both pumps and their corresponding support flows to ensure train I A is unconditionally operable. No unreviewed safety question existed as a result of this change.
N/0/A/4450/04A Description N/0/A/4450/04A is the auxiliary building filtered exhaust system performance test procedure. This restricted change deleted the minimum flow rate criteria and filter DP acceptance criteria designated for filter DP testing. -;
Testing of I A VA train on 5/1-2/92 did not require the minimum filter testing flow rates or filter DP, as the filter units were not being tested.
Evaluation Although the required flow rate through the filter unit was not met, this flow rate is a test point designed to specify the most limiting flows and loads on the filter unit for testing and does not define a safety parameter. It does define the upper flow limit for the filter unit. He ability of the system to align to the ECCS pump rooms and appropriately heat and filter the air exhausted fro'n these pump rooms was not affected, which is the only ESF function that VA performs. These ESF functions remained in the acceptance criteria and were successfully verified by testing. No credit is taken for VA in the FSAR Chapter 15 dose analysis.
M/1/A/4200/09 Description M/1/A/4200/09 is the engineered safety features actuation periodic test procedure. The change allowed the ESP test to be performed prior to fill and vent of the NC system. He change established several NC level criteria to be used in the test. The level criteria ensure NC level remains above mid-loop and below the bend in the steam generator U-tubes. Also, power is removed from INI9A and INIl0B to ensure no water is injected or gravity fed into the NC system.
Evaluation ne ESF test has been conducted in the past with NC filled and vented because only one train of ND is required with NC filled and vented. With the loops not filled, both trains of ND are required to be operable; however, technical specifications allow one ND loop to be inoperable for up to two hours for surveillance testing. The ND train under test was considered inoperable due to the discharge valve being closed during the test. If the train of ND under test were to have been needed, one additional operator action, opening the valve, would have been needed to return the train to operable status. The test was conducted with the same system lineups as in the past.
M/1/A/4200/09 Description PT/1/A/4200/09 is the engineered safety features actuation periodic test procedure. This change allowed the Train B blackout portion of the procedure to be performed with steam generators at low-low level. It also involved placing a jumper to allow ISA-5 to remain closed with the low-low steam generator signal. His bypassed an SSF interlock which fails ISA-5 open with 2/4 low-low level.
Evaluation During the test, the steam generators are not used for heat removal and neither CA nor the SSF were required. If l
Procedures Page 19
-l l
i I
i CA were reset after the auto-start signal was present, the pump breaker could have been racked in without an auto-start. It would have required the low-low signal to clear and return to provide another auto-start. Reactor trip breakers were not closed for the test and therefore a reactor trip signal was not a concern.
N/1/A/4200/09 Description PT/1/A/4200/09 is the engineered safety features actuation periodic test procedure. He change added several enclosures to retest test components which were: 1) unavailable during the test,2) did not time out during the test, or 3) failed response time during the test (degraded bus voltage time delay).
Evaluation -
The only retests which could significantly affect any systems are those for IRN484A, INI9A, INIl0B, and the .,
retest for the degraded bus voltage time delay. The test for IRN484A had steps to ensure YV was shut down and that NC pumps were off. The tests for IN19A and INIl0B ensured that the NV pumps were off prior to opening the valves. This ensured that water would not be injected into the NC system when the valves were opened. The retest of the degraded bus voltage time delay called for the diesel generator to be started and run by the normal operating procedures. Once the D/G was paralleled by these procedures, the normal incoming breaker was tripped. The D/G continued to supply the loads on IETA. He D/G was then paralleled and shut down. The essential bus was energized at all times. If for any reason the I A essential bus were to have been lost, IETB was unaffected by this test and D/G IB was available to power it if necessary.
N/0/A/4450/08 Descripti.nn '
PT/0/A/4450/08 is the control area ventilation system performance test procedure. This change constituted a -
rewrite of the entire VC test procedure. It incorporated twelve previously approved changes.
Evaluation No unreviewed safety question existed as a result of this procedure rewrite. The VC system remains fully operable during the test and is not operated outside ofits design conditions. Sections of the procedure that require test instrumentation to be installed have removal steps to ensure no instrumentation is left connected to the system. The train of VC being tested remains operable throughout the test and the other train is not affected.
M/0/A/4450/15A Description PT/0/A/4450/15A is the air moisture periodic test procedure for the VI system. His evaluation was performed to ;
determine if any unreviewed safety question was involved with the performance of this procedure.
.]
l Evaluation l
Precautions were included in the procedure to notify the control room operators of alarms that could be actuated 1 during the test. Some valves were opened slightly but VI system pressure was not affected. Only a small amount l
- of air was taken from the system during the test.- This did not change the system in a significant manner. The l only function performed was the taking of air from the system and measurement of dewpoint, i N/0/A/4600/26
- pescrintion 1
I Procedures Page 20 j l
I
'l PT/0/A/4600/26 is the NC temperature calibration procedure. This 10CFR50.59 evaluation was performed in conjunction with the original issue of this procedure. The purpose of this procedure is to calculate full power delta temperature for each NC loop and recalibrate'as necessary, to check NC loop revised Thot average weighting scheme, and to determine overtemperature delta T setpoint channel check criteria and revise as necessary.
Evaluation The procedure ensures that the full power delta T used in the overpower and ove temperature delta T setpoints is accurate. Assumptions used in calculations have negligible or conservative effects on results. The probability and consequences of an accident or equipment malfunction were not increased. The margin to safety was maintained.
Pf/2/A/4700/12 Descrintion PT/2/A/4700/12 is the standby shutdown facility (SSF) control panel functional verification procedure. This 10CFR50.59 evaluation was performed in conjunction with the original issue of this procedure. This procedure is used to verify a position or actually open/close or stop/ start a number of SSF components.
Evaluation All sections of this procedure are performed in a mode of operation where the components being tested, or used in conjunction with the test, are not required to be operable. Additional section requirements specify other conditions necessary to be met or verified that ensure no plant systems or equipment will be jeopardized by the performance of the test. Limits and precautions have been incorporated into the procedure that allow the test to be terminated and equipment returned to a safe functional condition should problems arise during execution of the procedure. Communication is maintained between personnel in the control room, the SSF, and other remote locations during the test. Prior to transfening control to the SSF, procedure steps require a final review of equipment affected by the transfer and possible effects upon current plant conditions. This review ensures that' items such as containment closure, ND pump suction alignments, etc., are maintained in a condition applicable to existing plant configuration requirements.
PT/2/B/4600/07 Description PT/2/B/4600/07 is the loose parts monitor spectrum comparison procedure. This procedure incorporated a number of changes, including change of purpose, addition of references, change of acceptance criteria, rewrite of procedure steps, and modifications to procedure enclosures, i
Evaluation The method of calibration employed in the procedure was discussed with the vendor that provides support for the vibration and loose parts monitoring system. The vendor agreed that this method of calibration is sufficient and meets the requirements of the system. The loose parts monitoring system is not a safety related system. It is not required for mitigation of any accidents described in the FSAR. The only requirement on the system is that it does not degrade physically during a design basis seismic event and affect the operation of any safety related equipment near it. This procedure reissue does not affect the function or physical hardware of the system in any . -
way and does not cause the response of the system to a design basis seismic event to be any different than before.
TN/0/A/0435/00/02A and 03A -
Description
'i 1
I Procedures ~
Page 21 j l
< _ ._.___._________.'1
These two TNs are procedures for the implementation of NSM CN-50435, Rev. O, work units #2 and #3, respectively. This NSM replaced sixteen nuclear service water (RN) system BIF carbon steel butterfly. valves with Fisher stainless steel butterfly valves. The carbon steel valve bodies have experienced significant corrosion, the rubber seats have hardened, and the epoxy seat retainers have failed. Work unit #2 governed the replacement of valves 1RN53B, IRN588,1&2RN848B, and 1&2RN849B. Work unit #3 governed the replacement of valves IRN54A, IRN63A, IRN57A, IRN843B,1&2RN846A and 1&2RN847A.
Eyah!all2D Implementation of this NSM did not create any new failure modes. Adequate reviews were conducted to assure that the SSCs that were assumed to be operable remained operable. Implementation of this NSM could not have made the RN system an accident initiating system. Implementation of this NSM did not degrade the operable train of RN for either train A or B valve replacement evolutions. The site was capable of responding to any design basis accident combination. Implementation of this NSM did not affect the fuel, cladding, reactor coolant pressure boundary, or containment. No assumptions made in any accident analysis were affected by this NSM.
ne RN system's ultimate heat sink safety function was not degraded outside the bounds of the existing technical specifications and accident analysis.
TN/1/A/1280/00/01 A and 02A Description These two TNs are procedures for the implementation of NSM CN-11280, Rev.0, work units 01 and 02, respectively. This NSM revised the logic for the CF and SM isolation indicating lights. This modification will allow indication by an automatic initiation as well as a manual initiation. Previously, isolation indication was received only by manual initiation. 1 Evaluation I The implementation of this procedure took place during a unit outage period and the work was train related. The installation activities in this procedure were performed when the equipment affected by this modification was not required for safe operation of the unit, which was modes 5, 6, and no mode. The elect ical isolations were restored and a post operability review was performed prior to entering mode 4. The modification test plan was completed prior to mode 2.
TN/1/All281/00/03A Descrintion TN/1/A/1281/00/03A is the procedure for implementation of NSM CN-11281, Rev. O, work unit 03. This procedure was written to control the following activities: 1) pull four new cables, 2) install cable supports to accomnxxlate cable pulling, 3) mount terminal boxes ITBOXO627 and ITBOXO628, and 4) install / wire new cables assigned to these terminal boxes.
Evaluatios Implementation of this procedure had no significant effect on any operating system. All firestops opened during cable pulling activities were rescaled by applicable steps specified in the procedure. Electrical tie-ins for circuitry installed in were performed during implementation of procedures TN/1/A/1281/00/05A and TN/1/A/1281/00/06A. This procedure had no effect on the bases of technical specifications. Also, there was no significant effect on the FSAR.
TN/1/All281/00/04A Procedures Page 22
I 1
i i
Description TN/1/A/1281/00/04A is the procedure for implementation of NSM CN-11281, Rev. O, work unit 04. This procedure replaced the existing capillary instrumentation with a GEMS Delaval float type continuous level sensing system. This procedure governed the following activities: 1) install five new level transmitters for train A,2) ~l install five new level transmitters for train B, 3) pull new cables to accomodate wiring of new transmitters, and 4) wire new transmitters and electrical penetrations.
Evaluation his procedure did not interrupt any energized circuit or make any wiring tie-ins to existing circuits or systems.
All firestops opened during implementation of this procedure in order to complete cable pulling activities were closed by this procedure. The primary purpose of this modification was to improve the availability and reliability of the containment water level sensing instrumentation. The new transmitters are QA condition 1 and were mounted per seismic qualifications. Compliance with seismic criteria was not degraded and the new instrumentation is qualified for operation in a pos, t.ccident environment. No changes made by this procedure adversely affected the ability of any system to perform its design ftmetion.
TN/1/A/1281/00/05A and 06A Drenrition TN/1/A/1281/00/05A & 06A are the procedures fcr implementation of NSM CN-ll281, Rev. O, work units 05 and 06, respectively. These procedures provided guidance for the implementation of train B and train A work, ,
respectively and govemed the following activities: 1) remove existing transmitter and related hardware and wiring, 2) replace scale on receiver gauge located on main control board, 3) remove components, remove' and replace fuses, and perform wiring tie-ins for train B and train A circuitry,4) calibrate level transmitters, and 5) conduct leak rate test on penetrations.
Evaluation '
He changes made by these procedures did not adversely affect the ability of any other system to perform its design function. The new level instrumentation installed by these procedures is powered from Class IE busses and mounted per seismic qualifications. He level transmitters are connected to a receiver gauge to a single output. A power supply was removed from existing circuitry, so the loads on affected power supplies will remain within design limits. The main purpose of this modification is to improve the availability and reliability of the containment water level sensing instrumentation. These procedures did not adversely affect any safety limits, setpoints, or operating parameters, so the margin of safety was not reduced.
TN/1/A/1320/00/01 A and 02A Description TN/1/A/1320/00/01 A and 02A are the procedures for implementation of NSM CN-11320, Rev. O, work units 01 and 02, respectively. These procedures provided instruction to replace the relays which detect degraded voltage conditions on the IETA and IETB busses, respectively (EPC system). The existing ITE 27H relays were replaced with more accurate ITE 27N relays. The installation of these relays will decrease the possibility of unnecessary actuations of the degraded voltage protection and provide a greater degree of protection for safety -
selated equipment under degraded voltage conditions.
Evaluation ne implementation of these procedures involved replacement of the three existing ITE 27H relays in IEATC16 and IEATC17 with ITE 27N relays. Circuit paths and functions were not affected. His modification was installed during the 1 A and IB diesel maintenance windows, with Unit 1 in modes 5,6, or no mode. With the 1 A l i Procedures ,
Page 23 !
1
or IB diesel inoperable, the isolation of these relays had no effect on plant conditions or operating status. The activities detailed in these procedures were done when the equipment affected by this modification was not required for safe operation of the unit. There was no negative effect on any safety related system or component, nor was there an increase in the consequences of any accident as evaluated in the FSAR. The installation of the modification did not reduce the margin of safety as defined in the basis of any technical specification. These procedures did not create any unreviewed safety question.
TN/1/A/3727/CE/01 A and 02A Description TN/1/A/3727/CE/01A and 02A are the procedures for implementation of Exempt Change CE-3727, work units 01 and 02, respectively. These procedures added relays as input buffers for valves IRN3A and IRN36A against electrical noise in the cable runs to the nuclear service water intake structure. Induced voltages caused by the ,
length of the surrounding cables were resulting in false signals to the OAC, control room panel lights, and 1.47 Bypass Panel.
Evaluation Although loss of manual control from Unit 1 of valves IRN3A and IRN36A was a result of these procedures, automatic conbol of the valves through both units and manual control of the valves through Unit 2 remained, tnus ensuring operabdity of the valves at all times. The valves were cycled as functional verification tests. Internal wiring changes within IEATC9 resulted in temporary loss of control of opening valve IRN63A. In order for this loss of control not to affect the safa shutdown of the plant, the RN system was switched to the SNSWP.
TN/1/B/1245/00/01A Descrintio_n TN/1/B/1245/00/01 A is the procedure for implementation of NSM CN-ll245, Rev. O, work unit 01. This procedure provided instruction for reassigning the automatie and manual functions of steam generator water sample monitor lEMP34 to condenser air ejection exhaust monitor IEMF33. This procedure also pmvided -
instruction for deleting the steam generator blowdown sample heat exchanger 1 A, IB, IC, and ID flow l transmitters INMFT5460 and INMFT5480 along with their associated transducers INMFE5460, INMFE5470, 1NMFE5480 and INMFE5490.
1 Evaluation j The implementation of this procedure involved removing IEMF34 from service. Technical Specification i 3.3.3.10 requires that this monitor be operable at all times; however, IEMF34 was unable to meet its operability requirements and was listed in the TSAIL. The completion of this procedure cleared one of several TSAIL items that allowed IEMF34 to be removed from the TSAIL. He changes to 1 EMF 33 did not require this monitor to be removed from service; therefore, Technical Specification 3.3.3.11, which states that 1 EMF 33 must be operable in Modes 1, 2, 3, and 4, was not entered.
TN/2/A/0046/MM/01 A and 02A Description TN/2/A/0046/MM/01 A and 02A are the procedures for implementation of minor modification CE-60046, Rev. O, work units 01 and 02, respectively. This modification modified control circuit wiring for valves 2RN028A (work unit 01) and 2RN038B (work unit 02). Rese wiring changes were used to provide independent fusing between the main control room indication and the motor operator valve starter controls for each RN discharge valve.
Procedures Page 24
i l
l Evaluation These changes will result in meeting proper power separation requirements in the event a control room problem may cause a fuse to blow and eliminate power to the RN pump switchgear control interlock used to provide automatic opening of the discharge valve upon starting of the pump. A post modification test was conducted following the work. No unresiewed safety question was determined to exist.
TN/2/A/0300/00/02A and 03A Description TN/2/A/0300/00/02A and 03A are the procedures for the implementation of NSM CN-20300, work units 02 and 03, respectively. This NSM relocated the volumetrics pneumatic module and remoto .ontrol unit outside the personnel air lock and bypass leakage enclosure to an auxiliary building location. This equipment was relocated in order to reduce personnel exposure resulting from testing and maintenance activities and to improve equipment reliability. Work units 02 and 03 pertain to the upper and lower personnel airlocks, respectively.
Evaluation No work associated with these procedures started until Unit 2 was in no mode when the upper and lower PALS and containment isolation valves were not required to be operable. No system was prevented from performing any function important to safety while this work was being performed. Post modification testing activities were identified in these procedures to verify that the modified system functions as designed.
TN/2/A/0397/00/01 A and 02A Description TN/2/A/0397/00/01 A and 02A are procedures for the implementation of NSM CN-20397, Rev. O, work units 01 and 02, respectively. This NSM provided independent IE power sources for both train A and train B related hydraulic isolator alarm iaputs to RVLIS. These inputs were previously powered from the same source. Work unit 01 governed the installation of cable supports and pulling of new cables required for this NSM. Work unit 02 governed the wiring required to implement the nuxlification.
Evaluation During cable pulling, the cables being pulled were not terminated by the procedure. Firestops opened during the pulling of the cables were resealed. Wiring changes were implemented in a mode with the RVLIS system not required and out of service. Wiring was completed prior to NC system fill and vent. No unreviewed ,afety question was generated as a result of the implementation of these procedures.
TN/2/A/0528/00/04A and 05A Description ;
TN/2/A/0528/00/04A and 05A are the procedures for implementation of NSM CN-20528, work units 04 and 05, respectively. This NSM replaced the existing pneumatic devices that provide the non-safety related diesel generator trips with electronic components. It also replaced solenoids used for pneumatic logic control in the ,
diesel engine control panel with electronic devices. A pneumatic operated shatdown solenoid was replaced with :)
an electrically operated solenoid. Work units 04 and 05 governed the work for diesel generator 2A and 2B,
- respectively, j Evaluation These procedures were performed with Unit 2 in nxxles 5,6, or no mode. Work required for these procedures was performed when the diesel generators were inoperable due to maintenance and Unit 2 was aligned in Procedttres i Page25 1
I l
l accordance with Technical Specification 3.8.1.2. This NSM affected only non-safety related diesel generator trips. Safety selated trips were not affected. His NSM did not change the existing control logic for the diesel generators.
TN/2/A/0602/00/01A Descrintion TN/2/A/0602/00/01 A is the procedure for implementation of NSM CN-2%02, Rev. 0 (installation of atmospheric vent to reactor vessel head), work unit 01. Previously, the draining of the NC system following unit shutdown required the opening of reactor head vent isolation valves. Since these valves have proven to be unreliable, in order to verify proper draining of the reactor vessel head, the reactor vessel level indication system (RVLIS) was employed. The use of the RVLIS path to verify and subsequently aid in draindown was determined unacceptable and a dedicated vent path was determined to be required. This NSM installed a reactor head vent to >
aid in draindown.
Evaluation Piping attached to the reactor vessel head is QA 1 Class A. During implementation of this procedure, Unit 2 remained in mode 6 or no mode. Reactor vessel integri:y was assured to be restored by NDE testing of all welds and hydrostatic testing ofinstalled piping.
TN/2/A/0638/00/01A Description l TN/2/A/0638/00/01A is the procedure for implementation of NSM CN-20638, Rev. O, work unit 01. This procedure provided instruction for replacing the existing AirPax overspeed monitor for the Unit 2 auxiliary l feedwater turbine driven pump (CAPT). The AirPax monitor was replaced with a Dynalco SST 2400 speed switch, along with a Dynalco SDC 2000 power supply converter to provide the necessary power input. In j addition, several new loop numbers were provided for various CAPT monitoring functions.
Evaluation The new monitor and its power supply are qualified for use in the CA system as QA Condition I devices. This i procedure was completed during modes 5,6, or no mode, with the CAPT out of service. Implementation of this ;
procedure did not result in an unreviewed safety question.
TN/2/A/0647/00/01 A and 02A l
Description TN/2/A/0647/00/01 A and 02A are the procedures for implementation of NSM CN-20647, Rev. O, work units I A q and 2A, respectively. This modification isolated the NR system (boron thermal regeneration) and made it I inoperable. The NR system was not used by Operations to control boron level for several years. His modification deleted power and control circuitry, as well as instrument air, from the NR system. Work unit I A implemented the non-outage portion of the modification, while work unit 2A implemented the outage portion.
l Evaluation ,
All components affected by electrical and instrumentation isolation for these procedures were evaluated and .l determined to have no adverse effects on the operation of the plant. No unreviewed safety question was created as ;
a result of the implementation of these procedures. !
TN/2/A/0664/00/01 A thinugh 22A i i
i Procedures Page 26
- ~
i Desenption TN/2/A/0664/00/01 A through 22A are the procedures for implementation of NSM CN-20664. Rev. O, work units 01 through 22, respectively. This NSM modified control circuit wiring on a number of valves to provide ' limit actuated" torque switch bypass contacts which can be adjusted independently of indications or interlocks and provided data to complete MOV testing of the valves. The MOV testing information included in the NSM supersedal the old torque switch setting values and replaced them with thrust values. The settings were selected, set, and will be maintained correctly to accomaxxlate the maximum differential pressure expected on the valves during both normal and abnormal events within the design bases. The new thrust values ensure the valves will operate during normal and abnormal events by setting limitations on total thrust, delta p thmst, and packing load.
Work units 01 through 22 are applicable to the following valves, respectively:
'2FWO01 A (refueling water loop isolation valve) 2FWO32B (refueling water loop isolation valve) 2KC050A (train 2A supply to auxiliary building non-essential header isolation valve) 2KC053B (train 2B supply to auxiliary building non-essential header isolation valve) 2ND032A (ND train 2A hot leg injection isolation valve) 2ND065B (ND train 2B hot leg injection isolation valve) 2N1054A (safety injection system accumulator 2A discharge isolation valve) 2N1065B (safety injection system accumulator 2B discharge isolation valve) 2N1076A (safety injection system accumulator 2C discharge isolation valve) 2N1088B (safety injection system accumulator 2D discharge isolation valve) 2RN404B (upper containment vent units supply containment isolation valve) 2WL867A (liquid waste recycle system vent unit condensate drain tank containment isolation inside valve) 2WL869B (liquid waste recycle system vent unit condensate drain tank containment isolation outside valve) ;
2RN144A (NS heat exchanger A inlet isolation valve) l 2RN148A (NS heat exchanger A outlet isolation valve) 2RN225B (NS heat exchanger B inlet isolation valve) 2RN229B (NS heat exchanger B outlet isolation valve) 2RN287A (KC heat exchanger A inlet isolation valv?)
2RN347B (KC heat exchanger B inlet isolation valve) i 2RN437B (lower containment vent units supply containment isolation outside valve) j 2RN484A (lower containment vent units return containment isolation inside valve) !
2RN4878 (lower containment vent units retum containment isolation outside valve) !
Evaluation During the implementation of all work units above, prior to returning the respective valve to service, a functional verification was performed to verify valve operability. No unreviewed safety question was generated as a result of the implementation of the work units described. l TN/2/A/0676/00/03A Desenption TN/2/A/0676/00/03A is the procedure for implementation of NSM CN-20676, Rev. O, work uait 03. This NSM replaced the existing Barton filled capillary system used to monitor containment sump level with GEMS float type level instrumentation. This procedure installed cable supports, pulled cables, and installed terminal boxes and associated wiring required for this NSM.
Procedures Page 27
= + - - '
Evaluation All firestops opened during cable pulling activities were resealed by applicable steps specified in this procedure.
Implementation of this procedure had no significant effect on any operating system. No unreviewed safety question was caused by the implementation of this procedure.
PF/2/A/4200/1311 Description PT/2/A/4200/13II is the NI and NV check valve movement test procedure. This change constituted a rewrite of the procedure. The major change to the procedure was the development of new acceptance criteria.
Evaluation No unreviewed safety question was generated as a result of this procedure change. His procedure is performed in no-mode conditions with the reactor vessel open. ECCS systems are not required during the performance of this procedure. His test ensures that technical specification surveillance requirements are satisfied for the ECCS and that the system will be able to meet its design safety function when required during accident conditions.
FT/2/A/4350/02E Description PT/2/A/4350/02E is the CA, CF, and turbine interlocks periodic test. This change constituted a procedure retype that incorporated a number of changes. These included the following:
Added standing work request number for IAE support Added an engineered safety features actuation periodic test as a prerequisite test Added option to enclosure for CAPT #2 autostart on train blackout signal to allow response time to be calculated using previously obtained response times Added steps to the motor-driven CA pump autostart sections to require motor-breaker for the pump being tested to be racked in-open as a prerequisite Added steps to all sections with specific SSPS requirements to ensure control room SRO is notified when certain SSPS conditions are no longer required by this procedure Added steps to CF isolation and CA pump autostart sections to ensure that an inadvertent main turbine trip does not occur upon initiation of a loss of both CFPT signal Deleted steps associated with opening CFP discharge valves and verifying they close on a CF isolation on hi-hi doghouse level Implemented changes associated with valve alignments for eacg main turbine trip section Changed designation for Independent Verification from IV to DV (Double Verification)
Added various caution statements and notes, as well as made terminology changes Altered order which links are restored in AMSAC section Added substeps to AMSAC section to require CA pump autostart defeat to be instated after resetting CA Added enclosure to be completed as a prerequisite to both CF isolation sections which will identify problems with CF isolation valves prior to beginning either CF isolation section Evaluation No changes associated with this retype require any equipment to be operated outside its normal design limits. The CAPT autostarts are the only system responses tested during a mode which they are required. During these sections, the required number of motor-driven CA pumps remain available. No unreviewed safety question was generated as a result of this procedure retyle.
Procedurcs Page 28
M/1/A/4200/13E Description PT/1/A/4200/13E is the CA valve inservice test procedure. This change increased the allowed stroke time of valves ICA149, ICA150, ICA151, and ICA152 from < /= 5 seconds to </= 10 seconds. This ensures that the stroke time requirement for these valves is consistent with those given in technical specifications.
Evaluation Since the stroke time requirements of the subject valves are being updated to ensure consistency with technical specifications, the new stroke times remain within the limits established by the design basis analysis. No safety margin is reduced as a result of this procedure change.
M/2/A/4200/13E Description PT/2/A/4200/13E is the CA valve inservice test procedure. This change increased the allowed stroke time of valves 2CA185,2CA186,2CA187, and 2CA188 from </= 5 seconds to </= 10 seconds. This ensures that the stroke time requirement for these valves is consistent with those given in technical specifications.
Evaluation Since the stroke time requirements of the subject valves are being updated to ensure consistency with technical specifications, the new stroke times remain within the limits established by the design basis analysis. No safety margin is reduced as a result of this procedure change.
M/2/A/4200/13K Descrintion N/2/A/4200/13K is the CA valve inservice test procedure. This change increased the allowed stroke time of valves 2CA149,2CA150,2CA151, and 2CA152 from </= 5 seconds to < /= 10 seconds. This ensures that the stroke time requirement for these valves is consistent with those given in technical specifications.
Evaluation Since the stroke time requirements of the subject valves are being updated to ensure consistency with technical specifications, the new stroke times remain within the limits established by the design basis analysis. No safety margin is reduced as a result of this procedure change.
M/1/A/4200/13E Description N/1/A/4200/13E is the CA valve inservice test procedure. This change increased the allowed stroke time of valves ICA185, ICA186, ICA187, and ICA188 from < /= 5 seconds to < /= 10 seconds. This ensures that the stroke time requirement for these valves is consistent with those given in technical specifications.
Evaluation Since the stroke time requirements of the subject valves are being updated to ensure consistency with technical specifications, the new stroke times remain within the limits established by the design basis analysis. No safety margin is reduced as a result of this procedure change, kevin ,
1 l
l l
Procedures j Page 29 1 1
1 I
I I l
1 TN/2/A/0676/00/04A Description This procedure implements Train A work for NSM CN-20676. He purpose of this modification is to improve ,
the availability and reliability of the Containment Water Level sensing instrumentation. This procedure provides guidance for the removal of an existing transmitter and associated hardware, and the rewiring and calibration of several level transmitters.
Evaluation Implementation of this procedure does not adversely affect the ability of any other system to perform its design function. This modification improves the availability and reliability of the Containment Water Level sensing instrumentation. All loads on affected power supplies remain within design limits. This procedure does not adversely affect any safety limits, setpoints, or operating parameters. As a result, the margin of safety as defined in the bases of the Technical Specifications is not reduced. Therefore, the implementation of this procedure does not represent an unreviewed safety question.
TN/2/A/0676/00/05A Descrintion This procedure implements Train B work for NSM CN-20676. The purpose of this modification is to improve the availability and reliability of the Containment Water Level sensing instrumentation. This procedure provides guidance for the removal of an existing transmitter and associated hardware, and the rewiring and calibration of several level transmitters. ,
Evaluation Implementation of this procedure does not adversely affect the ability of any other system to perform its design function. His modification improves the availability and reliability of the Containment Water Level sensing instrumentation. All loads on affected power supplies remain within design limits. This procedure does not adversely affect any safety limits, setpoints, or operating parameters. As a result, the margin of safety as defined in the bases of the Technical Specifications is not reduced. Therefore, the implementation of this procedure does not represent an unreviewed safety question.
TN/2/A/0676/00/06A Description This prcredure provides guidance for the implementation of NSM-20676. This procedure replaces the existing capillary instrumentation with a GEMS Delaval float type continuous level sensing system and installs 10 new level transmitters and associated wiring.
Evaluation This modification improves the availability and reliability of the Containment Water Level sensing instrumentation. This procedure does not interrupt any energized circuit or make any wiring tie-ins to existing circuits or systems. The new transmitters being installed are QA Condition I and are be mounted per seismic qualifications. The new instrumentation is qualified for operation in a post accident environment. No changes i
1 Procedtires Page 30 l
l
made by this procedure adversely affect the ability of any system to perform its design function. Therefore, the implementation of this procedure does not represent an unreviewed safety question.
TN/2/A/1320/00/01A Descrintion This procedure provides instructions to replace the existing relays which detect degraded voltage conditions on the Unit 2 EPC bus with high accuracy ITE 27N relays in the Train A control circuits. These changes are being implemented under NSM-21320.
Evaluation The installation of these relays deen:ase the possibility of unnecessary actuations of the degra'ded voltage protection and provide a greater degree of protection for safety related equipment under degraded voltage conditions. Circuit paths and functions are not affected by this replacement. The isolation of these relays occurred when the 2A Diesel Generator was inoperable and had no effect on plant conditions or operating status.
There is no negative affect on any safety related system or component. The installation of the modification does not reduce the margin of safety as defined in the basis of any Technical Specification. Therefore, the implementation of this procedure does not represent an unreviewed safety question.
TN/2/A/1320/00/02A Descrintioji t
This procedure provides instructions to replace the existing relays which detect degraded voltage conditions on the Unit 2 EPC bus with high accuracy ITE 27N relays in the Train B control circuits. These changes are being implemented under NSM-21320.
Evaluation The installation of these relays decrease the possibility of unnecessary actuations of the degraded voltage protection and provide a greater degree of protection for safety related equipment under degraded voltage conditions. Circuit paths and functions are not affected by this replacement. The isolation of these relays occurred when the 2B Diesel Generator was inoperable and had no effect on plant conditions or operating status.
There are no negative affect on any safety related system or component. The installation of the modification does not reduce the margin of safety as defined in the basis of any technical specification. Therefore, the implementation of this procedure does not represent an unreviewed safety question.
TN/2/A/3588/CE/01A Description This procedure provides instructions to remove the doghouse level interlocks to the Main Feedwater Pump Discharge Isolation Valves 2CF-10 and 2CF-17. These changes are being implemented under exempt change CE-3588.
1 Evaluation -
Deleting the signals from these valves helps prevent unnecessary wear that could cause premature failures and l
increased maintenance on these valves and their actuators and reduce the severity of feedwater system transients j caused by a high-high doghouse level signal. This work occurred on Unit 2 during Mode 5,6 and No Mode. All Procedures Page 31 i l
I
l l
l l
1 components affected by electrical isolations for this procedure were evaluated and determined to have no impact on the safe operation of Unit 2 in Modes 5, 6, and No Mode. Appropriate testing was performed after implementation of this modification to ensure proper operation of equipment prior to the required modes of operation. This change does not create a reduction in the margin of safety as defined in any Technical Specification. Therefore, the implementation of this procedure does not represent an unreviewed safety question.
TN/2/B/0635/00/01A Descriotion This procedure provides instruction for reassigning the automatic and manual functions of Steam Generator Water Sample Monitor 2 EMF 34 to Condenser Air Ejection Exhaust Monitor 2 EMF 33. These changes are being implemented under NSM CN-20635.
Evahiation The requirements for EMF-34 were removed from the Technical Specifications (T/S) and placed in the Selected 1 Licensee Commitments (SLCs) under T/S Amendments 103/97. A subsequent SLC change deleted the requirement for EMF-34. This procedure does not require the removal of EMF-33 from service and does not affect its ability to perform its intended functions. EMF-33 is fully capable of performing the additional actions previously assigned to EMF-34. This change does not create a reduction in the margin of safety as defined in any ,
Technical Specification. Therefore, the implementation of this procedure does not represent an unreviewed safety question.
. TN/5/A/0078/00/01 A Dewrintion This procedure installs a Train A " sequencer signal control circuit" switch on the main control board, deletes Train A VC/YC temperature switches and associated annunciators, and downgrades the Train A Chilled Water Pump differential pressure switch from safety to non-safety. These changes are being implemented under NSM '
CN-50078.
Evaluation The implementation of these changes improve the reliability of the VC/YC Systems, simplify maintenance, and reduce the possibility of radiation exposure. Work on Train A of VC/YC was performed when the system was properly removed from service in accordance with the Technical Specifications. All equipment affected by this procedure and the design intent of this modification were completely tested. Implementation of these changes do -
not create a reduction in the margin of safety as defined in 'any Technical Specification. Therefore, the implementation of this procedure does not represent an unreviewed safety question.
TN/5/A/0078/00/02A Description This procedure installs a Train B " sequencer signal control circuit" switch on the main control board, deletes Train B VC/YC temperature switches and associated annunciators, and downgrades the Train B Chilled Water Pump differential pressure switch from safety to non-safety. These changes are being implemented under NSM CN-59078.
Procedures Page 32
Evaluation The implementation of these changes improve the reliability of the VC/YC Systems, simplify maintenance, and l reduce the possibility of radiation exposure. Work on Train B of VC/YC was performed when the system was properly removed from service in accordance with the Technical Specifications. All equipment affected by this l procedure and the design intent of this modification were completely tested. Implementation of these changes do not create a reduction in the margin of safety as defined in any Technical Specification. Therefore, the implementation of this procedure does not represent an unreviewed safety question.
TN/5/A/0078/00/03A Description This procedure removes VC/YC temperature switches and the annunciators / indications associated with these switches and rewires the pressure switch associated with the Control Room Area Chilled Water Pump Motor as a non-safety instrument. These changes are being implemented under NSM CN-50078. ~l Evaluation This procedure does not affect systems or components addressed in the FSAR in a significant manner. This procedure deletes equipment that has already been removed from service under a separate procedure and makes wiring revisions in the A Train Switchgear Room AHU control circuitry. All equipment affected by this procedure and the design intent of this modification were completely tested. Implementation of these changes do not create a reduction in the margin of safety as defined in any Technical Specification. Therefore, the implementation of this procedure does not represent an unreviewed safety question.
l TN/5/A/0078/00/04A I Description This procedure removes VC/YC temperature switches and the annunciators / indications associated with these switches and rewires the pressure switch associated with the Control Room Area Chilled Water Pump Motor as a i non-safety instrument. These changes are being implemented under NSM CN-50078.
)
'I Evaluation ;)
This procedure does not affect systems or components addressed in the FSAR in a significant manner. This procedure deletes equipment that has already been removed from service under a separate procedure and makes wiring revisions in the B Train Switchgear Room AHU control circuitry. All equipment affected by this procedure and the design intent of this modification were completely tested. Implementation of these changes do .!
not create a reduction in the margin of safety as defined in any Technical Specification. Therefore, the implementation of this procedure does not represent an unreviewed safety question. -j TN/5/B/0403/00/01A Description This procedure modifies the plant Public Address System to allow paging capability from the emergency coordinators desk in the TSC to several locations within the plant. These changes are being implemented unde-r'- )
NSM CN-50403. -l Evaluation J
Procedures j Page 33 i
i All wiring modifications specified by this NSM are non-safety. Equipment mounted per this NSM is non-safety and does not require a seismic analysis, as installation is not within buildings required for safety related functions. j Any wall penetrations opened during cable pulling activities were sealed prior to completion of this procedure. :
These changes do not affect any safety related equipment and do not the reduce the margin of safety in any .l Technical Specification. Therefore, the implementation of this procedure does not represent an unreviewed safety l question.
TN/5/B/0437/06/01A ,
i Description This procedure replaces the carbon vane sample pump / motor on radiation monitor 1 EMF-35/36/37 with a diaphragm sample pump / motor. This pump / motor is being replaced due to the rapid wear of the carbon vanes which are currently installed. This change is being implemented under NSM CN-5G437.
Evaluation i This change improves the ability of this sample pump to perform its intended function. No fire boundaries were breached during implementation of this modification. All applicable Technical Specification action statements were followed when this system was removed from service. All components affected by electrical isolations were evaluated and it was determined that this activity had no effect on the safe operation of Unit 1. This change does not reduce the margin of safety in any Technical Specification. Therefore, the implementation of this procedure does not represent an unreviewed safety question.
TN/5/B/0437/00/02A Description This procedure replaces the carbon vane sample pump / motor on radiation monitor 2 EMF-38/39/40 with a diaphragm sample pump / motor. This pump / motor is being replaced due to the rapid wear of the carbon vanes which are currently installed. This change is being implemented under NSM CN-50437.
Evaluation his change improves the ability of this sample pump to perform its intended function. No fire boundaries were breached during implementation of this modification. All applicable Technical Specification action statements were followed when this system was removed from service. All components affected by electrical isolations were evaluated and it was determined that this activity had no effect on the safe operation of Unit 2. His change does not reduce the margin of safety in any Technical Specification. Therefore, the implementation of this procedure does not represent an unreviewed safety question.
TN/5/B/0437/00/03A Description This procedure replaces the carbon vane sample pump / motor on radiation monitor IEMF-38/39/40 with a diaphragm sample pump / motor. This pump / motor is being replaced due to the rapid wear of the carbon vanes which are currently installed. This change is being implemented under NSM CN-50437.
Evakeliell This caange improves the ability of this sample pump to perform its intended function. No fire boundaries were i
Procedures 1 1
Page 34 '
4
1 l
l breached during implementation of this modification. All applicable Technical Specification action statements were followed when this system was removed from service. All components affected by electrical isolations were evaluated and it was determined that this activity had no effect on the safe operation of Unit 1. This change does not reduce the margin of safety in any Technical Specification. Therefore, the implementation of this procedure does not represent an unreviewed safety question.
TN/5/II/0437/04A Description This procedure replaces the carbon vane sample pump / motor on radiation monitor 2 EMF-35/36/37 with a diaphragm sample pump / motor. This pump / motor is being replaced due to the rapid wear of the carbon vanes which are currently installed. This change is being implemented under NSM CN-50437.
Evaluation This change improves the ability of this sample pump to perform its intended function. No fire boundaries were breached during implementation of this modification. .All applicable Technical Specification action statements were followed when this system was removed from service. All components affected by electrical isolations were evaluated and it was determined that this activity had no effect on the safe operation of Unit 2. This change does not reduce the margin of safety in any Technical Specification. Therefore, the implementation of this procedure does not represent an unreviewed safety question.
TN/5/B/0437/00/05A Description !
This procedure replaces the carbon vane sar.yle pump / motor on radiation monitor EMF-43A with a diaphragm sample pump / motor. This pump / motor is being replaced due to the rapid wear of the carbon vanes which are currently installed. This change is being implemented under NSM CN SM37.
Evaluation This change improves the ability of this sample pump to perform its intended function. No fire boundaries were breached during implementation of this modification. All applicable Technical Specification action statements were followed when this system was removed from service. All components affected by electrical isolations were evaluated and it was determined that this activity had no effect on the safe operation of the station. This change does not reduce the margin of safety in any Tochnical Specification. Therefore, the implementation of this procedure does not represent an unreviewed safety question.
TN/5/B/0437/00/06A Description This procedure replaces the carbon vane sample pump / motor on radiation monitor IEMF-42 with a diaphragm sample pump / motor. This pump / motor is being replaced due to the rapid wear of the carbon vanes which are currently installed. This change is being implemented under NSM CN-5M37.
Evaluation This change improves the ability of this sample pump to perform its intended function. No fire boundaries were breached during implementation of this modification. All applicable Technical Specification action statements Procedures Page 35 a
were followed when this system was removed from service. All components affected by electrical isolations were evaluated and it was determined that this activity had no effect on the safe operation of Unit 1. This change does not reduce the margin of safety in any Technical Specification. Therefore, the implementation of this procedure does not represent an unreviewed safety question.
TN/5/B/0437/00/07A Description This procedure replaces the carbon vane sample pump / motor on radiation monitor EMF-43B with a diaphragm sample pump / motor. This pump / motor is being replaced due to the rapid wear of the ctrbon vanes which ar-currently installed. This change is being implemented under NSM CN-50437.
Evaluation This change improves the ability of this sample pump to perform its intended function. No fire boundaries were breached during implementation of this modification. All applicable Technical Specification action statements were followed when this system was removed from service. All components affected by electrical isolations were evaluated and it was determined that this activity had no effect on ;he safe operation of the station. This change does not reduce the margin of safety in any Technical Specification. Therefore, the implementation of this procedure does not represent an unreviewed safety question.
TN/5/B/0437/00/08A Descrintion -
This procedure replaces the carbon vane sample pump / motor on radiation monitor 2 EMF-42 with a diaphragm sample pump / motor. This pump / motor is being replaced due to the rapid wear of the carbon vanes which are currently installed. This change is being implemented under NSM CN-50437.
Evaluation This change improves the ability of this sample pump to perform its intended function. No fire boundaries were .
breached during implementation of this modification. All applicable Technical Specification action statements were followed when this system was removed from service. All components affected by electrical isolations were evaluated and it was determined that this activity had no effect on the safe operation of Unit 2. This change does not reduce the margin of safety in any Technical Specification. Therefore, the implementation of this procedure does not represent an unreviewed safety question.
TT/0/A/9100/58 Descrintion This test procedure verifies that all A Train circuits nxxlified under NSM CN-50078 have been properly wired.
This test procedure has three parts. Part one verifies the non-selected train LOCA signal. Part two starts the modified train with the key switch in the control room and verifies the proper operation of selected equipment.
Part three verifies the selected train LOCA signal.
Evaluation The probability of an accident, either previously ovahiated or different, is not increased by this procedure since the VC/YC System is not an accident initiator and the system is not operated outside of its design conditions. -The 1
l Procedures 1 I
Page 36 1
t consequences of an accident, either previously evaluated or different is not increased since the VC/YC System remains fully operable during the test and it is not operated outside of its design conditions. Steps in the procedure that installjumpers or slide links have double verifications to ensure that the modifications are removed or placed in the normal operating alignment. Since both trains of VC/YC remain fully operable throughout this test, the margin of safety as defined in the bases of the TeUnical Specifications is not reduced. Therefore, the implementation of this procedure does not represent an unreviewed safety question.
P
'IT/0/A/9100/58, Change #3 Descriotion This test procedure change verifies that all B Train circuits modified under NSM CN-50078 have been properly wired. This test procedure has three parts. Part one verifies the non-selected train LOCA signal. Part two starts the modified train with the key switch in the control room and verifies the proper operation of selected equipment.
Part three verifies the selected train LOCA signal.
Evaluation The probability of an accident, either previously evaluated or different, is not increased by this procedure since j the VC/YC System is not an accident initiator and the system is not operated outside of its design conditions. The consequences of an accident, either previously evaluated or different is not increased since the VC/YC System remains fully operable during the test and it is not operated outside of its design conditions. Steps in the procedure that install jumpers or slide links have double verifications to ensure that the axxiifications are removed or placed in the normal operating aligmnent. Since both trains of VC/YC remain fully operable throughout this test, the margin of safety as defined in the bases of the Technical Specifications is not reduced. Therefore, the implementation of this procedure does not represent an unreviewed safety question.
TT/0/A/9100/60 pescrintion This test procedure verifies that the Auxiliary Building Ventilation (VA) System is capable of meeting its design -
functions under two abnormal alignments - one with the unfiltered exhaust fans operating and another with the supply units operating. This test was written to respond to PIP #0-C93-0160. ]
1 Evaluatieu The probability of an accident, either previously evaluated or different, is not increased by this procedure since 3 the VA System is not an accident initiator and nxxiifying its operation as described in this test procedure does not make it an accident initiator. This procedure provides adequate guidance to ensure the VA System is placed in its safety alignment upon receipt of a safety injection signal on either unit. With the VA System in its safety alignment, control room pressurization is maintained and offsite and control room operator doses are kept below 10CFR100 limits. This test does not adversely affect the safety related portions of the VA System. The margin of safety as defined in the bases for any Technical Specification is not be reduced. - Therefore, the implementation !
of this procedure does not represent an unreviewed safety question.
TT/1/A/4450/18 Description This procedure tests the l A Diesel Generator Building Ven'ilation fans by reversing the positions o'f the outside -
l Procedures l Page 37 l 1
1
l l
air intake and the inside air recirculation dampers from their normal alignments. This test is performed to collect temperature data for application to operability evaluations.
Evaluation Diesel building room temperature is monitored on a regular basis throughout this test to ensure no operability concem associated with low temperature occurs. The circuits that control Emergency Diesel Generator Ventilation operation during a Diesel generator start are not altered. All equipment that is manipulated is non-safety and close surveillance is in place to monitor the effects of the modification. The margin of safety as defined in the bases for any Technical Specification is not be reduced. Therefore, the implementation of this procedure does not represent an unreviewed safety question.
TT/1/A/4450/18, Change #1 Descrintion This precedure change tests the iB Diesel Generator Building Ventilation fans by reversing the positions of the-outside air intake and the inside air recirculation dampers from their normal alignments. His test is performed to collect temperature data for application to operability evaluations.
Evaluation Diesel building room temperature is monitored on a regular basis throughout this test to ensure no operability concem associated with low temperature occurs. The circuits that control Emergency Diesel Generator Ventilation operation during a Diesel generator start are not altered. All equipment that is manipulated is non- ,
safety and close surveillance is in place to monitor the effects of the modification. The margin of safety as
- defined in the bases for any Technical Specification is not be reduced. Therefore, the implementation of this procedure does not represent an unreviewed safety question.
TT/2/A/9200/69 Description This procedure was written as a retest for exempt change CE-2487. This modification wired the normally closed contact on relay "GC" in the trip circuit of 2 ETA 2 and 2ETB2 in parallel with the manual trip switch. The contacts are now in series with the sequencer actuation contacts. This modification was done to ensure that a
" relay race" does not prevent 2 ETA (B)2 from closing on a blackout if the set of contacts in the trip circuit show >
2FTA(B)1 is open.
Evaluation Breaker 2 ETA (B)2 is racked to the test position during the test. The 4160VAC Blackout Bus is energized through 2GTA(B) during this test and is not required to mitigate any accident. The Unit 2 sequencer is in the test mode during this test. This prevents the actuation of VC/YC on a Unit I sequencer actuation, and prevents the starting of RN Pump 2A on a Unit I sequencer actuation or a Low Pit Level swapover to the Standby Nuclear Service Water Pond (SNSWP). Appropriate action statements are entered as a result of these equipment inoperabilities.
In the event of a Unit 2 4160VAC essential bus blackout or LOCA, the sequencer automatically comes out of the test mode. The margin of safety as defined in the bases for any Technical Specification is not be reduced.
Therefore, the implementation of this procedure does not represent an unreviewed safety question.
TT/2/A/9200/070 Procedures Page 38 l
- - - . - . ~ - -
I i
l l
Description This procedure implements a one-time test to evaluate the practicability of drawing a vacuum in the 2D steam generator. His test is needed for the planned cleaning of the Unit 2 steam generators during the Unit 2 End-of.
Cycle 6 refueling outage. The only physical interfaces with the plant's piping systems are the connection of the following: 1) a vacuum hose to 2D BW Pump suction line drain,2) a vacuum hose to the 2D MSIV inlet drain, and 3) a cooling water hose to a YM connection. Water discharged by the pump enters a doghouse floor drain and is routed to the WL System.
Evaluation The physical connections given above do not affect any structure system or component currently addressed in the -
Technical Specifications or the FSAR. All instrument loops that are exposed to a vacuum were reviewed and those that cannot withstand a vacuum are isolated. His test is performed during No-Mode. No secondary side heat sink or steam generator component is required to perform any safety function ia this condition. All steam ,
generator components are operatu! in accordance with design limits and general operating procedures. The l margin of safety as defined in the basis of the Technical Specifications is not reduced. Therefore, the implementation of this procedure does not represent an unreviewed safety question. l l
TT/1/A/9200/072 Description This procedure provides guidance on determining the minimum pick up voltage for the motor starter coil on IRN-57A to ensure that the valve closes under a degraded bus voltage condition. This valve is inoperable during this test and requires the Nuclear Service Water (RN) System to be removed from its normal system alignment.
Evaluation his test requires the RN System to be aligned to the Standby Nuclear Service Water Pond (SNSWP). All j Technical Specification requirements for the RN System are met during this test. Maximum voltage is not i exceeded and no other components in the valve circuit is affected. System functions as described in the FSAR are not affected. No operating parameters, safety limits, or setpoints are being changed. The margin of safety as defined in the basis of the Technical Specifications is not reduced. Therefore, the implementation of this procedure does not represent an unreviewed safety question.
TT/2/A/9200/73 Description his procedure is used to set up and record various 4160VAC essential pump motor and emergency diesel generator parameters to validate the Catawba computer model (CYME). This pmgram is used to update the computer simulation for auxiliary power systems response to system transients, transfers, operational low voltages, and fault conditions. The test involves a test run of the Diesel Generator on an isolated bus with subsequent numual loading with essential equipment.
Evaluation ne Unit 2 B Train emergency diesel generator in inoperable for this test and the appropriate Technical Specification Action Statements are followed. The Diesel generator is operated in accordance with applicable operating procedures. System functions as described in the FSAR are not affected. No operating parsneters, safety limits, or setpoints are being changed. The margin of safety as defined in the basis of the Technical-Specifications is not reduced. Therefore, the implementation of this procedure does not represent an unreviewed Procedures Page 39
safety question.
TT/2/A/9200/74 Description This procedure operates the 2B Diesel Generator on an isolated bus and then provides several step load increases and decreases so that data can be obtained to validate computer code models of CNS Diesel Generator kmds.
Evaluation All pumps are being operated in either their normal operating alignment or in a test alignment which is used in other tests such as IWP tests. Starting the pumps while the Diesel Generator is on an isolated bus is no different than the loading the D/G sees during a sequencer actuation. The pumps and the D/G are operated in a configuration whid are common to other procedures. This test has no effect on the ability of the 2A D/G to supply essential power to train A should the 2B D/G be unable to supply its loads. The margin of safety as defined in the basis of the Technical Specifications is not reduced. Therefore, the implementation of this procedure does not represent an unreviewed safety question.
Procedures Page 40
l SUt1 MARY OF NUCLEAR STATION MODIFICATION RELATED 10 CFR 50.59 EVALUATIONS Note: The first number designates the unit on which the nulification was performed (i.e. CN-1#### indicates Unit 1, CN-2#### indicates Unit 2 CN-5#### indicates that it is shared for both units).
CN 10632
])perintion Rerouting the ice condenser floor cooling supply lines to provide the ice condenser floor with colder glycol then it presently receives. This un! is attempting to reduce the temperature difference that exists between the air temperature in the lower part of the ice condenser and the average ice bed temperature. His temperature difference induces air circulation which in turn increases the rate of ice sublimation.
Evaluation These mcxlifications will have no impact on the consequences of accidents since the equipment being mcxlified does no serve to mitigate directly the consequence of sny accident and since the ice condenser ability to function is not adversely affected. The probability of any accident is not increased since no system is adversely affected and since the system being modified cannot serve to initiate an accident. The probability and consequence of any malfunction of equipment important to safety or any accident previously evaluated in the SAR will not be increased, since the floor cooling system iw not related to safety and since no system is adversely affected by these modifications. This mod will not create the possibility of a new accident or new malfunction of uluipment important to safety because the revision to the floor cooling system was designed to the appropriate design considerations as the current floor cooling system. No setpoints or safety limits are affected. In addition, reduction in the glycol temperature to the floor cooling will not affect any of the margin of safety defined in the Tech Specs, therefore the margin of safety will not be reduced. There are no unreviewed safety questions.
CN - 10758 Description Upgrade the existing recirculation filtering system that services the diesel generator engine fuel oil storage tanks.
This upgraded filtration system will be a vendor supplied unit comprised of a clay polisher with a filter on its upstream and downstream side and a high capacity pump, nis package will connect to the existing flanged suction and discharge piping of the presently installed recirculation pump. All instrumentation, controls, isolation and bypass valves and test line connections will be included. The existing recirculation filter will be removed and replaced with a cappal piping T and used as the new addition point for ailing required chemicals to the stored fuel oil, i
Evaluatmn 1 The nn! is located in the yard and is non-safety related. The modified portion of the system is isolated from the safety related portion by Class C normally closed valves and check valves. The new pump is shutdown by the safety related redundant interlocks. The new system will function more ef ficiently and provide cleaner oil to the ,
Diesel Generator Engine so there is no increase in the probability of a malfunction of equipment important to j safety evaluated in the SAR. The nn! will not adversely affect any safety related system or increase the probability of an accident evaluated in the SAR. There is no increase in the consequences of an accident or of a -
malfunction of equipment important to the safety evaluated in the .W. No safety parameters or design limits have been adversely affected, no margin of safety as defined m the bases to a Tech Specs is reduced. There are no --
unreviewed safety questions associated with this NSM.
Modifications Page1 i
CN-10976 DrEnntion To facilitate normal maintenance and emergency operations which may be required in the doghouse, this mod will add normal AC, emergency AC and emergency DC general area lighting and AC receptacles to the inboard doghouse.
Evaluation This mod conforms to FSAR section which dencribes the plant lighting systems including failure analysis.
Although the emergency lighting and transformers may be connected to Class IE 600 V motor control centers, they are not required to be safety grade. He additional electrical load created by the additional lighting falls within the design capacity. Cable separation requirements will be met. Approved techniques are used and no additional seismic analysis is required. No fire barriers penetrations are necessary. ne doghouse lighting is not an accident initiator. It does not affect any safety related equipment adversely or increase the probability of an accident or cause an unanalyzed accident. Here is no increase in the probability or the consequences of a malfunction of equipment important to safety evaluated in *he SAR. This mod does not create a possibility of a malfunction different from any in the SAR. There is no affect to the consequences of an analyzed accident. No setpoints, design limits or operating parameters are affected. There are no unreviewed safety questions.
CN - 10980 Description Replace the turbine supervisory instrumentation (TSI) which is considered to be unreliable and inaccurate with 1 more reliable and accurate systems. Main Control Board (MCB) chart rec.ords are affected, and one modification to the trip system for each turbine occurs. ;
-i Evaluation l A single failure does not adversely s.ffect the availability of this trip function. A seismic review of the main j control board has been completed. Interfaces between the TSI and the turbine trip systems are being upgraded to )
improve their reliability and will minimize the, pnssibility of an unnecessary trip No other accident initiators are i affected. There is no affect on any of the Chapter 15 analysis. There will be no affect on the consequences of an -
analyzed accident. No fission product barriers or source term evaluations are affected. A failure will not create l an accident which has not been considered in the FSAP. There will be no increase in the probability of a malfunction of equipment important to safety previously evaluated in the FSAR. The margin of safety as defined n the basis to any Tech Spec will not be reduced. No setpoints, design limits or operati..g parameters affecting reactor safety are affected by this nxxi. There are no unreviewed safety questions.
CN - 11064 Description The Borg Wamer solid wedge gate air operated valves (ISM 86, ISM 87, ISM 88, ISM 89, ISMI55, !
ISM 161, ISM 164,1HA6,1HA7, and tilA8) will be replaced by Anchor Darling double disc air operated gate valves. He double dise design is less susceptible to thermal binding; the replacement valves will be more reliable in opening. They also will require less maintenance.
Evaluation No system used for accident mitigation is affected by the modifications. Thu SG relief and safety valve lines are larger than the drain lines. The consequences of the inadvertent opening of a SG relief or safety valve is an upper bound to the consequences of a failure of any of the valves to be modified. Seismic qualification of the valves .4 and piping are not adversely affected. The controls for the valves will not be modified. There will be no adverse Modifications 4 Page 2
affect on the performance characteristics of the valves in response to their automatic controls. Instrument air requirements for the valves are not affected. The material and design specifications of the valve to be modified are not degraded by the modifications. The loads associated with normal operation are not adversely affected.
No systems will be adversely affected. Thus, the mod will not increase the probability of an accident. He modifications will not create the possibility of an accident of a different type than any evaluated in the SAR. The mod will not increase either the probability or the consequences of a malfunction of equipment important to safety evaluated in the SAR. He mod will not create the possibility of a malfunction of a different type than any .
evaluate. No fission product barrier or source term evaluation is adversely affected. No setpoint, design limit, nor any operating parameter is adversely affected. He mod will not reduce the margin of safety as defined in the basis of any tech spec. Here are no unreviewed safety questions.
CN -11162 Description Valve INV291 will be replaced with a bolted bonnet gate valve. The new valve will be easier to maintain and can be repaired with spare parts which are readily available. The replacement valve will be l manually operated and will have a stem leakoff line.
Evaluation Valve INV291 is a manually operated valve which is either fully open or fully closed (normal). The velocity coefficient of the replacement valve is greater than the current. Thus, the flow rate through the alternate seal water injection will not be degraded. The replacement of a globe valve with a gate valve is not expected to have any adverse affect on the performance of the NV system. The replacement valve is materially compatible with the interfacing piping. Piping stress analysis has been satisfactorily performed to qualify the affected NV ,
line segments for seismic and other loads. The interface with the RHT will not be affected by this modification.
The alternate seat water injection flow path will not be adversely affected by the mod. The normal seal water .
injection flow path will not be affected. Neither the volume control nor the chemistry control performed by NV will be adversely affected. The leakoff path will not be changed. No other accident initiaton are affected. Thus, the nxxlification will not increase the probability of an accident evaluated in the FSAR. No new failure modes were identified to be associated with the mod. Therefore, the mod will not create the possibility of an accident different from any evaluated in the PSAR. The NV flow paths and components used for emergency core cooling are not adversely affected by the mod. The replacement valve is QA 1 and will comply with the same design specifications and environmental and seismic criteria as the valve to be replaced. - No other equipment important to safety is affected by the mod. Thus the mod will be increase the provability of a malfunction of equipment important to safety evaluated with the FSAR. The mod will not increase the consequences of a malfunction of -
equipment important to safety evaluated in the FSAR. Neither any fission product barrier nor any source term evaluation will be affected by the mod. The mod will not increase the consequences of an accident evaluated in the FSAR. Neither any setpoint, design limit, nor any operating parameter is affected by the mod. The mod will not reduce the margin of safety as defined in the basis any technical specifications. There are no unreviewed ,
safety questions associated with the mod.
CN - 111%
Descrintion The addition of manual three-way valves in addition to flow sight glasses currently used to visually l identify drain leakage from .NV system filters, pumps, and heat exchangers. The three-way valves will allow the .
normal (drain) flow path to be redirected as necessary to measure unidentified leakage. Use of these valves will eliminate frequent and time consuming disassembly of the flow sight glasses in order to measure leakage from the various NV System components. The same model sight glasses will replace the old. .
Evduation The changes are to Class E drain lines in the system. The system will function as before to monitor ,
unidentified Reactor Coolant leakage. The three way valves are manually operated and will only be used to i l
Modifications ;
Page 3 I i
. 1
quantify unidentified leakage. The leakage rates will not be affected and no new failure modes have been identified. Therefore, the probability or consequences of an accident evaluated in the SAR are not increased.
Since leakage rates will not increase and monitoring capabilities still exist as before, equipment operation will be unaffected. Based on this , the probability or consequences of a malfunction of equipment important to safety evaluated in the SAR are not increased. Likewise, since no new failure modes were identified, unidentified l leakage can more easily be measured, and the system will function as before, the possibility for an accident or a malfunction of a different type than any evaluated in the SAR is not created. Since no safety parameters or design l' limits have been adversely affected, no margin of safety as defined in the bases to any Tecimical Specification is reduced. There are no unreviewed safety questions associated with this NSM.
CN - 11220 Descrintion his modification will provide a method for injecting Boric Acid into the CM system during power ,
operation. The Boric Acid must be injected to mitigate the caustic attack on the Unit 1 Steam Generator Tubes. :
A portable boric acid batching skid, including a chemical mixing tank, has been located in the Turbine Building basement which will be utilized to batch boric add for injection to the hotwell. Connections at the hotwell were installed by a previous modification. This will (1) p, d6 yrmanent power for the skid (2) provide demineralized water, YM, to the Boric Acid skid for batching purposes (3) provide a catwalk to allow chemical additions to the Boric Acid Addition Skid.
Eyaluation No undesirable interactions are possible due to the addition of the catwalk. He tie-in to the YM system is not nuclear safety significant as well as the tie-in to the CM system. He power source is a non-safety sourte and will not affect any Class IE electrical equipment. There are no Appendix R concerns. The loads on the affected power rapply remains within design specs. A full technical evaluation was performed for this subject including (1) summary ofindustry experience with boric acid, (2) changes required to the secondary chemistry program, (3) impact on materials compatibility, (4) impact on plant discharge characteristics (5) impact on chemical additional system use. This NSM does not involve any SSCs that are evaluated in the FSAR. All affected components are non-safety rated. The effectiveness of SSCs important to safety will not be degraded due to any design events such as an earthquake because no SSCs important to safety can be degraded due to failure of the affected components. .;
A Modifications Page 4
SUMMARY
OF NUCLEAR EXEMIT CilANGES RELATED TO 10 CFR 50.59 EVALUATONS CE-2487 Description "
This modification wires the normally closed contact on relay "GC* in the trip circuit of 1(2) ETA 2 and 1(2)ETB2 in parallel with the manual trip switch. The contacts are now in series with the sequencer actuation contacts.
This modification was done to ensure that a " relay race
- does not prevent 1(2) ETA (B)2 from closing on a blackout if the set of contacts in the trip circuit show 1(2)FTA(B)1 is open.
Evaluation The interlock between the EPC-ETB feeder breakers and the EPC alternate incoming breakers are not adversely l affected by the modifications. No interface between either the EPC or ETB switchgear and any other system is l adversely affected. Compliance with neither Appendix R nor separation criteria are degraded. No new failure l modes were identified. The seismic qualification of the EPC and ETB switchgear is not affected. Neither any setpoint, design limit, nor any operating parameter is affected. The margm of safety as defined in the basis of the Technical Specifications is not reduced. Therefore, the implementation of this modification does not represent an unreviewed safety question. j l
i I
CE-2581 Description ,
This modification makes an editorial revision to the 1&C list to reflectt the as built condition of valves ,
CNOWGCV3380 and CNOWGSV3380. The 1&C list does not reflect the proper item number for these valves. ]
Eyaluation This modification makes an editorial change to the I&C list to reflect the as-built condition of the station. This change does not affect the operation or design of the station. Therefore, the implementation of this modification does not represent an unreviewed safety question.
CE-2583 F
Description This modification makes an editorial revision to the I&C list to reflect the as built condition of CNOWGTH5600 ,
and CNOWGTil5610. The I&C list does not reflect the pmper manufacturer of these instmments. l Evaluation
'Ihis modification makes an editorial change to the I&C list to reflect the as-built condition of the station. This change does not affect the operation or design of the station. Therefore, the implementation of this modification does not represent an unreviewed safety question. l CE-2795 i
i Description i
Exempt Changes ;
Page1 l i
. .~ -
nis modification replaces the Unit 1 CAPT governor with a new governor with an acceleration speed control containing a 14 second speed setting bushing. In addition, the manufacturer's documentation is being updated to reflect the new characteristics of the govemor.
Evaluation No new failure modes were identified as a result of this modification. No action in the safety analysis is degraded as a result of dtis modification. He performance of the CA Turbine Driven Pump (CATDP) during any design basis events are not adversely affected by this modification. There is no increase in the probability of a CA Pump Turbine overspeed as a result of this modification. This modification does not affect any other system, structure, or component important to safety. No setpoint or design limit is changed as a result of this modification. The +
margin of safety as defined in the basis of the Technical Specifications is not reduced. Herefore, the implementation of this modification does not represent an unreviewed safety question.
CE-3044 Description His nulification replaces the mechanical seal on the Unit I and 2 Containment Spray (NS) Pumps with a mechanical seal of a new design. This new seal is easier to install, reduces the possibility ofleakage, and is more reliable.
I Eviduation _
The ability of the NS System to perform its intended function is not affected by the installation of the new ;
mechanical seal. The seal is designed to operate at the temperature and pressure conditions experienced in this !
portion of the NS System. The new seal results in better sealing capability and more efficient seal installation.
The margin of safety as defined in the basis of the Technical Specifications is not reduced. Therefore, the implementation of this modification does not represent an unreviewed safety question.
CE-3098 l pescrintion ' .
This modification provided an access hole in the ID S/G Main Steam (SM) System piping to perform a i radiographic inspection of weld ISM 39-07. After the inspection, the hole was plugged. .j Evaluation The function or operability of the SM System is not affected. The access hole plug is designed to function at the temperature and pressure conditions in this portion of the SM System and is seal welded. The plug maintains the integrity of the SM System and serves as a pressure boundary. To satisfy seismic concems, a minimum clearance of 0.75" is maintained between the top of the plug and the inside wall of the guard pipe. The access hole and plug do not create any piping stress concerns. The margin of safety as defined in the basis of the Technical Specifications is not reduced. Therefore, the implementation of this modification does not represent an unreviewed safety question.
CE-3358 Descrintion Exempt Changes Page 2
This modification deletes valves INI-011, INI-013, and INI-196 and the associated test line piping between the 1" test header and the 3" header from the centrifugal charging pumps to the Reactor Coolant System cold legs.
His modification also deletes the associated electrical wiring and equipment.
Evaluation ne function or operability of the NI System is not affected by the deletion of this test line. This test line serves no useful function since the check valves in the header from the centrifugal charging pumps to the cold legs do not require any type of testing. This test line was cut and a pipe cap was installed in accordance with the appropriate piping specification. Per Engineering evaluation, deleting this test line does not create any piping stress or support problems. The margin of safety as defined in the basis of the Technical Specifications is not reduced.
Therefore, the implementation of this modification does not represent an unreviewed safety question.
CE-3347 Descriotion This modification replaces the existing one piece piston ring with a two piece wedge style piston ring in condenser dump valves (CDVs) 15B-009, ISB-018, and ISB-027. The associated spacer is also replaced with a spacer designed to be compatible with the new piston ring.
Evaluation The CDVs are non-safety related and do not perform any safety function. The function or operability of the SB )
System is not affected by the new wedge style piston ring and associated spacer. The new piston ring and spacer l
are designed to function at the temperature and pressure conditions experienced in this portion of the SB System.
The CDVs do not interface with any plant system used for accident mitigation. No new failure modes were found to be created by this modification. Neither any setpoint, design limit, nor operating parameter is :ec fr ted. The i margin of safety as defined in the basis of the Technical Specifications is not reduced. Herefore, the j implementation of this modification does not represent an unreviewed safety question. ;
CE-3433 i Descrintion His modification replaces ASCO NP831655E solenoid valves 2VPSV0010,0020,0030,0040,0060,0070, 0080,0090,0100,0110,0120,0130,0150,0160,0170,0180,0190, and 0200 with ASCO NP8316A55E solenoid valves.
Evaluation l The NP831655E solenoid valve exceeds Duke Power Company's external leakage requirement of 10 scc /hr. The :
NP8316A55E solenoid valve is a modified version of the NP831655E in that it has a bleed orifice in the body of _
the valve instead of in the diaphragm and the diaphragms are assembled with locktight to eliminate air intrusion l between the fabric and the ethylene propylene lamination of the diaphragm. The new solenoid valves were I subjected to a hydrostatic pressure of 1300 psi and no leakage was detected. The new solenoid valves are {
qualified under the same test report as the old solenoid valves. The manufacturer states that the new solenoid valves have the same fit, form, function and material as the old. This change does not affect the operation of the VP System. The margin of safety as defined in the basis of the Technical Specifications is not reduced.
Therefore, the implementation of this modification does not represent an unreviewed safety question.
Exempt Changes Page 3
CE-3467 Description This modification revises CNM-1205.00-1997 to include appropriate design required information for verifying actuator torque switch settings for MOVs 2FW-033A,2FW-0498,2KC-C37A,2KC-C40B,2ND-059B, and 2NV-477 per the requirements of NRC Generic Ixtter 89-10. In addition, this modification replaces the spring packs on 2FW.033A and 2FW-049B with spring packs that ais sized for their application.
Evaluation This modification does not affect any present signals that initian valve motion. Valve operator speed and capacity is unaffected. Open and closure times of these valves are not cha nged and are determmed by a stroke time retest in ac"cordance with Technical Specification 4.0.5. This modification does not affect the valves ability to perform their design function in an accident. No safety related function of these valves is added or deleted. The margin of safety as defined in the basis of the Technical Specifications is not reduced. Therefore, the implementation of this modification does not represent an unreviewed safety question.
CE-3506 Description This modification deletes the loop and seal bend associated with instrument loop ISA5020. This tubing is associated with the Auxiliary Feedwater Pump Turbine (CAPT) speed control. The problem associated with this tubing was identified during CA System Audit SITA-90-02(CN).
Evaluation The function or operability of the SA System is not affected by this modification. The old tubing configuration was evaluated by Engineering and determined to be tumecessary and needing modification. The new tubing configuration conform to the installation specifications for a solenoid valve vent. The function of the CAPT l speed control circuit is not affected. The margin of safety as defined in the basis of the Technical Specifications is not reduced. Therefore, the implementation of this modification does not represent an unreviewed safety question.
CE-3540 l
Description ;
This modification revises CNM-1205.00-1997 to include appropriate design required information for verifying !
actuator torque switch settings for various MOVs in the Unit 1 Auxiliary Feedwater (CA) System, Refueling Water (FW) System, Component Cooling Water (KC) System, Reactor Coolant (NC) System, Residual Heat Removal (ND) System, Safety injection (NI) System, Containment Spray (NS) System, Chemical Volume and Control (NV) System, Nuclear Service Water (RN) System, Breathing Air (VB) System, and the Instrument Air (VI) System per the requirements of NRC Generic Letter 89-10. In addition, this modification replaces the spring pack and torque limiter plate for INC-031B, INC-033A, INC-035B and the motors on MOVs INS-012B, INS-0158, INS-029A, and INS-032A with a 16NAl motor.
Evaluation Tnis modification does not affect any present signals that initiate valve motion. Valve operator speed and capacity is unaffected. Open and closure times of these valves are not changed. This modification does not affect the valves ability to perform their design function in an accident. No safety related function of these valves is added or deleted. The new spring pack allows these MOVs to meet their required closing thrust. The 16NAl motor has Exempt Changes Page 4
1 i
the same physical dimensions as the existing motor (14NAX2) and therefore, no seismic concerns exist. The new i motors have higher current rating than the old and require larger O/L heaters to be installed in breakers IEMXJ-F02D, IEMXJ-F02C, lEMXA-R07A, and IEMXA-R06A. The margin of safety as defined in the basis of the Technical Specifications is not reduced. Therefore, the implementation of this modification does not represent an unreviewed safety question.
CE-3541 Description This modification revises CNM-1205.00-1997 001 to include appropriate design required information for -
verifying actuator torque switch settings for various MOVs in the Unit 2 Steam Generator Blowdown (BB)
System, Refueling Water (FW) System, Component Cooling Water (KC) System, Safety Injection (NI) System, Containment Spray (NS) System, Chemical Volume and Control (NV) System, Nuclear Service Water (RN)
System, and the Main Steam (SM) System per the requirements of NRC Generic letter 89-10. In addition, this modification replaces the motors on MOVs INI-100B,2NS-012B, and 2NS-015B with a 16NAl motor. A correction to a wiring discrepancy on CN-2730-02.01 for MOV 2FW-027A is also included.
^dvaluation This modification does not affect any present signals that initiate valve motion. Valve operator speed and capacity is unaffected. Open and closure times of these valves are not changed. This modification does not affect the valves ability to perform their design function in an accident. No safety related function of these valves is added or deleted. The 16NAl motor has the same physical dimensions as the existing motor (14NAX2) and therefore, no seismic concems exist. The new motors have higher current rating than the old and require larger O/L heaters to be installed in breakers 2EMXJ-R088,2EMXJ-F02D, and 2EMXJ-F02C, The margin of safety as defined in the basis of the Technical Specifications is not reduced. Therefore, the implementation of this modification does not represent an unreviewed safety question. ,
L CE-3594 Descrintion This modification revises the hardware and software for the Unit 1 Digital Turbine Control System. Specific changes include the following. Replace the system's MFCs with newer MFPs along with some minor wiring changes to meet the power requirements of the MFPs. Revise the logic to allow Control Valve Movement testing to be performed at 92% Reactor Power instead of 88 %. Modify the Load Drop Anticipator (LDA) logic such that the inputs are processed by the overspeed processor only. Modify the logic for the first out indication for mechanical overspeed. Add an interlock to the systems logic such that above 60% load (as sensed by stage pressure), a main turbine trip will not occur on high exhaust hood temperature. Add a 2 second time delay to the low LH Pressure Turbine Trip logic. Delete the lag block in the stage pressure logic. Modify the Control Valve Test Logic to allow proper testing of Control Valve #4.
Evaluation The Digital Turbine Control System is non-safety and the above modifications were performed during the Unit 1 End-Of-Cycle (EOC) 6 refueling outage. The turbine control system was retested by simulated inputs and by existing station overspeed and startup procedures. The changes implemented by this modification do not affect any reactor trips associated with the main turbine. These changes provide better control of the Turbine and equal or better protection for the turbine and its components. The margin of safety as defined in the basis of the Technical Specifications is not reduced. Therefore, the implementation of this modification does not represent an Exempt Changes ,
Page 5
i unreviewed safety question.
CE-3630 ,
i I
Descrintion -
This modification replaced BAN type fuses in the Essential Motor Control Center secondary CIrr circuits with BAF type fuses and revised affected drawings. In addition, the secondary fuse numbering on specific CNBMs was revised and vendor manual CNM-1314.01-0140-001 has been added as a drawing reference to all the Essential Motor Control Center One-Line Lists. .
Evaluation This change is used to partially resolve Notice Of Violation 413,414/92-01-01. The deletion of BAN fuse types from the Bill Of Materials establishes CNM-1314.01-0140-001 as the single source document to detennine what ,
type of fuse is required for use in Essential Motor Control Centers. This should eliminate confusion and improper fuse selection. The drawinE correction helps to ensure plant configuration controls are in place. The margin of safety as defined in the basis of the Technical Specifications is not reduced. Therefore, the implementation of this modification does not represent an unreviewed safety question.
s CE-3633 pescription This modification replaces the stem in valves INC-31B, INC-33A, and INC-35B with a stem using a better grade of material. All affected drawings were revised to reflect this new information.
Evaluation From the analysis of the stem failure in the Unit 2 PORV block valve per LER 414/91-016, it was detennined that the Unit i PORV Block Valve stems should be replaced with stems using ASME SA638 Grade 660 Type 2 with a Rockwell RMC No. of 02841. No dimensional or configuration changes are made in the new stems, and the new material prevents the stems from becoming brittle at the temperature seen in system operation.
Installation was in accordance with existing maintenance procedures. Post-nyxlification testing verified flow through the system, assured no external leakage, and verified correct operation of the operator. The margin of safety as defined in the basis of the Technical Specifications is not reduced. Therefore, the implementation of this modification does not represent an unreviewed safety question.2 CE-3640 Description This modification removes the present manway flange connections on the BB System Steam Genmtor Blowdown Tank and replaces it with standard forged steel flanges. The new material is SA/A105 300# class flanges.
Evaluation This is a non-QA condition component. Engineering has evaluated this change as well as additional stress analysis and determined it to be acceptable. This change has no affect on the operation or function of this component. The materials used are in accordance with Duke Power Piping Specifications and ANSI standards.
Installation was in accordance with existing maintenance procedures. This change does not affect any safety related equipment needed to mitigate the consequences of an accident. The margin of safety as defined in the Exempt Changes Page 6 l
g,__ .1
- i
-i i
basis of the Technical Specifications is not reduced. Therefore, the implementation of this modification does not )
represent an unreviewed safety question.
CE-3645 -
Description This modification changes the U' nit 2 S/G level program from specifying a constant value regardless of power .,
level to specifying a linear ramp as a function of power. The new full power S/G level setpoint was selected to match the error adjusted full power setpoint for Unit 1. In addition, the lag time constant for the median value of neutron power was changed to allow the associated CF valves to close more smoothly.
Evaluation No hardware changes are being made and no new failure modes are identified to be associated with this modification. The probability of a unit trip during either normal power operations or anticipated operational occurrences is not increased. No system used for accident mitigation is affected by this modification. He consequences of the accidents evaluated in the SAR are not adversely affected. Neither any fission prcxtuct barrier nor any source term evaluation is adversely affected. The mare in of safety as defined in the basis of the Technical Specifications is not reduced. Therefore, the implementation of this mcxlification does not represent an unreviewed safety question.
l
'l CE-3649 j Description This exempt change replaces PORV Block Valves 2NC-33A and 2NC-35B. In addition, the stem on PORV Block J Valve 2NC-31B was replaced with a stem made of the same material as the stems in replacement valves 2NC-33A .
and 2NC-35B. .I Evaluation All design parameters have been reviewed and meet or exceed all required design conditions for this application.
The same operators are being used so there are no physical electrical changes. Some changes are required to accommodate thrust and setup requirements. The center of gravity and weight are slightly different but are acceptable without degrading the seismic qualification of the valves or associated piping. He valve Cv is increased but is not detrimental to system function. The stroke time is not affected by this change. The I component materials are compatible with the environment in which they have been placed. The stem replacement on valve 2NC-31B makes this valve similar to the replacements for valves 2NC-33A and 2NC-35B. Installation was in accordance with existing rnaintenance procedures. Post-modification testing verified flow through the system, assured no external leakage, and verified correct operation of the operator. The margin of safety as defined in the basis of the Technical Specifications is not reduced. Therefore, the implementation of this .
modification does not represent an unreviewed safety question.
CE-3699 ;
1 Description This modification updats incorrectly labeled RF isometrics by renoving the QA condition 3 label. No field work was associated with this modification.
1 Exempt Changes ;
Page 7
F Evaluation The technical justification for removing the QA condition 3 label from the designated RF isometric drawings is ,
given in Design Study CNDS-0161. The basis for determining the proper QA condition boundaries is given in section 9.5.1 of the CNS FSAR and the Selected Licensee Commitments (Section 16.9). His change corrects the QA condition boundaries to ensure adequate fire protection for systems and components important to safety.
Therefore, the implementation of this modification does not represent an unreviewed safety question.
CE-3707 Descriptio.g -
This modification removes all the fuses in each spare compartment of every Essential Motor Control Center and revises affected drawings.
Evaluation This change is being used to partially resolve Notice of Violation 413,414/92-01-01. Eliminating these fuses from the spare compartments prevent the possibility of someone obtaining a fuse other than those which should be procured from the QA warehouse inventory. These changes do not affect any safety related equipment or the ability of safety systems to perform their design functions. The spare breakers are turned off and are not used.
Only an approved modification would allow the use of one of these compartments. The margin of safety as defined in the basis of the Technical Specifications is not reduced. Therefore, the implementation of this modification does not represent an unreviewed safety question.
CE-3713 Description This modification revises CNEEs to reflect the current as-built conditions concerning Secondary Control Power Transformer fuse numbering and sizing.
Evaluation This modification provides the correct Secondary Control Power Transformer fuse numbering and also corrects fuse sizes on various CNEEs. These changes were made so that design documents reflect the as-built condition of the station. These changes do not affect any safety related equipment or the ability of safety systems to perform their design functions. These changes do not alter any plant equipment and are administrative in nature. The margin of safety as defined in the basis of the Technical Specifications is not reduced. Therefore, the implementation of this modification does not represent an unreviewed safety question.
CE-3731 Descrintion This modification deletes support / restraint 2 R-NV-0300. This support needed to be reworked but is located in a high radiation area. Deletion is quicker than reworking this support and minimizes radiation exposure.
Evaluation The function or operability of the NV System is not affected by deleting the above mentioned support.
Engineering perfornni the appropriate calculations and analyses for removal of this support and determined that the NV piping is adequately supported without this support under normal and seismic events. The function or Exempt Changes Page 8
operability of any other supports is not affected by this modification. No new failure modes were identified with this modification. He margin of safety as defined in the basis of the Technical Specifications is not reduced.
Herefore, the implementation of this modification does not represent an unreviewed safety question.
CE-3745 pescrintion This modification revises CNM-12.05.00-1997 to include appropriate design required information for verifying actuator torque switch settings for MOVs IFW-01 A and IFW-32B per the requirements of NRC Generic Letter 89-10.
Evaluation his modification does not affect any present signals that initiate valve motion. Valve operator speed and capacity is unaffected. Open and closure times of these valves are not changed and were verified by a stroke time retest as required by Technical Specification 4.0.5. This modification does not affect the valves ability to perform their i design function in an accident. No safety related function of these valves is added or deleted. He margin of l safety as defined in the basis of the Technical Specifications is not reduced. Therefore, the implementation of this modification does not represent an unreviewed safety question.
i i
CE-3799 pewrintion This modification replaces valves INV-894 and INV-897, item #9J 578, with similar valves having item #9J-501.
All affected drawings were revised to reflect this valve changeout. ;
Evaluation ;
He environmental characteristics of the replacement valves are lower than the original valves but satisfy the design parameters for the system application. All valve dimensions are identical. These valve replacements are acceptable substitutes and do not degrade safety or performance factors in' any way. The replacement valves !
continue to provide all requirements necessary for plant operation and safety. The margin of safety as defined in !
the basis of the Technical Specifications is not reduced. Therefore, the implementation of this modification does not represent an unreviewed safety question.
CE-3815 De<crintion This modification changes the electrical grounding connections for both A and B trains of the Boron Dilution Mitigation System (BDMS).
Ev.a luation Catawba has experienced voltage spikes on the BDMS which made the A Train channel inoperable. An evaluation from the vendor indicated that the grounding method utilized needed modification to reduce any electrical noise interferences. Testing indicated that the problem could be resolved by connecting the BDMS electrical enclosures to the station ground. This modification has corrected the problem. This change does no revise the system's function as described in the FSAR or Techn; cal Specifications. No other changes were made other than grounding revisions. The margin of safety as defined in the basis of the Technical Specifications is not reduced. Therefore, the implementation of this modification does not represent an unreviewed safety question.
Exempt Changes Page 9
CE-3844 pescription This modification capped Unit 1 Incore Instrument Thimble D-10 at the seal table due to thimble damage.
Evaluation Incore Instrument Thimble D-10 on Unit I was discovered damaged during the UIEOC6 refueling outage. The thimble is bent and will no longer pass a detector. As a conservative measure, thimble D-10 was capped with a QA-1 instrument cap. This cap was installed in accordance with approved procedures. This maintains the present NC System pressure boundary and reduces the possibility of a small break LOCA as described in Chapter 15 of the FSAR. Technical Specifications require 75 % or 44 of 58 thimbles to be used during incore flux mapping.
This change increases the number of thimbles which are plugged to three. Therefore, there are still 55 thimbles available for flux mapping. The margin of safety as defined in the basis of the Technical Specifications is not reduced. Therefore, the implementation of this modification does not represent an unreviewed safety question.
CE-3865 Descrintion This modification documents the installation of plugs and sleeves in the Unit I steam generators during the IEOC6 refueling outage.
Evaluation ne input parameters used in the LOCA ECCS analysis and the non-LOCA analysis provide a 10% steam generator tube plugging limit. "C" steam generator is the most limiting generator with respect to tube plugging.
Thk generator is now plugged to a level of 6 %. Therefore, the steam generator tube plugging limit used in the analysea for Chapter 15 accidents is still met. Adequate controls exist with installation procedures to ensure that the installation process for plugs and sleeves do not affect steam generator material strength. Installation of tube plugs and sleeves do not degrade primary system pressure boundary integrity, but serve to maintain it. All materials comply with the Reactor Coolant and interconnected secondary system requirements as specified in the FSAR. This modification does not affect the function of any equipment or systems addressed in the FSAR. The margin of safety as defined in the basis of the Technical Specifications is not reduced. Therefore, the implementation of this modification does not represent an unreviewed safety question.
CE-3871 Descrintion his modification made hardware and software changes to the Unit 2 Digital Turbine Control System. These changes are outlined as follows: 1) Modify the logic to allow testing of Control Valve #4 when it is open at valve references higher than 82.7 %. 2) Properly ground the OlU cabinets. 3) Relocate the power supply for the system fault relay to the power supply panel. 4) Modify the values for the controlling valve Closed positions to 0.5 % and I % with a new deadband of 0.5 %.
Evaluation The changes made under this modification are non-safety. The changes were made during the Unit 2 EOC5 refueling outage during the appropriate outage plant configuration such that equipment, plant, and personnel Exempt Changes Page 10
. =
- l. ?
safety were maintained. The turbine control system was retested after these modifications were implemented to ensure the system would meet its design basis. The changes made have no affect on the reactor trips associated with the main turbine. The margin of safety as defined in the basis of the Technical Specifications is not reduced.
Therefore, the implementation of this modification does not represent an unreviewed safety question.
l CE-3873 )
Descrintion I This modification replaces valves 2KF-7 and 2KF-22, item #5B-207, with new valves having item #5B-487.
i Evaluation The replacement valves do not affect the design conditions or the operating parameters of the system. No accident initiators are affected by the modification. No fission product barriers or source term evaluations are affected.
No system used to mitigate an accident is adversely affected and there are no changes relative to any other system.
Compliance with seismic and Appendix R criteria is not degraded. These changes do not affect any safety limits, ,
setpoints, or operating parameters so the margin of safety as defined in the bases of any Technical Specification are not reduced. Therefore, the implementation of this modification does not repre sent an unreviewed safety question.
CE-3877 Descrintion This modification allows the use of an alternate material (ASTM A276,. Type 304 stainless steel) for the studs which hold the carbon bed covers in place for the VA, VC, VE, VF, and VP filter trains.
Evaluation The functions of all affected filter trains remain unaffected by this modification. The replacement stud material and welds are QA Condition I and compatible with the environment and interfacing components. No other plant systems are affected. Compliance with applicable seismic criteria is not degraded. No common failure modes are created by this modification. Neither any fission product barrier nor any source term evaluation is affected. No change is made to any setpoint, design limit, or operating parameter so the margin of safety as defined in the bases of any Technical Specification is' not reduced. Therefore, the implementation of this modification does not represent an unreviewed safety question.
CE-3901 Descrintion This modification adds a note to drawing CNM-1212.03-002 to allow a material substitution for the aftercooler partitions of the Diesel Generators. The substitution allows for the use of ASME SA 240 Type 304 material in lieu of SA515 grade 70.
Evaluation No system used for any of the phases of normal plant operations is affected by this modification. The ability of the VG System to respond to the Diesel Generator design basis accident is not affected by this modification.-
Compliance with applicable enviromnental and seismic criteria is not adversely affected. Diesel Engine Starting Air (VG) System design specifications remain bounding. Replacenwnt partitions are compatible with both Exempt Changes Page 11
interfacing components and with their environment. No new failure modes nor common cause failure modes are created as a result of this modification. Neither any fission product barrier nor any source term evaluation is affected. No change is made to any setpoint, design limit, or operating parameter so the margin of safety as .
defined in the bases of any Technical Specification are not reduced. Therefore, the implementation of this modification does not represent an unreviewed safety question.
CE-3920 Description This exempt change replaced spring packs on valves IRN847A, IRN8488, IRN849B,2RN846A,2RN847A, 2RN848B, and 2RN849B with Limitorque model 0101-099. This modification was necessary since the valve body was replaced and the existing actuator was left in place. The new valve required a different torque setting ,
Evaluation The new spring packs will have the same form, fit, and function as the old spring pack. The modification does not affect the valves ability to perform their required function during an accident and does not affect operation of the RN system. Therefore this modification does not create an unreviewed safety question.
CE-3938 Description
'lhis exempt change revises station documents to allow the use of Fine Filtration Cartridges as an acceptable substitute for the Spent Fuel Pool Cooling Pre and Post Filters.
l Evaluation The new filters meet or exceed design parameters as specified in the SAR. Also, no component or system used to mitigate any accident is adversely affected by this document change. The new filters are rated to a maximum temperature of 180* F. If all Pool Cooling is lost, the pool is designed to reject heat by boiling. Should this occur, Operator action is required to isolate the new filters from the increased temperatures. A procedure change is therefore required associated with this modification to ensure the integrity of the filter is maintained.
Therefore, no consequences of a malfunction of equipment important to safety will be increased. Neither any common cause failure modes nor any new failure modes are created. Therefore, this modification does not create an unreviewed safety question.
CE-3943 Description This nxxiification replaces the absolute level LAN transmitter OYNLT5750 with a Rosemount i151DP3E22B2.
This also requires the installation of a Lambda power supply LDS-Y-03 to power the transmitter loop. In addition fuse BE-1/0ELCP0009 is replaced with fuse FLQ-3 to increase the circuits rating from 2 amp to 3 amp.
The previously used LAN transmitter was provided with an optional power supply to power the loop. Since the Rosemount does not have this option an alternate power supply is provided.
Evaluation Exempt Changes Page 12
This is a none safety related system used to provide non-safety related cooling to various plant components. This modification will restore the associated instrument.ation within the system to proper operation. Therefore, this modification does not create an unreviewed safety qudstion.
, CE-3965 L
Description This exempt change adds a wiring diagram to CNM-1211.00-0072-005 to allow for proper maintenance.
Evahiation This modification does not affect the operation of the YC system but only provides additional wiring information to ensure proper wiring of the equipment during maintenance. Therefore, this modification does not create an :
unreviewed safety question.
CE-3954 Descrintion This exempt change replaces a pressure transmitters ONBPT6530 & ONBPT6540 with pressure gauges.
Evaluation This nwxlification replaces overranged transmitters with properly ranged local gauges. The transmitters are .]
needed since the manual loader that the transmitters input to are located directly next to the manual loader used to control the process. The input to the manual loader was only for indication anyway. Therefore the ability to control the Recycle Evaporator Feed Demineralizer is enhanced by this modification by providing better ,
indication and this modification does not create an unreviewed safety question.
.i l
CE-3962 Ds.scrmtion j This exempt change adds documentation to the vendor drawing for a spacer that was inserted under a repair work i request to a WZ pump motor.
Evaluation The addition of the spacer to the pump shaft was required so that a pump shaft manufactured on site would properly couple to the pump motor. The operation of the pump / motor was in not affected by this change and therefore this modification does not represent a an unreviewed safety question.
CE-3964 Description This modification deletes T/C indication for the YC Chiller compressor motor stator temperature. A replacement motor being installed did not allow for the pressure fittings required for the T/C's to enter the motor. It was determined that this temperature point was not required. A later Variation Notice, CP-851 was written to relocate this T/C to a point to monitor YC compressor motor casing temperature.
Evaluation Exempt Changes Page 13
ne stator temperature sensors do not serve any safety function. In addition there are two other T/Cs that ar supplied for equipment protection. therefore deletion of this point does not create any unreviewed s question. Variation Notice CP451 written against this exempt change revised the modification to kee in service but relocate it to the motor casing. By adding monitoring capability for the motor casing wit setpoints. Reactivating the T/C for this purpose does not affect component operation and only adds addi monitor capability. Therefore this variation notice also does not create an unreviewed safety question.
CE-3969 Descrintion This exempt change replaces the spring pack on IND-598 with Limitorqueand model # 0301-111 changes item number to 091-619 to allow proper set-up range as required by GL 89-10.
Evaluation
%e new spring pack will have the same form, fit and function as the old spring can and does not affec ability to perform it's design function. Therefore this modification does not create an unreviewe .
CE-4041 Descrintion This exempt change revises the thrust values for valves 2SV-025B,0268,027A, and 028A in CNM-1205 1997, undervoltage Design's
- Torque calculation Switch method.
Setting Sheets". Torques switch settings are increased from 2% to 7%
Evaluation This change does not affect any present signal to the valve. Valve operator speed and capacity is un Stroke times are also not affected nor does this change affect these valves ability to perform their during an accident.
Therefore this modification does not present an unreviewed safety question.
CE-4049 Descrintion This minor refueling outage. rralification revises the Unit 2 S/G Tube Map to reflect tubes plugged and stabilized Evaluation ne number of S/G tubes plugged is an input to the Westinghouse ECCS analysis model. Per W calculation DCP-88-600 (revised under CN05828) supports a tube plugging level up to 10%. U 2EOCS refueling S/G work the S/G with the largest number of plugged tubes contains 43 plu plugging level of 0.94 %. Therefore the ECCS nulel is not affected.
In addition, the worst case scenario of a failed tube plug is ajudged to be a single tube rupture rupture accident. is a design basis accident and is addressed in the FS AR. The installation of tube plugs does n Exempt Changes Page 14
I I
1 1
The use of S/G tube stabilizers to eliminate the potential for S/G tube rupture or damage to surrounding tubes in the event of a tube rupture. The design of the cable stabilizer is such that the applied loadings and resultant stresses are controlled to an acceptable level to alleviate the potential for tube sever. Because of geometry constraints, significant relative motion between the installed cable tube damper assembly and associated tube would not be expected as the stabilizer would be forced to move with the tube. Thus, the potential for wear, the inner diameter of the tube isjudged to be negligible.
Adequate controls exist for tube plugging installation procedures such that tube material strength is not affected.
However, in the event of tube cracking and imbrittlement, the worst case failure isjudged to be a single rupture l event and this is the design basis addressed in the FSAR. Tube plugs will not degrade the primary boundary integrity but will help maintain the RCPB. ;
Based on the discussion above this minor modification does not represent an unreviewed safety question.
CE-4053 Descrintion This minor modification revises drawing CNM-2201.01-0103 001, CMN-2201.00-0059 002 and Westinghouse Stress Report CNM-2201.01-0217 001 to allow repair of a S/G manway stud hole by use of a helicoil.
Evaluation The use of IIelicoils has been previously evaluated for use - this application and is thorefore not addressed in this analysis. Increasing the allowable hole size for use of the IIelicoil is discussed and calculations demonstrating that this is acceptable are documented. Therefore this minor modification does not represent an unreviewed safety question.
)
CE-4054 Descrintion This minor modification removes Unit 2 incore thimble B-3 for service due to high wear rate and places into 'i service thimbles J-1, N4, and R-11. Items 42,50,54,55 are removed from the B-3 thimble and are installed on those being placed into service.
i l
l' Evaluatiogg The B-3 thimble is removed from service based on 2EOC5 refueling ECT results indicating excessive wear. The three retumed to service were all verified to have exhibited acceptable wear rates and are returned to service to provide 54 of 58 operable thimbles (93 %). Tech Spec require 75 % to be used during flux mapping. The installed cap will ensure an acceptable pressure boundary for thimble B-3 and the wear rates for J-1, N4, and R11 are such that RCS pressure boundary will not be adversely affected. Therefore, this minor modification does not represent an unreviewed safety question.
l CE-4065 Description This minor modification increases the allowable tube plugging allowance to 40 tubes in tube pass for the KD Hx's Exempt Changes Page 15
2A and 2B as specified on Test Acceptance Criteria Data Sheets.
Evahration The required heat transfer area for the KD lixs is defined by the amount of heat rejected to the KD system by_the D/G during actual performance testing. The requirements for fluid flow rate, heat transfer surface area, and surface fouling are determined in CNC 1223.59-01-0005. These parameters must combine to provide the required heat transfer capacity. Maintaining the current flow rates , the analysis has been revised for a heat exchanger with up to 40 tubes plugged and determined to be acceptable, it has been determined that the equivalent heat transfer will be preserved and that the operation of the D/G will be unaffected. Herefore this modification does not represent an unreviewed safety question. -
CE-4094 pescrintion This modification provides limit actuated open torque switch bypass contacts which are adjusted for valve open travel span on MOVs 1RN028A and iRN038B. He purpose of this modification is to increase the valves reliability to open when required.
Evaluation Adding the open torque switch bypass will only increase the reliability of these valves to operate when required.
The modification will not affect any present signal that initiates valve motion. Open and close stroke times will not be affected. Therefore this modification does not represent an unreviewed safety question.
CE-40%
Description This modification adds a second Emergency Shutdown System Soundpowered Jack Station in the Technical Support Center.
Evahiation Thisjack station is not safety related and is not involved in any equipment that i nfety related.~ NO operation parameters, safety limits, or setpoints will be changed and therefon: the basis of Technical Specifications is not affected. Therefore this modification does not represent an unreviewed safety question.
CE-4154 Description This modification revises CNM-1205.00-1997 to include appropriate information for verifying actuator torque switch settings per the requirements of NRC GL 89-10 for ISM 077A.
Evaluation The document change for ISM 077A is a revision to the Torque Switch Settings Sheet which serves as the source for valve testing and set-up data. This modification does not affect the valve's ability to perform its design function during an accident. No safety related functions are added or deleted from this valve. Therefore this Exempt Clianges Page 16 l
i i
modification does not create an unreviewed safety question.
CE-4158 Description This minor modification removes instrument OYFTH5220 and plugs process taps. 1 Evaluation The minor modification removes an instrument that has been deemed not required for system operation. The instrument had been overpressurized and would result in unnecessary maintenance costs. This instrument does not serve any safety related function and therefore this modification does not create an unreviewed safety question.
CE 4161 Desenntip_n His minor modification is an editorial change wherein the controller setpoint for 1YM12 varies from 12-15 psig rather than 9 psig. 4 Evaluation -
The I&C list already allowed for this setpoint to be varied and therefore this is an editorial change only. i Therefore this modification does not create an unreviewed safety question.
CE-4162 Description This minor modification revises vendor manuals, adds a note, and the vendor manual number to the Electrical One line drawing to clearly define the fuse type used in Nelson electric motor and distribution control centers. It also upgrades the fur.e type.
Evaluation -
This revision adds clarification to the vendor manual fuse numbers. Except for adding the upgrade fuses these changes are considered editorial and therefore do not create an unreviewed safety question. The upgrade fuses have higher current interrupting capability than the original, therefore no margin of safety will be reduced.- The physical size is such that seismic qualification is not a concern. Distribution of power and loads for normal and accident mitigation will not be degraded due to the basic circuit protection features remaining the same.
Derefore this modification does not create an unreviewed safety question.
CE-4163 Description This minor modification adds valve tag downstream of valve INI-210. The new valve is a 1/2" and the existing ,
valve is a 3/4" therefore a reducer is also required. !
Evaluation Exempt Changes Page 17 l
p
i I
l The purpose of this modification is to allow a permanent means of bleeding off pressure trapped between the Unit !
I cold leg discharge check valves (IN1-165,167,169,171) and the N pump discharge check valves (INI-116, 148). This is necessary to prevent pump discharge relief valves (INI-l19,151) from lifting. He use of this valve for bleeding pressure off of the header is addressed in the 50.59 associated with a compensatory action and is described under that 50.59 separately. The additional weight of the valve, reducing insert, pipe, and pipe cap have all been evaluated and determined to be acceptable. No seismic concerns were identified. %e weld downstream of this valve has been reinstated as class B. Although this weld had been previously downgraded to l class G, no physical changes were made. In conclusion the new valve will not downgrade safety performance J factors in any way. His valve is a vent and is not required for unit shutdown or containment isolation. :
Therefore this nxxlification does not create an unreviewed safety question.
CE-4170 i Description His minor modification replaces valve 2RN-034 with blank spool piece to eliminate a potential bypass leakage l path.
Evaluation This valve provides a drain path to the lake for the RN A supply header for maintenance purposes only and serves i no safety function. He fabricated blank spool piece has been designed to maintain the RN pressure boundary without revision to the existing piping. The spool piece was calculated to weigh significantly less than the valve it replaces and has minimal CG impact therefore there is not a seismic concern. This modification does not change design parameters nor will the effectiveness of plant equipment important to safety be degraded. ,
Herefore this modification does not create an unreviewed safety question. 1 CE-4173 Descrintion !
This minor modification installs an orifice between valves INI-210 and INI-482. Valve INI-482 is also replaced with new item number CMV-589. The purpose for these changes is to provide a means to bleed off pressure from i the N system.
Evaluation The installation of an orifice is to provide for a pressure drop and limit the flow through this line for depressurization. The orifice is designed to limit flow to 0.3 gpm. By establishing this bleed off flow the NI relief valves will be prevented from lifting unnecessarily. The new valve is designed for a throttling function.
The additional weight has been evaluated and no seismic concerns were identified. The orifice is class B and the i downstream fittings, tubing, and the rew valve are class E. Should the class E portion fail the orifice re-mains l intact and limits the leakage from the NI system to 0.3 gpm which has been determined to be acceptable.
Therefore the new valve and orifice do not degrade the safety performance factors in any way and do not create an unreviewed safety question.
CE-4176 ,
l Description 1
i Exernpt Changes 1 Page 18 !
i' This modification removes the diaphragm seal from ONRPG5660. It has been determined that this seal is not required and by eliminating it maintenance costs will be decreased.
Evaluation The diaphragm seal has been deemed unnecessary for the proper operation of the pressure gauge and its removal ,
will reduce the time required replace and calibrate it. He gauge is only used for indication of Boron Recycle feed preheater outlet pressure and serves no safety function. Therefore this modification does not create an unreviewed safety question. l l
l CE-4179 l l
Descrintion ;
This minor modification installs lifting lugs to the top of the reactor coolant pump motor flywheel cover (top hat) ]
to allow for maintenance and flywheel inspection.
Evaluation The use of these welded lugs provides for an improved means of lifting the reactor coolant pump motor covers'.
Both personnel safety and exposure improvements are gained. These new lugs will not affect the FSAR or Technical Specifications and therefore will not create an unreviewed safety question.
CE-4211 Descrintion This minor modification replaces valve IN1-482 to new item number DMV-678 which is more suitable for the throttling application.
Evaluation ne installation of this new valve is to provide for throttling capability to establish flow through this line for depressurization of the N system header. The valve will be throttled to a flow rate of <0.14gpm. By establishing this bleed off flow the N relief valves will be prevented from lifting unnecessarily. The new valve is designed for a throttling function. The additional weight has been evaluated and no seismic concems were identified. The weld downstream of INI-210 has been reinstated as Class B. Although this weld had at one time been downgraded to Class G, no physical changes were made. The new valve is Class B. A limit of 0.14 gpm has been established for flow through this valve this leakage from the N system has been determined to be acceptable.
Herefore this the configuration do not degrade the safety performance factors in any way and do not create an unreviewed safety question CE-4231 Descrintion This minor modification revises vendor manual CNM-1201.05-0273 to reflect a recommendation from Goulds pumps for setting of casing wear ring to impeller wear clearance.
t
- Evaluation The setting of were ring clearances by Goulds Pumps has been developed based on diameter of the rotating member, with corrections applied for material and temperature variations. For an 11 inch wear ring (CNS KC Exempt Changes Page 19
l Pumps), regardless of new or used, the Goulds Savannah Pro Shop recommends using 0.028 inches diametric clearance (0.023" by ring diameter and .005* correction for gallable 300 series SS). Goulds also advises the !
discontinuation of the 0.010" and 0.014' range as a setup clearance for either re-used or replacement wear rings.
Discontinuation of use of the 0.010* and 0.014" range does not increase the probability of an accidents because the KC pumps are not accident initiators. The consequences likewise will not be increased since clearances will be set according to manufactures recommendations and the pumps performance will be unaffected by this change.
He probability of equipment malfunction is decreased by this modification because the potential for rotor seizure is decreased. Therefore this modification does not create an unreviewed safety question.
CE4002 i
Descrintion ;
his Exempt Change installs air conditioning units on the Unit 1 D/G non-emergency trip monitor panels IELCP0029 and 1ELCP0030. His change also adds terminal blocks inside 1ELCP0029 and IELCP0030 to facilitate maintenance.
Evaluation !
The non-emergency trip monitors were installed under an earlier nxxlification to replace the non-safety portion of the diesel vendor's pneumatic trip logic. These monitors are not safety related and trip the D/G only during manual starts. The addition of panel air conditioners will improve the reliability of the trip monitors. l Calculations have confirmed that the seismic mounting of the monitors are not affected by this modification. To make future maintenance and testing easier, terminal strips are installed in the rear of each monitor panel. The non-emergency trip nxmitors are physically and electrically isolated from the safety related portions of the )
emergency D/G controls. The A/C is powered from a separate non-safety power source than the trip monitors ;
and the terminal strips do not functionally change the circuit design. Therefore this modification does not -l represent an unreviewed safety question. ]
CE-60015 l l
Descriotion i This exempt change allow core drills to be made in the Auxiliary Building smd Auxiliary Service Building walls to allow temporary piping to be installed during an upcoming RN piping drain down. This change also make an q editorial correction to CN-1224-55 by removing the QA Condition 3 stamp. l I
Evaluation l The floor slabs in the Service Building are non-QA, and they are not committed fire boundaries. Therefore the j core drills in this location will have no impact on any plant equipment important for plant shutdown. The QA 1 wall line is QA 1 non- structural fire boundary. The seismic integrity of this wall has been verified acceptable !
with the core drill. All the opening will be fire-stopped in accordance with drawings. The wall at line 58 is a 3 !
foot thick QA 1 wall and not a fire boundary. This wall has been verified acceptable with the core drill in place.
Therefore this core drill will not impact any systems, components, structures important to plant safety. Therefore this modification does not represent an unreviewed safety question.
CE4021 Defst i ption l
Exempt Changes Page 20
f This exempt change adds plastic drain piping between valves IRN53B and IRN54A to facilitate RN header draining to class C drain valves IRNE35 and IRND03.
Etaluation The plastic piping will be Class G, non-safety related. Due to the potential structural interaction between the clasa C and G piping, an overlap area using QA 1 supports will be installed. This will structurally isolate the effects of the class G piping from the class C piping during an SSE. He class C piping will remain capable of ,
performing their required function. Derefore this modification does not represent an unreviewed safety question.
CE40023 Description his minor modification replaces Esterline 1124E chart recorded on 2DGCPA and B with Wetsonics DDR10 recorders.
Evaluation This modification replaces obsolete recorders with digital data recorders. The power and signal connections are the same. An additional 4 data points are also added since the new recorders have added capacity. The chart recorders do not perform a safety function and are not evaluated in the FSAR. This modification does no more than replace an existing non-safety related component with an updated equivalent component and therefore does j not create an unreviewed safety question.
I CE40026 j pescription This exempt change adds a third spring to the SG PORV actuators. This change will increase the closing thrust ;
by approximately a factor of two. This change also revises the maximum steam line pressure at which the SG PORV is assumed to open against. The new value is the setting of the first MSSV plus 3 %. This is equivalent to 1175psig + (.03)(1175psig)= 1210.
Evaluation The SG PORVs are evaluated in section 15.1.4 of the FSAR. This accident assumes that the SG PORV fails to close, once open. This change, while slightly increasing the opening time, will not degrade the ability of the valve to close. The accident mitigation function of the SG PORVs is cooldown following a SGTR. This is l accomplished thru manual control via safety grade nitrogen supply. This function has not been degraded by this ]
modification. The spring being added compatible with the existing actuator since the original design of the l actuator was for three springs. No seismic or environmental qualification concerns are created by this change.
Therefore this modification does not represent an unreviewed safety question.
i CE40027 Dmriptign This exempt change modifies piping supports restraints to reduce the stress added when plastic drain lines are added to the branch lines of the RN header for draining of RN during the refueling outage under CE40021.
Evaluation Exempt Changes Page 21
1 The purpose of the supports is identical to that of the supports installed under CE-60021. The plastic piping will be attached to the drain locations at class C isolation valves; 1RNC87, IRND04, and 2RNC87 and Class F isolation valves; 1RNC88, and 2RNC88. The QA 1 supports added by this modification will isolate the affects of this piping to assure the integrity of the drain valves even under SSE loadings as verified in design calculations. =
nerefore this modification does not create an unreviewed safety question.
CE-60029 ;
Descrintion This exempt change replaces all Unit one Durant counters (total of ten) with digital MWH counters. This is a direct replacement.
Evaluation ne existing MWh counters are obsolete and spare parts are not available. The replacement counters have the l same dimensions and function as the original. The new counters weigh five pounds or less and will not degrade the seismic qualification of the control board. These counters are used to show MW generation and ' monthly l power usage. Herefore this modification does not represent an unreviewed safety question.
CE-60030 j
]2escrintion This exempt change replaces all Unit one Durant counters (total of ten) with digital MWH counters. This is a direct replacement.
Evaluation )
The existing MWh counters are obsolete and spare parts are not avadable. The replacement counters have the J same dimensions and function as the original. The new counters weigh five pounds or less and will not degrade ,
the seismic qualification of the control board. These counters are used to show MW generation and monthly power usage. Therefore this modification does not represent an unreviewed safety question.
l CE-60038 Description This modification converts the existing Cold Lab into a Hot Lab by rerouting drains fmm Floor Drain C to the Floor Drain Tank.
Evaluation 1 This modification affects comp (ments of the Liquid Radwaste System (WL). The WL systems is not an initiator of any accident previously evaluated in the FSAR. The Recycle Holdup Tank capacity is not affected by this change. The analysis of the WL system failure reported in the FSAR remains limiting. Neither source term evaluations, nor fission product barriers are degraded, ne piping reroute for the Hot Lab is not safety related and cannot affect any safety related equipment. Due to the piping being class H, an iodine equivalent limit of SE-2 microcuriel 1 ml and a total limit of I microcurie /ml for samples being disposed in the sink is not to be exceeded. Given these limits, any releases from the failure of this piping will be with DPC Nuclear Guidelines .
Therefore this modification does not create an unreviewed safety question.
l Exempt Changes Page 22
1 CE40046 Descrintion This exempt change adds a fuse block and provides wiring for RN Pump 2A and 28 discharge valves 2RN028A and 2RNO38B to fuse the Control Room Indication and the Motor Operator Valve Starter Controls separately.
Evaluation his nnlification will result in meeting proper power separation requirements in the event that a control room problem may cause a fuse to blow and eliminate power to the RN pump switchgear control interlock used to provide automatic opening of these vales on its associated pump start. Making these changes does not create an unreviewed safety question.
CE40047 Description This exempt change replaces MW 38 with Ralon Model # 160(M. This change also makes some editorial changes and does not require any field work.
Evaluation A 50.59 evaluation was completed for this modification and it was demonstrated that this modification does not create an unreviewed safety question. Since this modification is considered safeguards in nature no additional details will be provided in this report. However, the completed 50.59 is available was the original of modification package.
CE40063 Description his minor modification updates the low voltage load list data base to as-built plant conditions. The change also deletes CNLT-1752-01.13-01, CNLT-1752-01.14-01, CNLT-2752-01.13-01 and CNLT-2752-01.14.01 since these CNLt's are adequately documented in the electrical one-line lists.
Evaluation This minor modification only makes editorial changes only to update drawings to the as-built condition of the plant. Therefore this modification does not create an unreviewed saefty question.
CE40070 Description his minor nulification adds new lastrument Air System (VI) isolation valves to the Main Steam Isolation valves (MSIV). It also relocates four filter regulators and four VI isolation valves for the MSIV bypass Valves to an accessible location. These changes are to improve personnel safety when accessing these valves.
I Evaluation The new valves and tubing are non-safety related. The air is supplied to the valves to open and maintain the Exempt Changes Page 23
j l
l 1
valves open. No new line break interactions and no new seismic interactions have been created by this .;
nxxlification. He VI system is not an accident mitigation system and it is consistently classified as non-QA. He i I
ability of the MSIVs and their bypass Valves to close is unaffected by this modification as the vent path provided by the safety solenoid are not af fected by this modification. Therefore this modification does not create an unreviewed safety question.
CE40072 4 1
Dercription his minor modification documents the issuance of the Process Control System Scaling Manual.
Evaluation ne manual issued is a modified version of the McGuse Manual MCM-1201.00-0035 modified to reflect the current as built condition of the plant and its issuance does not involve the installation of a new system or an addition to an existing system. Therefore this modification does not create an unreviewed safety question.
CE40075 Description This minor nxxiification provides cooling for the Control Room Radiation Monitor Cabinets I ARADMON and l 2ARADMON by connecting duct from the cabinet to the return side of the VC System. This modification had previously been installed under TSM# 92055983 01.
Evaluation l The Rad Monitors are not initiators of any accident described in the FSAR. The operation nor the ir. tent of the !
Rad Monitors will not be affected by this modification. The design intent of the VC system , to maintain control room habitability and temperature control, will not be changed. All design functions will remain the same for both the Rad Monitors and the VC system. Herefore this modification does not create an unreviewed safety question.
CE40077 l
Description l This minor modification allows craft the option to drill the same size hole in the electray splice plate at the sane i I
location as vendor M P lluskey has previously furnished. The electray cu rently being received from the vendor no longer have pre-drilled holes.
HEalualiggi ne new electray plate with the Duke Power drilled holes have been shown to be essentially identical to the previously supplied splice plate. Therefore this modification does not create an unreviewed safety question.
CE40080 Description Exempt Changes Page 24
l l
His minor modification revises the process range oflevel transmitter CN0YMLT5260 from 0-102 INWC to 20- !
122 INWC. This change is necessary to account for the 20 INWC in the high pressure leg.
Evaluation j This minor modification will not involve a Structure, System, or Component (SSC) that is addressed in the FSAR.
In addition this modification will not degrade the effectiveness of an SSC important to safety in any design basis accident or event. Therefore this modification does not create an unreviewed safety question. i 1
4 CE40084 Descrintian his minor modification revises the fire hose cabinet detail on CN-1220-72 to meet QA Condition 4 requirements.
Evaluation This modification does not impact any as built fire hose cabinet supports and is strictly an editorial. He revision only upgrades the fire hose cabinet support details shown on drawing CN 1220-72 from "Non-Nuclear Safety Related* to QA Condition 4. Therefore this modification does not create an unreviewed safety question.
CE40085 Descrintion his minor modification revises ICS-A-20.1 to provide some clarification on materials for QA Condition 1 instrumentation serving safety function and non-QA Condition instruments connected to Use Code 8 impulse lines.
Evaluation These revisions are editorial in nature and require no field work to be implemented. This modification does not affect Structures, Systems, or Components (SSC) referenced in the FSAR in a significant manner. Therefore this '
modification does not create an unreviewed safety question.
CE40086 Description This minor modification is an update to the Safety Related and Non-safety Related Areas Pre-Fire Plan and Related Strategies to satisfy the Corrective actions stated in PIP 0-C93-0136,0141 and 0142.
Evaluation The revisions to foe pre-fire plan have no impact on the design or operation of any fire protection system or component. Thiinformation is added to the pre-fire plan to enhance the information available to the Control Room and the Fire Brigade incident Commander during fires at Catawba. Therefore this modification does not create an unreviewed safety question.
CE40087 Description Exempt Changes Page 25
This modification replaces the expansion bellows on the 11E extraction line. This line provides steam from the ninth stage of the Low Pressure Turbine exhaust to the E Feedwater }{ eater. The existing bellows assembly has failed and is leaking.
Evaluation The bellows assemble being replaced under this modification, IllE-5, is not an accident initiator. Thejoint does provide protection for the condenser shell whose function is evaluated in the FSAR 15.2.3 in potentially causing
- Turbine Trip. Increases in secondary Steam Flow, FS AR 15.1.3, and decreases in Feedwater Temperature, FSAR 15.1.1, were all evaluated and determined not to be applicable relative to this change. Since the replacement expansion joint will provide equivalent or superior protection for the Condenser shell and the ninth I stage Turbine exhaust, failures of any of these components is nPt more likely. Therefore this modification does ,
not create an unreviewed safety question.
4 CE40092 Descriotion This minor modification revises documentation to allow use of liGS Bayonet Connectors to seal cable entrances on Rotork actuators. Currently with the use of Swagelock quick connects requires that the actuator be rewired in the field each time the actuator is replaced.
l Evaluation He environmental and seismic Qualification of EGS Bayonet Connectors has been verified acceptable. His minor modification provides an alternative means of sealing Rotork actuators. The EGS connectors will perform .
the same function as the Swagelock connectors now used. Will not degrade the effectiveness of any structure, l system, or component important to safety in any design basis event. Therefore this modification does not represent an unreviewed safety question.
l CE40094 i
Description This minor modification issues insertions to the Westinghouse 7300 Equipment Reference Manual. PIR's 0-C92-l- 0813 and 0-C93-0086 identified fuses in the circuit cards that were not specified in the Bill of Materials.
1 I Evaluation j The insertions are being issued to match the current as built condition of the plant and their issuance does not j
, involve the installation of a new system or an addition to an existing system. Therefore this modification does not i create an unreviewed safety question. j
-1 CE40095 .
Description This minor modification revises CNS-1390.01-00-0098, " Specification For Installation and Repairing of Cable Penetration Firestops" to state that pipe caps are required on both sides of spare penetrations rather than one side.
Exempt. Changes Page 26
I Evaluation his is an editorial change only. No field work is required since all Catawba penetrations were reviewed and j determined to have two pipe caps. Therefore this modification does not create an unreviewed safety question.
l l
l CE-60105 Description his modification will revise RN and KC Test Acceptance Criteria (TAC Sheets) to allow reduced RN flow to KCHXs for Train A only.
Evaluation The :aquired heat transfer capacity of the KC and NS Hxs is defined by the current design basis LOCA peak containment pressure analysis. The specific heat transfer capacities and parameters affecting heat transfer capacity are documented in engineering calculation CNC-1223.23-00-0029. Analysis for the KC and NS Hxs has shown -
that the new vahses are acceptable. In addition, it is clear that the performance of an on-line KC train will not be degraded by reliance on the new Test Acceptance Criteria. Therefore this modification does not create an unreviewed safety question.
CE-60106 Description This minor modification deletes the ESF signal (Ss-0) from the RN supply header isolation valves (IRN067A, 1RN069B) and the KC Heat Exchanger inlet isolation valves (IRN287A, IRN347B).
Evaluation By deleting the open signal to these normally open valves and maintaining the valves de-energized in the open position, these valves will no longer be required to be tested under the IWV and 89-10 valve test programs. Since the only function of these valves is to remain open all design basis events are satisfied. The 1.47 bypass panel is nnlified to alarm anytime one of these valves is intermediate or closed. This will ensure that valve position is continuously monitored in the Control Room, nerefore this modification does not represent an unreviewed safety question.
CE-60107 pescrintion This modification replaces MW 24 with Racon Model No.16004. t Evaluation ne 13000 series is no longer available and has been replaced with the 16000 series. The 1600 series has been evaluated and found to be an acceptable replacement for this application.
This modification will not degrade the effectiveness of any structure, system, or component that is evaluated in the FSAR, it will only enhance the ability of the operators to quickly determine the status of monitored systems -
and components. Therefore this modification does not create an unreviewed safety question.
CE-60108 Exempt Changes Page 27
Description l This minor modification deletes the ESF signal (Ss-0) from the RN supply header isolation valves (2RN067A, 2RN069B) and the KC Heat Exchanger inlet isolation valves (2RN287A,2RN347B).
Evaluation By deleting the open signal to these normally open valves and maintaining the valves de-energized in the open position, these valves will no lonBer be required to be tested under the IWV and 89-10 valve test programs. Since the only function of these valves is to remain open all design basis events are satisfied. ne 1.47 bypass panel is modified to alarm anytime one of these valves is intermediate or closed. This will ensure that valve position is continuously monitored in the Control Room. Therefore this modification does not represent an unreviewed safety question.
CE-60109 Descrintion This minor modification updates the Firs Protection Layout and Boundaries drawing (CN-1209-10 series) to ,
reflect the replacement of the Halon extinguishers with CO2 fire extingushers. Halon has bee . identified as a ozone depletion agent.
Evaluation The FSAR states that fire extingushers will be provided in accordance with NFPA10. NFPA10 discusses Class A, Class B and Class C fires. Halon fire extingu.shers are rated for all three of these. CO2 fire extingushers are only rated for Class B and C, not Class A. Catawba has taken credit for fire hose stations to provide Class A fire protection throughout the plant except for the Control Room and the essential Switchgear Rooms.- These locations are provided with water fire extingushers for Class A protection. Therefore the replacement of Halon fire extinguishers will not degrade the plants ability to control and extinguish Class A, B or C fires and does not create an unreviewed safety question.
CE-60ll2 Description This minor modification corrects error in the Equipment Qualification Master List for the LD, Diesel Lubricating Oil System, ne correction changes the LD pressure transmitters from
- harsh" to " mild" enviromnent. A typographical error is also corrected to indicate the correct unit for a Unit 2 instrument location.
I Evaluation i This modification only corrects erroneous information in the EQML and does not physiadly affect a Structure, System, or Co nponent that is evaluated in the FSAR. Therefore this modification does not create an unreviewed safety question. :
i CE-60113 i Description This minor modification provides drawings to reflect the as-built condition of the plant as the result of new 20 circuits added to the Administration Building lighting panelboard AL-4 to accommodate new security search 1
Exempt Changes Page 28
i 1
-)
i l
equipment.
Evaluation his modification does not involve any structure, system, or component that is evaluated in the FSAR and does !
not degrade the effectiveness of any evaluated in the FSAR. Therefore this modification does not create an I unreviewed safety question.
CE40115 Description his minor modification replacca expansion bellows lHD-5 and lHD4 in the IC Main Condenser due to damage detected during inspection. In addition vibration probes are added to the expansion as necessary to monitor /
vibration levels to determine the cause for the damage.
Evaluation The bellows assemble being replaced under this modiGeation,1HD-5, and IHD-6 are not accident initiators. The joints do provide protection for the condenser shell whose function is evaluated in the FSAR 15.2.3 in potentially causing Tusbine Trip. Increases in secondary Steam Flow, FSAR 15.1.3, and decreases in Feedwater Temperature, FSAR 15.1.1, were all evaluated and determined not to be applicable relative to this change. Since the replacement expansion joint will provide equivalent or superior protection for the Condenser shell and the ninth stage Turbine exhaust, failures of any of these components is pat more likely. Therefore this modification does not create an unreviewed safety question.
CE40116 Description ;
This minor modification provides the option for leak repair of valve INC298 to repair a body to bonnet leak.
This would be accomplished by installing a clamp on the body to bonnet flange and injecting sealant into the clamgi.
Evaluation The pressure boundary of valve INC298 will not be degraded by this modification. However the sealant could be in contact with the Reactor Coolant. The sealant gas been determined to be qualified for contact for the conditions of this application. In addition,the amount of sealant and the pressure of the injected has been specified to ensure that neither the valve nor the NC system is degraded. The components to be added both are compatible with interfacing components. Compliance with seismic and environmental criteria is not degraded, herefore this modification does not create an unreviewed safety question.
CE40ll7 Description This minor modification revises the EQ Master List to correct the location and environment listed for LD pressure trannmitters 1/2LDPT5142,5143,5144,5172,5173, & 5174. When the environment is corrected to show a mila location, the entry for " initial installation Date" an Qualified Life" are no longer required.
Evaluation Exempt Changes Page 29 l
~ ,_
4
I l
l His modification only corrects erroneous information in the EQML and does not physically affect a Structure, l System, or Component that is evaluated in the FSAR. Therefore this modification does not create an unreviewed safety question.
CE40ll8 Description This minor modification declassifies the Waste Gas (WG) system Compressor Skid to from QA-1/ Class C to QA-4/ Class E. No physical changes to the plant will occur as a result of this modification.
Evaluation his modification does not make any physical changes to the plant. Reher, a change to the Design Basis on which future changes will be made. The relevant accident evaluated in ne FSAR is 15.7.1, " Radioactive Gas Waste System Leak or Failure". This accident evaluates the rupture of a Waste Decay Tank. Since the tank is assumed to just rupture even though it is designed not to, the quality of the tanks (QA-1) is therefore not affected.
Any replacement of pressure boundary components will meet seismic design requirements while ensuring an earthquake does not initiate an acci.ient. The QA-2/ Class E design assures that compatibility between materials selected for the system and gas /ficid contained in the system. No accident mitigation equipment will be affected by this modification.
Declassification of the part of the WG system therefore does not create an unreviewed safety question.
CE40121 Descrintion This minor modification replaces Racon Model 13000 unit with a Racon Model 16004 for MW29.
Evaluation The 16004 is the rxommended replacement for the model 13000 unit. The EXA system is non-QA and there are no Technical Specifications affected by this modification. This modification will not degrade the effectiveness'of any structure, system, or component that is evaluated in the FSAR, it will only enhance the ability of the operators to quickly determine the status of monitored systems and components. Therefore this modification does not create an unreviewed safety question.
CE40124 Descrintion This minor modification replaces Racon Model 13000 unit with a Racon Model 16004 for MW25.
Evaluation The 16004 is the recommended replacement for the model 13000 unit. This change is not safety related and is not l involved in any equipment and/or system that is safety related, ne probability or consequences of a malfunction of equipment important to safety is not increased. His change does not induce any new failure modes. Therefore this change does not create an unreviewed safety question.
Exempt Changes Page 30 J
1
CE40125 ,
Description This minor modification updates flow diagram CN-1599-2.3, layout drawing CN-1518-06.85-02 and CN 1518-06.85-04 and the valve cross reference list to indicate the as-built fire sprinkler piping arrangement. ,
Evaluation The revisions to these drawings reflect the as-built conditions and have no impact on the existing design or i operation of any fire protection system or component. Therefore this modification does not create an unreviewed safety question. '
i CE40127 Description This minor modification adds alarm circuit for ingress on exit turnstile.
Evaluation This modification is considered Safeguards Information and therefore a detailed evaluation is not included in this report. Ilowever, a detailed 50.59 was completed for this modification that concluded that a unreviewed safety question does not exist and is included with the original of the modification package.
CE40128 Descrintion This minor modification revises the typical support options for attaching to cable tray grid steel on drawing CNIA-0001.
Evaluation This modification does not change the support system for instrumentation. It allows more versatility in the support attachments while retaining the original criteria for the tubing system itself. Therefore this modification does not create an unreviewed safety question. !
CE40131 Description This minor modification replaces MW10 with Racon Md 16004. The existing mode 1 is no longer available.
Evaluation This modification is considered Safeguards Information and therefore a detailed evaluation is not included in this report. Ilowever, a detailed 50.59 was completed for this modification that concluded that a unreviewed safety question does not exist and is included with the original of the modification package.
1 CE40132 Description Exempt Changes Page 31
1 l
l l
This minor modification removes notation showing connection to instrument ground and is considered an editorial I change only. j Evaluation i
~ nis modification is considered Safeguards Information and therefore a detailed evaluation is not included in this report. However, a detailed 50.59 was completed for this modification that concluded that a unreviewed safety question does not exist and is included with the original of the modification package. !
CE40139 Description his minor modification revises CNS-1390.01-000098, " Specification for Installation and Repairing of Cable Penetration Firestops" to delete the maximum allowable density of Dow Corning 34548 RTV Silicone Foam. :
Evaluation During mixing of the foam components, air is entrained in the product. It is essential that to the fire resistance characteristics of the foam that the amount of entrained air not be excessive. As the foam becomes more dense, less entrained air, the fire resistance characteristics re improved; however, more foam is required to fill a
'i penetration. The removal of the maximum foam density from the specification will not adversely impact the existing design or operation of the foam to perform it's intended function as a fire rated penetration seal.
Therefore this modification does not create an unreviewed safety question.
CE-60148 Descrintion ,
This minor modification makes editorial changes to Design Basis Document (DBD) CNS-1435.00-00-0002, "DBD For Post Fire Safe Shutdown".
Evaluation ,
This revision corrects the DBD to agree with the referenced documents with respect to the Train associated with t Fire Protection Areas 5 & 6 and will not adversely affect any stmeture, system or component important to the safe operation of the plant. Therefore this modification does not create an unreviewed safety question.
CE40155 Description -
This minor modification revises drawings to add an option for the installation of Lifeline Anchors on the exterior of the Reactor Building Concrete Domes.
Evaluation These anchors may be used to support work on the Reactor Domes that require the use of personnel fall protection measures, ne anchors have been designed for a load of 5,000 pounds to meet OSHA requirements. The option will not allow the cutting of reinforcing rebar associated with the Reactor Domes. He option of for installation of these anchors will not adversely impact any Structure, System, or Component required for the safe operation of the plant. Therefore this nnlification does not create an unreviewed safety question.
Exempt Changes Page 32
~ r
SUMMARY
OF SELECTED LIECNSEE COMMITMENTS RELATED 10 CFR 50.59 EVALUATIONS SLC 16.9-6 Descrintion _
, This change accomplished the following: 1) changed the testing requirements for smoke detection instruments !
accessible during plant operation to a visual inspection at least once per six months and a trip actuating devive operational test at least once per year, 2) deleted the requirements for fire detection instmments in the Unit I and 2 Ull! Buildings, and 3) deleted the requirements for eight heat detectors in the East and West Sections of the RN Pump Structure.
Evaluation The evaluation sections are keyed to the numbered sections above:
- 1) his change restored the proper testing requirements for smoke detection instruments accessible during plant operation. These testing requirenwnts were inadvertently changed under a revision to this SLC which was issued March 5,1992. His previous revision contained a typographical error which improperly altered the testing requirements. This change ensured that the appropriate testing requirements are included within this SLC. No actions were taken under the revised testing requirements which were issued on March 5,1992. Therefore, this earlier change had no impact on the testing of these smoke detectors.
- 2) Ris change deleted the requirements for testing the fire detection instruments within the UHI Buildings. The equipment within the UHI Buildings was removed from service and deleted from Technical Specifications. The requirement for testing these instruments should have been deleted when the Technical Specification amendments were appmved. There is no need for this requirement in the SLC since the SLC is intended to provide fire detection capability in those areas where safety related equipment could be damaged.
- 3) nis change deleted the requirements for eight heat detectors in the East and West Sections of the RN Pump Structure. he deletion of these heat detectors will not degrade the fire detection capabilities in the RN Pump Structure since this area contains smoke detectors. The NFPA Standards do not require two different types of fire detectors to be installed at each fire detector h> cation. Therefore, this change does not represent a change to any commitment or requirement concerning fire detection capability.
SLC 16.71 Dsgrintion This change added a commitment to maintain the AMSAC (ATWS Mitigation System Actuation Circuitry) System operable in Mode 1 above 40% of Rated Thermal Power.
Evaluation This change will increase the attention placed on maintaining the AMSAC System in a reliable condition and can only increase the margin of safety provided by this system. No unreviewed safety question was generated as a result of this change.
SLC Changes PageI
SLC 16.11-2,16.11-7 Dsseription Changes to the SLCs were made as a result of modifications which removed EMF 34 from the list ofliquid effluent monitors in SLC 16.11-2 and added requirements to SLC 16.11-2 concerning EMP33. As a result of the modifications, EMP33 will be used to continuously monitor S/G tube leaks. The control functions of EMP34 (isolation of certain BB and NM valves) were transferred to EMF 33. EMP34 was removed frem continuous on-line status and placed in a ' wet layup* configuration. Once a S/G tube leak has been detected and the faulted S/G has been identified, EMP34 may be used to trend the S/G tube leak.
Evaluation Neither EMF is used to maintain any phase of either power generation or conversion, shutdown cooling, fuel handling, or radwaste treatment. Plant operations are not adversely affected by the modifications. No system used for any of the above functions is adversely affected by the changes. No system used to mitigate any accident is affected by the changes. The ability to detect either a S/G tube leak or a limiting case SGTR is not adversely affected by the changes. The ability and availability of EMF 34 to trend either a tube leak or a SGTR is not adversely affected. No fission product barrier is adversely affected. No unreviewed safety question was generated.
SLC 16.9-4 I)escrirition This change was made to allow for the removal and reracking of accessible interior fire hoses to be conducted on a 36-month frequency as opposed to the previous 18-month frequency. Fire hose that is not accessible during plant operations (inside the Reactor Buildings) will continue to be inspected and reracked on an 18-month frequency.
Evaluation ne intent of the applicable NFPA reracking requirement is to ensure that the fire hose will perform when needed.
Based on the type of fire hose used at Catawba, information provided by the vendor, previous hydrostatic testing results, increased inspections for physical damage and the arrangement of the hose storage, the change from an 18-moi.th to 36-month reracking procedure will not degrade the expected performance of the fire hose used at Catawba; therefore, the intent of the NFPA requirement is satisfied.
SLC 16.11 i
Descrintion Rese changes were made to the radiological effluents control SLC as a result of implementation of the new l 10CFR20 requirements. Changes included nomenclature, concentration. limits for noble gases, rewording of the i Bases section to reflect the new Part 20, changes to concentrations, and references to new Part 20 sections. !
i Evaluation !
Compliance with the new limits in 10CFR20.1301 will be demonstrated by operating within the limits of l
10CFR50, Appendix 1 and 40CFR190. The dose rates and corresponding release limits will not affect plant equipment or systems. All changes will not affect any safety systems or any safety evaluations that have been .
previously included in the FSAR.' He margin of safety as defined in Technical Specifications will not be reduced by these changes. Liquid and gaseous release limits and corresponding dose limits arising from the new 10CFR20 changes will not have any adverse effects on safety related systems or equipment in the plant.
SLC Changes Page 2
)
I l
1 SLC 16.117 Description The source check for certain EMFs in Table 16.11-6 was changed to specify use of a light emitting diode (LED).
Evaluation -
Utilizing the LED instead of the previous source check method checks all functional aspects of the EMPs for which failures are credible. No unreviewed safety question was generated as a result of this change. ;
SLC 16.11-7 Description The source check for EMF 58 was changed from a light emitting diode (LED) to Chlorine-36. In Table 16.11-6, reference to a note specifying a LED under " Source Check" for EMF 58 was deleted. The previous reference to a LED was in error.
Evaluation EMF 58 is equipped with a 0.5 microcurie Chlorine-36 checksource. EMF 58 should therefore conform to the definition of source check as found in Technical Specifications Definition 1.34 which states "A SOURCE CIIECK shall be the qualitative' assessment of channel response when the channel sensor is exposed to a source ofincreased radioactivity". The change removed the note specifying the definition stated in SLC 16.11-7, so that the definition in Technical Specifications will apply. The affected monitor is a non-QA condition instrument,' and is not required for safe shutdown of the plant. This monitor is provided to monitor the release of radioactive material in the Monitor Tank Building IIVAC. Using the Chlorine-36 source will not change the sensitivity of the detector nor will it change the alarm / trip setpoint of the monitor. Thus, the monitor's ability to meet its design basis will be preserved.
SLC Changes Page 3
SUMMARY
OF COMPENSATORY ACTION RELATED 10 CFR 50.59 EVALUATIONS Degraded Reactor Coolant Pump Seal 2D Description This compensatory action and associated temporary station modification increased the NC pump 2D #1 seal leakoff setpoint from 4.5 gpm to 6.5 gpm and established a leakofflimit of 7.0 gpm for continuous NC pump operation. NC pump 2D #1 seal leakoff flow had been trending upward. At the time of this compensatory action, NC pump 2D leakoff flo v was above the 4.5 gpm setpoint. Therefore, a new setpoint was established to alert operators to increasing #1 s.al leakoff flow. (This 10CFR50.59 evaluation was performed twice; once on 10/22/92 and once on 1I/12/07.j Evaluation Under normal operation, with a #1 seal leakoff flow of 7.0 gpm, normal seal injection is sufficient to maintain adequate seal temperatures. If seal injection is lost, with a #1 seal leakoff flow of 7.0 gpm, adequate seal temperatures could be maintained by flow from the NC system via the thermal barrier. If both seal injection and KC flow to the thermal barrier are lost, with a #1 seal leakoff flow of 7.0 gpm, seat injection via SSF pump could be established within 7.5 minutes, thus providing acceptable flow to the NC pumps such that adequate seal temperatures are maintained. Therefore, with a #1 seal leakoff flow of 7.0 gpm, adequate flow to the NC pumps seal is ensured and adequate seal temperature is maintained.
Modification and/or Repairs of Control Room Pressure Boundary pescrintion This compensatory action is used for the repair of any control room door, fire barrier, modifications which require penetration of a control room fire barrier, modification which requires drilling a new penetration in the control room, or a modification which requires holding a control room door open to allow temporary ventilation hoses and/or cabling to pass into the control room.
Evaluation Neither the Control Room Ventilation System nor the Control Room Pressure Boundary are identified as an accident initiator. The compensatory actions which were identified for the above activities will ensure that operator doses during any of the design basis events will not increase above GDC 19 limits. Doses will not increase above current FSAR values if credit is taken for current ILRT test results. A degraded control room pressure boundary does not affect any of the accident initiators described in the FSAR. A degraded control room pressure boundary does not affect any of the system support functions of VC.
Steam Generator PORVs 2SVI and 2SV13 p_ecnr> tion Because of erratic stroke times,2SV1 and 2SV13 could not be guaranteed to nwet the required isolation time. A
' TSM was implemented to ensure the valves were secured closed in such a manner that no single failure could cause the valves to spuriously open, thus satisfying the containment isolation requirement of Technical .
Specifications. The safety grade nitrogen supply was left iniact, thus the valves were operable so that in the event of a SGTR or any other event requiring the use of either of these two S/G PORVs to cool down, multiple
- deliberate operator actions would have been required to open the valves.
Evaluation a
Compensatory Actions Page1
l He TSM did not add any new wiring or devices, so no new failure modes of the PORVs were created. The PORVs were still available to cool the unit down to the point of initiating RHRS operation in the event the steam i dumps were not available. The TSM removed the automatic pressure control feature from 2SV1 and 2SV13.
His feature was still available on 2SV7 and 2SVl9, thus minimizing potential challenges to code safety valves. )
He TSM was designed so that no single failure of any component could cause either 2SV1 or 2SV13 to l spuriously open for any design event or design basis accident. He valves were secured in thei lail-safe position by removing power to solenoids, isolating air supplies, or tagging components in certain positions. No new failure modes were created by this TSM for either the PORVs, their associated air supplies, nitrogen supplies, or power supplies.
Steam Generator PORV ISV13 Descrintion l This compensatory action is similar to the preceding one for 2SV1 and 2SV13. A TSM was initiated so that !
ISV13 may only be operated in manual mode. The valve is required to be opened to cool down and initiate RHR I as directed by the EPs and APs and to assist the code safety valves in an event in which they fail to reseat. I Evaluation Refer to the preceding evaluation for 2SVI and 2SV13.
Steam Generator PORY ISVl9 Descrintion This compensatory action is similar to the preceding one for 2SV1 and 2SV13. A TSM was initiated so that :
ISVl9 may only be operated in manual mode. The valve is required to be opened to cool down and initiate RHR as directed by the EPs and APs and to assist the code safety valves in an event in which they fail to reseat.
Ev;dua_. tion Refer to the preceding evaluation for 2SV1 and 2SV13.
Turbine Building Sump Pump 1
Descrirition To prevent overflow of either the Unit 1 or Unit 2 Tuibine Building Sump while one or more of the Turbme Building Sump Pumps were out of service, portable pumps were necessary. Discharge from the Turbine Building Sump Pumps is interlocked with the high radiation signal from EMF 31 to ensure termination of discharge on that l signal. Use of the portable pumps alone did not permit credit to be taken for automatic discharge termination I required by SLC 16.11-2 for EMF 31. His comp nsatory action provided for equivalent protection for release from the sump.
Evaluation Use of this compensatory action to terminate WP sump discharge from portable pumps within 15 minutes of a :
high radiation alarm did not increase the probability or consequences of previously evaluated accidents.~ EhjF31 ..
termination of discharge on high radiation from the WP sumps is not relied upon to mitigate any accidents. As the discharge from the turbine building sumps was routed to the WC system, where it was held up prior to release to the unrestricted area, the possibility of creating an accident other than already evaluated did not exist.
Discharge from the WP sumps without automatic termination is incapable of increasing the probability of a malfunction of equipment important to safety as the equipment involved is not safety related. For this reason and the lack of proximity or interdependence on any safety related equipment, the possibility of malfunctions of j l
I i
Compensatory Actions !
Page 2 l
1 4
e l
equipment important to safety different than any already evaluated was not created. The compensatory action provided for tripping the sump pumps prior to exceeding the limits of 10CFR20 at the effluent outfall to the unrestricted area. This ensured that safety margins were not reduced.
i Both Trains of VC/YC Out of Service Description On 1/11/93, Train B of VC/YC was declared inoperable due to its chiller being out of service. In this condition, if Train A were to have failed, there would have been no cooling to the control room. This compensatory action provided instructions on how to improve temperature control in the event that Train A failed.
Evaluation The actions specified in this compensatory action did not adversely affect any accident initiators as described in the FSAR. These actions did not adversely affect the operation of equipment assumed to function in the event of an accident. The steps to deenergize the pressurizing filter train heaters if an air handling unit was operating did not adversely affect the operation of the filter units because the carbon is tested to 95 % relative humidity. The instructions for holding open control room doors did not create or increase the probability or possibility of an accident as this was to be done under existing approved station compensatory actions. He temporary cooling equipment was not a seismic concern as fans and/or portable coolers were to be located at an adequate distance away from any safety related equipment. Rese actions provided additional contingency measures to what is assumed in the FSAR.
Maintenance Access into ND Pump Room through Auxiliary Building Ilatch
. Description In order to prestage equipment in the Unit 2 ND pump room before an outage, it was necessary to remove a hatch in the ceiling of the pump room. Since the hatch (between the 543' elevation of the auxiliary building and the ND pump room) acts as a fire barrier, a radiation protection access barrier, a VA system pressure boundary, and an environmental qualification zone barrier, compensatory actions were needed to ensure this function was satisfied while the hatch was removed.
Evaluation Adequate controls were placed in the compensatory action to ensure that the hatch is replaced within ten minutes of a safety injection. Replacing the hatch ensures that controi room operator dose and offsite dose is kept below 10CFR50 and 10CFR100 limits and also that EQ requirements for equipment in the auxiliary building are maintained. The time limit ensures that, assuming maximum ECCS and NS pump flows and the FWST at its minimum level, the hatch is replaced prior to initiating containment sump recirculation. Removing this hatch did not introduce any new failure modes for any of the equipment in the ND pump room.or in the area around the hatch.
Train B RN ISI Ilydro .
- Description These compensatory actions were to remove power from valves IRN53B, IRN48B, IRN37B, and 2RN47A after .;
they were closed. Also, valve IRFA56 was to be closed within 10 minutes of the control room becoming aware ;
of a fire. The objective of these compensatory actions was to ensure Train A RN remained operable throughout . >
the test and that the RF system was available to mitigate a design basis fire event. Train B RN was inoperable during the test because of some gagged closed relief valves and because of the connectivity of the plastic piping used for pressurizing the RN system, i l
1 l
l Compensatory Actions l Page 3 1
I l
l Evaluation No new failure modes were created on SSCs relied upon to mitigate design basis accidents. The hydro did not degrade Train A of RN as evidenced by the isolation of those valves that interface between Train A and B RN. In addition, the compensatory actions removed power from these valves, eliminating the possibility of the valves changing position until the compensatory actions were cleared. These compensatory actions did not affect any fission product barriers. RN's ultimate heat sink safety function was not degraded outside the bounds of the existing technical specifications. 1 1
Maintenance Access into Unit 1/2 ND Pump Rooms Description The compensatory action addresses that it is periodically necessary to move equipment into (or out of) the ND Pump room through the hatei. in Se ceiling of the pump room.
Eraluallon '
With compensatory action in place, equivalent protection for the design purposes of the hatch will be ensured.
The hatch is not an accident initiator. The compensatory action ensures that the hatch is reinstalled within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> ofinitiation of a cooldown on the opposite unit to ensure that the effects of a postulated pipe rupture are consistent with design assumptions. Removing this hatch does not introduce any new failure modes for any of the equipment in the ND pump room. Equipment qualification requirements for the equipment in the Auxiliary Building will be maintained. Therefore this compensatory action does not create an unreviewed safety question.
Provide Refueling Integrity for Pen M-303 Description The compensatory action deals with a test plug installed under a Temporary Station Modification into the A train Containment Sump Suction Line during Mode 6 unit operation. The compensatory action provides instructions for an operator to monitor test plug seal pressure and to notify the control room upon evidence of seal degradation so that valve 2NI-185A may be closed to ensure that containment closure is maintained.
Eraluation The refueling cavity is filled during Mode 6 operation and therefore sump recire is not required upon loss of core cooling. The test plug need only be maintained to provide a physical barrier to air flow outside containment.
Since neither the piping or the valve on penetration M-303 are accident initiators the probability of an accident is not increased. His compensatory action requires an operator to monitor the test plug seal pressure to ensure that degradation is detected so that containment closures is maintained. Therefore no new failure modes are created by this compensatory action and it does not create an unreviewed safety question.
Maintenance Access to Unit I and Unit 2 NS Pump Rooms DeKIiplion The compensatory action addresses that is periodically necessary to move equipment into (or out of) the NS Pump room through the hatch in the ceiling of the pump room.
Evaluation With compensatory action in place, equivalent protection for the design purposes of the hatch will be ensured.
The hatch is not an accident initiator. The compensatory action ensures that the hatch is reinstalled within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> ofinitiation of a cooldown on the opposite unit to ensure that the effects of a postulated pipe rupture are consistent ~
Compensatory Actions Page 4
with design assumptions. Removing this hatch does not introduce any new failure modes for any of the equipment in the ND pump room. Equipment qualification requirements for the equipment in the Auxiliary Building will be maintained. Herefore this compensatory action does not create an unreviewed safety question.
Associated with "A" Train RN ISI Ilydro Dracription This compensatory action provides guidance to manually close fire protection valve IRFA56 which was being used to provide hydro pressure for testing of RN piping. Isolating RF to RN is necessary to ensure integrity of the fire protection system in the event of a fire.
Enluation .
The hydro static test will nor create any new failure modes on the RN train and this compensatory action will l prevent any spurious failures caused. De interconnection of the RF and RN lines will not affect operability of the - !
B train RN header since the RN header is isolated during this evolution by valves 1RN47A and 2RN47A. The RN system is not an initiator of any accidents evaluated in the FSAR and no new failure mods are created on SSCs relied upon to mitigate DBA or design accidents. Therefore this compensatory action does not create an unreviewed safety question.
l Maintaining KC Train 2A Availability While Throttling KC Flow to ND Ilx 2A. '
Description ne compensatory action ensures that KC will be available to suppon ND in this configuration. Both trains of ND are required for draining the reactor cavity below 23 feet. This compensatory action allows throttling of KC flow to the ND Hx 2A so that additional KC pump data may be obtained. The action required is to provide a means to restore A Train KC to available status via operator action in the event that B Train KC/.ND were to fait during the duration of the testing on A Train KC.
Evaluation With this compensatory action in place, a means is available to restore KC Train 2A to available status via operator action to support operation of A Train ND in the event of a B Train KC failure. He required action time is 15 minutes, this is a conservative limit for restoring the minimum flow required in the event ofloss of the B train KC/ND to maintain adequate core cooling. The actual time to boiling is 45 minutes. No new accident scenarios are created. Therefore this compensatory action does not create an unreviewed safety question.
Maintaining KC Train 2A Availability With Only KC Pump 2A2 In Operation LkKriplion KC Pwnp 2AI is operating erratically while in Mode 6 or 5 during 2EOCS refueling. His compensatory action provides guidance to ensure the availability of 2A KC train with a single A Train pump.
Evaluation Isolation of KC trains from each other does not increase the probability of an accident. This compensatory action assures the ability of the KC System to supply all required loads. The alignment required by this compensatory .!
action is the post-accident alignment. Redundant design of the KC system is not compromised. Therefore this -1 compensatory action does not create an unreviewed safety question.
Guidelines for Fire Boundary IIntch Compensatory Actions Page 5 r
Description This compensatory allows opening of a fire barrier hatch plug on 560' elevation at AA-BB by providing instructions for immediately closing the hatch upon hearing the safety injection /rx trip or upon leaving the area.
Eyaluation The hatch plugs are not accident initiators. No hatch plugs are removed under this compensatory action that require quick response (less than 30 min). The compensatory actio n provides instructions to reinstall the hatch .
and therefore will not create any new accident. The hatch plugs will be reinstalled prior to affecting any accident analyzed. Therefore this compensatory action does not create an unreviewed safety question.
Removal ofIlatch For Access to Safety Injection Pump 2A For Motor Replacement Description Due to failure of the Safety injection Pump 2A Motor it is necessary to replace the motor. In order to accomplish .
this it will be necessary to remove the hatch over the motor, a section of Auxiliary Building Ventilation Ductwork over the motor.
Eyaluation his hatch is not an accident initiator. Unit 2 will be in Modes 5,6 or No Mode, therefore control room does is not an issue and EQ requirements are maintained. He compensatory action requires that the hatch must be reinstalled prior to entering Mode 4. Herefore this compensatory action does not create an unreviewed safety question.
Access Through 2B NI Pump Room Door (AX232)
Dcicliption To allow decon the 2B Safety injection Pump room it is necessary to leave door AX232 open to bring in equipment. This compensatory action provides instmetions to close this door upon notification by the Shift Supervisor.
Eyaluation This door nor any equipment in the NI Pump room are accident initiators. This compensatory action provides ;
instructions to ensure that the door is closed with in 10 minutes of a safety injection signal. This time limit l ensures that the door is closed prior to initiating containment sump recirculation, which is the earliest time that contaminated water would be present in the NI Pump. Therefore this compensatory action does not create an unreviewed safety question.
Auxiliary Building Hatch 560 FF-55 DescIiption This compensatory action allows removal of this hatch by establishing a fire watch in accordance with SD 2.12.7.
Evaluation As long as the fire watch is performed equivalent fire protection is provided. Therefore this compensatory action does not represent an unreviewed safety question. ,]
.I Temporary Removal Of Hatches to Provide Maintenance Access into FucI Building Through Auxiliary Building 1
Compensatory Actions Page 6
l l
l Description This compensatory action allows removal of hatches between the Auxiliary Building and the Spent Fuel Pool building by providing instmetions to immediately close the hatches and leave the area when notified by the Shif) .
Supervisor. l EXaluallon These hatches nor any equipment in the areas around the hatches are not accident initiators. Nor are the required for accident mitigation (other than a fuel handling accident and the compensatory action has adequate controls in it to ensure no fuel handling is in progress while the hatches are out). Therefore this compensatory action does not create an unreviewed safety question. ,
Temporary Removal of FWST Pipe Trench Covers ,
Description It is periodically necessary to remove the FWST Pipe Trench Covers in order to enter the pipe trench to perform maintenance or inspections. This compensatory action provides instructions to replace the covers within I hour of issuance on a Tornado Watch / Warning or immediately upon announcement of a Safety Injection or Rx trip.
Eyaluation With this compensatory action in place, equivalent protection for the design purposes of these covers is ensured. ;
Tornado missile and Turbine missile protection is ensured and Security control of the area is ensured. He i Equipment Qualification function of these covers is also ensured. These covers are not accident initiators. The I instructions provided ensure that the protective functions of these covers are maintained. Therefore this l compensatory action dm not create an unreviewed safety question.
RN Piping Protection .Against Tornado Missile Protection while Implementing Commoditics/ Facilities Warehouse and Vehicle Maintenance Facility Installation -
Description Buried RN piping must be protected from a tornado generated missile during the installation of the Warehouse and Vehicle Maintenance Facility. This is normally accomplished by providing a minimum earth cover of 5 feet (reference calculation CNC-1150.00-00-0001). This compensatory action provides instructions to replace dirt l l
within I hour following notification of a tornado watch / warning.
Evaluation This compensatory action will ensure that this minimum required cover is established within one hour of a tctnado watch /waming. He piping associated with this compensatory action is not an accident initiator. The controls established by this instruction ensure that the RN piping will be protected against tornado generated missiles so that the ability of the RN system to full fill its required function is not degraded. ,
Pressure Bleed for NI Discharge IIcader Due to Leaking NI Cold Leg Discharge Check Valve (s) By Aligning ;
a Flow Path Through INI-96B To The Waste Evaporator Feed Tank Sump A - 6/23/93 ;
Description Due to NC system leakage past the NI Cold Leg discharge check valve (s), it is necessary to bleed NC system pressure from the NI discharge header until the differential pressure across the check valve (s) is sufficient enough to stop the leakage. This usually occurs around 2200 psig NC system pressure based on past experience. This .
compensatory action provides instruction to close three Ni system valves that may be open to reduce NI header pressure.
Compensatory Actions Page 7
Enluation With this compensatory action in place, NC system pressure can be bled from the NI discharge header in a controlled manner. This will prevent degrading the ECCS flow balance requirements. It will also prevent the NC system pressure from lifling relief valves INIl19 and /or IN1151 and potentially draining the FWST or inadvertently cycling ND boundary valves. He configuration used will limit leakage to 0.1 gpm by throttling INI 208. His is expected to limit NI Ileader pressure below the relief valve setpoint. The safety significance of the installation of this drain valve is discussed under the minor modification 50.59. The minor losses of NC inventory and NI flow will not reduce the margin of safety as defined in the basis to any Technical Specification. Therefore this compensatory action does not create an unreviewed safety question.
Pressure Bleed for N1 Discharge IIcader Due to Leaking NI Cold Leg Discharge Check Valve (s) By Aligning a flow path through INI-120B to The FWST- 6/24/93 Dissriplion Due to NC system leakage past the N1 Cold Leg discharge check valve (s), it is necessary to provide a continuous bleed path for NC system pressure from the NI discharge header. The actions performed under the 6/23/93 compensatory action reduced leakage but was not sufficient to prevent gradual a increase in header pressure. This compensatory action will throttle valve INI208 to allow a maximum continualleakage of 0.1 gpm. His compensatory action provides instructions to close 1NI-208 in the event of NC LOCA prior to Sump Recirculation.
Evaluation With this compensatory action in place, NC system pressure can be bled from the NI discharge header in a controlled manner. This will prevent degrading the ECCS flow balance requirements. The configuration used will limit leakage to 0.1 gpm by throttling INI 208. This is insignificant relative to the nominal 450 gpm ECCS q flow rate. The minor losses of NC inventory and N1 flow will not reduce the margin of safety as defined in the 1 basis to any Technical Specification. Therefore this compensatory action does not create an unreviewed safety question.
Pressure Bleed for NI Discharge IIcader Due to Leaking NI Cold Leg Discharge Check Valve (s) By Aligning a flow path through INI-482 added per Alinor Afod CE-4163 to a floor drain.-7/1/93 i i
Description l Due to NC system leakage past the NI Cold Leg discharge check valve (s), it is necessary to provide a continuous i bleed path for NC system pressure from the NI discharge header. His will be accomplished by throttling valve l INI 482 to allow a maximum leakage of 0.14 gpm. This compensatory action provides recommends to close INI-210 in the event of NC LOCA prior to Sump Recirculation to minimize exposure in the Auxiliary Building.
Evaluation With this compensatory action in place, NC system pressure can be bled from the NI discharge header in a controlled manner. This will prevent degrading the ECCS flow balance requirements. The configuration used ,
will limit leakage to 0.14 gpm by throttling INI-482. This is insignificant relative to the nominal 450 gpm ECCS !
flow rate. The minor losses of NC inventory and NI flow will not reduce the margin of safety as defined in the .,
basis to any Technical Specification. Herefore this compensatory action does not create an unreviewed safety l question.
)
Pressure Bleed for NI Discharge IIcader Due to Leaking NI Cold I,eg Discharge Check Vslyc(s) By Aligning a flow path through INI-208 to a floor drain - 8/17/93 'I Compensatory Actions l Page 8
Destip11on Due to NC system leakage past the N1 Cold Leg discharge check valve (s), it is necessary to provide a continuous bleed path for NC system pressure from the NI discharge header. This will be accomplished by throttling valve iN1208 to allow a maximum leakage of 0.14 gpm. This compensatory action recommends closing INI 208 in the event of NC LOCA prior to Sump Recirculation to minimize exposure in the Auxiliary Building.
haluation With this compensatory action in place, NC system pressure can be bled from the NI discharge header in a controlled manner. His will prevent degrading the ECCS flow balance requirements. His is also less than the allowable 10 gpm Tech Spec value for NC leakage. The configuration used willlimit leakage to 0.14 gpm by throttling iNI 208. His is expected to limit NI Header pressure below the relief valve setpoint. The minor losses of NC inventory and NI flow will not reduce the margin of safety as dermed in the basis to any Technical Specification. Therefore this compensatory action does not create an unreviewed safety question.
Unit 1 Annulus Fire Protection Systems Isolation Description This compensatory action provides guidance to allow temporary isolation of the Unit 1 Annulus Fire Protection ;
System so that drain valve IRF979 can be replaced, t haluation Selected Licensee Commitment 16.9-2 requires that backup fire suppression equipment be provided within one hour afler the Annulus fire protection system has been removed from service. This compensatory action requires that additional specific fire protection equipment be in place prior to isolating. Upon receipt of an alann the continuous fire watch at the annulus fire detection control panel will immediately contact the control room so that the fire brigade can respond. Therefore this compensatory action does not create an unreviewed safety question.
Control Room Pressurization i
Description Various plant activities may have an adverse effect on the ability to pressurize the control room and in fact may render the system inoperable under the most limiting operating condition for Control Room Ventilation (VC) with only one intake open. Rese compensatory action instructions may be used for the repair of any control room i' door, fire barrier, modifications which require penetration of a control room fire barrier, modification which
. requires drilling a new penetration in the control room, or a modification which requires holding a control room door open to allow temporary ventilation hoses and/or cabling to pass into the control room.
]
' haluation i With this compensatory action in place Control Room Operator doses will remain within GDC 19 limits. Tornado protection is restored well within time frames normally allowed for Tornado Compensatory Action (Typically one hour). Therefore this compensatory action does not create an unreviewed safety question. q 1
I i
Reactor Building Penetration Disassembly Desenption 1
It is periodically necessary during outages to disassembly Reactor Building penetrations between the Auxiliary i Building and the Annulus for temporary cables, hoses, etc. These penetrations provide protection for certain i Compensatory Actions Page 9
design basis events to the shared Auxiliary Building as a result of other activities which take place during outages.
These activities consist primarily of removal of the equipment hatch shield door and removal of portions of the boot seal. Therefore, compensatory actions are required to ensure that protection for these design basis events is maintained for the operating unit.
fanhlaljon With this compensatory action in place, equivalent protection for the design purposes of these penetrations is ensured. tornado overpressure protection for the Auxiliary Building will be ensured, security control of the area will be ensured if required. Equivalent fire protection is ensured by establishment of a fire watch in accordance with Site Directive 2.12.7. Therefore this compensatory action does not create an unreviewed safety question.
Operability Evaluation - 2C SG Loose Part Description The operability evaluation addresses the effects ofleaving a loose part (machine turning) in the secondary side of the 2C Steam Generator.
~ Exaluation Based upon the evaluations presented in this document, leaving the turning in the secondary side of the steam generator will not impact the protective boundaries of the S/G. All parts of the 50.59 safety evaluation are satisfied, and this evaluation does not an create an unreviewed safety question.
1 i
I 1
i 1
< l i ,
i -l 4
U
- 'j b Compensatory Actions p Page 10 H I
f 6
i l
l
SUMMARY
OF TEMPORARY STATION MODIFICATION !
RELATED 10 CFR 50.59 EVALUATIONS i l
TSM 92092731-01 Description This TSM eliminated the orifice plate and flanges for INMFE5030 by cutting and rewelding new pipe at welds INM09-7 and INM101-3. It also removed root valves and expansion coils, capped the high pressure and low pressure tap input lines, opened sliding links on IEATC5, and removed the computer points from service. This TSM was performed because the orifice flangejoint has been leak repaired numerous times and was still leaking.
Past attempts at replacing gaskets and bolts, cutting, and machining have failed to eliminate this problem.
Evaluation This TSM did not adversely affect the NM system. The elimination of the orifice plate and flanges and the ;
substitution of piping will satisfy the original design specifications and codes. The inability of INMFE5030 to perform its intended function had no effect on the system since the instrument was already disabled. The )
comparison circuit has not worked properly and was deemed to be unnecessary, it is aligned with non-lE power !
sources and does not perform an accident mitigation function. Valve INM26B does close on a Phase A containment isolation signal. Its ability to do so was not adversely affected ny this TSM. These components were :
already targeted for removal by design per NSM 11278.
TSM 93005508-01 Description This TSM changed timers in the turbine control system electrical trip test logic. The electrical trip test is an automatic test initiated by the control room operator to verify the electrical trip valve and circuitry. The test bypasses the trip function and sequentially (timed) steps through energizing the electrical trip valve, verifying trip 1 action, and then resets the ETV and verifies reset action. CNILIIPS5160 is used as an input to this test. For an undetermined reason, ILIIPS5160 was slow to reset and the test halted on a time out. The 10-second timer
]
controls when the next test step will start and the 8-second timer is the time allowed for the previous test step to !
l complete. This TSM changed the timers from 8 seconds and 10 seconds to 80 seconds and 90 seconds. These new times should provide enough time for ILilPS5160 to reset.
Evaluation his TSM did not affect systems or components addressed in the FSAR in a significant manner. He test logic is ;
not safety related and the trip function has been independently verified to be work.ing correctly. The timers only )
affect the reset function of the test logic.
TSMs 93005157-01 (Unit 1) and 93005178-01 (Unit 2) i Descrintion These TSMs disabled the excess flow check valve status indication inputs to 1/2RFM80 from the status indication terminal boxes 1/2TBOX0503 and 1/2TBOX0504 so that the control room annunciators 1/2AD04.04.08, Excess Flow Check Valve Status Light Panel Trouble, will extinguish.
l Evaluatmn - .1 These TSMs did not revise the systems' function as stated in the FSAR or technical specifications. No other l change was made other than placing two electricaljumpers on 1/2RFM80 to disable the two status indication -
inputs; nevertheless,1/2AD04.04.08 would still alarm if a power failure in 1/2 SIC 4 were to occur. No automatic action or safety related functions were affected. Indication of excess flow check valve status was still available at l the status panel 1/2 SIC 4, and was checked by Operations once per shift for the duration of the TSMs. !
l Temporary Modifications l Page1 1
l l
]
i-TSMs 93055288-01 (Unit 1) and 9305529041 and 93055291-01 (Unit 2)
Description These TSMs involved placing a jumper in an annunciator circuit to quiet the alarm for RN motor high air temperature. The air temperature alarm setpoint was too low.
Evaluation These TSMs had no effect on RN system operation. Motor operation is based on stator temperature, which is monitored on the Operator Aid Computer. These TSMs only affected the air temperature alarm in the control room.
TSM 92085630-01 Description The FSAR discusses processing of the floor drain tank waste stream through the FDT filters. These are disposable cartridge filters rated at 98% retention for 25 micron particle sizes. In order to pump unfiltered water / sludge slurry to the Waste Solidification Facility for solidification, this modification removed the filtering capability of one of the filters. This did not eliminate filtration from the process stream, as normal filtration of all letdown water could still occur in the Monitor Tank Building.
Evaluation -
The FSAR accident analysis addresses a liquid waste stream leak or failure. This accident is based on a worst case scenario which would be the rupture of a recycle holdup tank. This is the highest potcatial atmospheric release source because of its activity level and volume. He FDT subsystem is totally separate from the analyzed accident system, therefore the probability of this accident was not increased. The consequences of a RilT rupture were not increased for the same reasons. The FDT filter is located in a filter bunker equipped with a floor drain leak detector. Should the housing leak, it can be quickly isolated and all leakage handled via the floor drain.
This possibility exists on all filter housings, thus the possibility of a new accident was not created. The FDT rdter housings are physically separated from safety related components and could not increase the probability or consequences of safety related equipment failures. The FDT filters are not technical specification related and do not affect safety related or technical specification equipment. Therefore, no safety margins were reduced.
TSM 93058956-01 l l
Description This TSM changed control for valve 1YM461 (YM Supply Pump Recirculation Valve) from OYMFT5720 to .
0YMPT5430. The Reverse Osmosis Skid was added to the YM system, causing a change in flow control for )
lYM461 from its original design. This TSM will allow for better control of the flow of water from the YM !
Supply Pumps to the Reverse Osmosis Skid and prevent the YM Supply Pumps from deadheading. Also, this should reduce water hammer on the YM piping system.
Evaluation Proper operation of the YM Supply Pumps was verified and proper pressure and flow was verified as maintained I in piping controlled by 1YM461. No unreviewed safety question was generated as a result of this TSM.
TSM 93027838-01 pewrintion This TSM installed a Rexa Corporation X-Pac actuator / drive assembly on valve 2RC-31. The purpose was to monitor operation of the Rexa actuator on this application in order to evaluate for future use. !
l Temporary Modifications l Page 2 t ]
i Description Dese TSMs involved placing a jumper in an annunciator circuit to quiet the alarm for RN motor high air temperature. he air temperature alarm setpoint was too low.
Evaluation -
These TSMs had no effect on RN system operation. Motor operation is based on stator temperature, which is monitored on the Operator Aid Computer. Rese TSMs only affected the air temperature alarm in the control ,
room.
TSM 92085630-01 Descrintion The FSAR discusses processing of the floor drain tank waste stream through the FDT filters. These are disposable cartridge filters rated at 98 % retention for 25 micron particle sizes. In order to pump unfiltered water / sludge slurry to the Waste Solidification Facility for solidification, this modification removed the filtering capability of one of the filters. His did not eliminate filtration from the process stream, as normal filtration of all letdown water could still occur in the Monitor Tank Building.
Evaluation The FSAR accident analysis addresses a liquid waste stream leak or failure. This accident is based on a worst case scenario which would be the rupture of a recycle holdup tank. This is the highest potential atmospheric release source because of its activity level and volume. The FDT subsystem is totally separate from the analyzed accident system, therefore the probability of this accident was not increased. The consequences of a RHT rupture were not increased for the same reas<ms. The FDT filter is located in a filter bunker equipped with a floor drain leak detector, Should the housing leak, it can be quickly isolated and all leakage handled via the floor drain.
This possibility exists on all filter housings, thus the possibility of a new accident was not created.- The FDT filter housings are physically separated from safety related components and could not increase the probability or consequences of safety related equipment failures. The FDT filters are not technical specification related and do ]
not affect safety related or technical specification equipment. Herefore, no safety margins were reduced. l TSM 93058956-01 Descrintion This TSM changed control for valve lYM461 (YM Supply Pump Recirculation Valve) from OYMFT5720 to OYMPT5430. The Reverse Osmosis Skid was added to the YM system, causing a clumge in flow control for 1YM461 from its original design. This TSM will allow for better control of the flow of water from the YM Supply Pumps to the Reverse Osmosis Skid and prevent the YM Supply Pumps from deadheading. Also, this should reduce water hammer on the YM piping system.
Evaluation Proper operation of the YM Supply Pumps was verified and proper pressure and flow was verified as maintained in piping centrolled by lYM461. No unreviewed safety question was generated as a result of this TSM.
TSM 93027838-01 Descrintion His TSM installed a Rexa Corporation X-Pac actuator / drive assembly on valve 2RC-31. The purpose was to monitor operation of the Rexa actuator on this application in order to evaluate for future use.
Evaluation The actuator to be installed mounted in place of the existing actuator. The rated torque of the Rexa actuator is Temporary Modifications Page 2 i
< l
Evaluation The actuator to be installed mounted in place of the existing actuator. The rated torque of the Rexa actuator is more than adequate to operate the valve under load. No additional supports were required. The actuator is a self-contained unit and will not be affected by the corrosive environment of the valve location. The existing control signal cable was used to supply the control signal to the digital Position Control Processor (PCP). He PCP was supplied with the actuator and is included in a NEMA 4X enclosure for protection against the environment. The PCP was supplied with a 25 ft section of cable to connect the PCP to the actuator and was mounted near the valve. The actuator requires 120 VAC power, whereas the previous actuator operated from S75 VAC three phase power. A step-down transformer was installed within a weatherproof enclosure to step the voltage down to the required 120 VAC. The transformer is rated at 1.5 kVA. This is more than adequate for the actuator, which requires 0.84 kVA.
TSMs 92090124-01 (Unit 1) and 92090121-01 (Unit 2)
Drsrir> tion In order to bypass the run indication for the CA to RN swapover for the turbine-driven CA pumps, jumpers were placed in 1/2AFWIFTCP. It had been noted that the relays which energize to indicate that the pumps are operating were non-safety related and powered from non-Class IE sources.
Evaluation ne likelihood of an event in which water from the RN system would be inadvertently pumped to the S/Gs during normal unit operations was not increased. The function of autoswap of the pu npa to the RN system upon indication of unavailability of the normal source of water was not degraded by the modifications. The probability of an unnecessary autoswap was not increased. The performance of the CA system following en accident and a single failure of the pump was shown to not be degraded. He shuntir g of the contacts resulted in the bypassing of a timer associated with the circuit paths indicating that the pump is running. The timer in the circuit path for RN system alignment was not affected. I TSMs 92099859-01 and 93003060-01 Desciintion These TSMs were initiated to revise the Train A and B Control Room Chiller Head Pressure Controller setpoint from i10 psi to a range of 130 to 150 psi. This range will not affect the low evaporator refrigerant temperature trip of the chiller, and is below the 220 psi high condenser refrigerant pressure trip point. There is no requirement to maintain condenser head pressure at i10 psi. Due to the recent problems with refrigerant migration within the chiller, it was found that a condenser be.ul pressure of 130 to 150 psi will improve operation of the chiller at the existing load conditions, coupled with the existing cold RN system water temperature. A higher condenser head pressure will ensure refrigerant level in the evaporator is adequate to prevent a low evaporator temperature trip of the chiller. A more stable flow of refrigerant within the chiller la maintained.
Evaluation Under accident conditions, the heat load entering the evaporator will increase toward the 52.2 F chilled water temperature design value. In order to maintain the design 42 F leaving chilled water temperature, the condenser head pressure will increase, llowever, the head pressure controller will adjust the condenser water flow to control head pressure within the setting of the controller. The condenser is designed for a full flow of 1400 gpm. The condenser is also designed for an entering water temperature of 95 F, and a leaving water temperature of 105 F.
Experience has shown that condenser entering water temperature will not reach 95 F, and entering water temperature during the season in which the TSMs were installed is much lower than this limit. Therefore, the chiller was able to operate within the design limits under the TSMs.
Temporary Modifications Page 3
l TSM 93034733-01
-l Description This TSM installed QA-1 Bussman fuse P/N ABC-7, ID# 02841475C in the Monitor Light System Train B j cabinet (IMLCB) power distribution panet until the correct fuse, Beta Products P/N 120019-22, can be lastalled. '
This TSM was necessary because the 250V,7 amp fuse in the power distribution panel for IMLCB blew during l corrective maintenance and the correct fuse was not in stock at the time, i Evaluation The Bussman fuse P/N ABC-7 is the same type of fuse as the Beta Products P/N 120019-22: 250V,7 amp; therefore, the Bussman fuse has no effect on the Monitor Light System. The Bussman fuse has the same fit, form, and function as the Beta Products fuse.
TSM 9209362341 Description This TSM opened sliding link F-33 in 2AFWPTCP to deenergize 2SASV5020. This failed the CA pump turbine governor to the maximum speed setting and disabled the speed control potentiometers. This TSM was necessary because of the absence of a safety related signal to fail the governor to maximum speed on a Train B CA pump turbine autostart.
[;y.aluation This TSM resulted in the loss of capability to adjust CA pump turbine speed below the maximum speed setting.
No significant effect occurred because the design basis requires the CA pump turbine to operate at maximum speed.
TSMs 92099839-01 (Unit 1) and 92099840-01 (Unit 2)
Description ne purpose of these TSMs was to ensure that all S/G PORVs at Catawba were secured in the closed position so that no single failure could cause any valve to spuriously open. The modifications included the following: 1)
Power was removed from the Train A and Train B solenoid valves which vent air from the bottom of the S/G PORV operator, 2) The air supply to the AFWPTCP manual loaders was isolated, 3) The manual / auto switch for each S/G PORV was white tagged in the auto position, and 4) The manual loaders for each S/G PORV were white tagged in the zero demand position.
Evaluation The nitrogen supplies of each S/G PORV were not affected by the modifications. The modifications were such that if a SGTR or any other event requiring the use of the S/G PORVs were to occur, multiple deliberate operator actions would be required to open the valves. There was no change to any setpoint, operating parameter, or design limit. No fission product barrier was affected. No unreviewed safety question was determined to exist.
TSM 93059558-01 Description This TSM removed automatic actuation capability from S/G PORV 2SVI. This allowed operation in Mode I while troubleshooting for slow stroke time on other valves.
Evaluation A 10CFR50.59 evaluation was originally written for TSMs 9209983941 and 92099840-01, which defeated the automatic control function for all Unit I and 2 PORVs. To help determine the cause of slow stroke times, new Temporary Modifications Page 4 t
TSMs were needed to block the auto signal for each valve, instead of blocking all four at the same time. This allowed each PORV to be tested individually, while maintaining operability of the other PORVs. The 10CFR50.59 evaluation for TSMs 92099839-01 and 92099840-01 (see preceding entry) is therefore also applicable to this TSM.
TSM 92098302-01 Description This TSM allowed two electrical slide links to be opened to restore annunciator I AD08.03.05 to service. The annunciator informs the control room operators of a cooling tower icing problem. The annunciator will energize on a high flume water level coupled with a low temperature sensed on either of the three cooling towers. The switch which monitors the flume level for cooling tower I A had grounded, causing the fuse utdch powers the three temperature sensors for the associated tower to blow. As a result, the relays from the level and temperature sensors for cooling tower I A were deenergized, which had the annunciator energized. The grounded switch could not be repaired until the cooling tower flume is drained during an outage situation.
Evaluation The condenser circulating water (RC) system, of which this modification was a part, is not required to safely shut down the reactor, and therefore does not perform a safety function. his modification allowed the intended function of the annunciator to be restored until the faulty switch could be repaired. Installation of this modification did not affect the intended function of the system.
TSM 92095933-01 Descrintion The purpose of this TSM was to allow the testing of the RN pump pit B level instrumentation without automatically closing the cross-connect valves 1/2RN-47A or auto starting the operable RN pumps. The pit level ,
instrumentation was tested to determine the effects between relay logic circuits when disconnecting the power :
from one of the two transmitters sharing common AC power sources. This testing was required to complete l commitment items resulting from the inadvertent ESF actuation reported in LER 413/92-10. '
Evaluation ;
In accordance with technical specifications, both A and B trains of RN were aligned to take suction from the j standb3 nuclear service water pond. Due to the TSM,1/2RN-47A and 47B could remain open, allowing cross- i train supply for both the Unit I and Unit 2 Train A and B headers. Certain cross-over valves could have been closed and tagged to protect the tunning RN pump (s) from runout. For the duration of the TSM, D/Gs IA and 1B and 2A and 28 were scheduled to remain operable. With both Unit i and 2 in Mode 1, a Sp signal on one unit would have closed the respective unit's cross-over valves, thus providing isolation for the unit essential headers as well as isolating the respective unit's non-essential header from both trains.
TSM 92095459-01 .;
Descriptior.
Level transmitter 2CMLT5450 is used to measure full range hotwell level and provide a signal to chart recorder 2CSCR5840 and an analog computer point. There had been a problem with sir inleakage through the standpipe l arrangement due to condenser vacuum causing the level in the standpipe to be lost which resulted in a false low -
reading. A differential pressure measurement arrangement utilizing a reference leg had been proposed as an altemative to the existing instrumentation. In order to ensure the method would work, a test to ensure water loss from the reference leg would not result was needed. This TSM installed a section of tygon tubing to the tap on the top pipe connected to the standpipe for 2CMLT5450. It plugged the end of tubing and installed an isolation valve on the end connected to the pipe. Approximately one foot of water was added to the tubing. Den the Temporary Modifications Page 5
entire installation was ensured leak-free.
Evaluation No safety related equipment was affected by this TSM. The tygon tubing was secured agains.t the standpipe in a manner that prevented it from being accidently disengaged. No unreviewed safety question was generated as a result of this TSM.
TSM 93018822-01 (Unit 1) and 93018825-01 (Unit 2)
This TSM improves the ability of the Control Room Ventillation system (VC) to maintain proper control room pressurization by tieing open VC dampers 1 & 2 CR-D-9 with power removed.
Evaluation Without the implementation of this TSM, if the opposite unit damper fails, the possibility of ooverpressurizing the control room exists and endangering personnel entering and exiting the control room. If the non-operating unit damper fails, the ability to pressurize the control room would be lost. This TSM does not significantly change the operation oof the VC system. Instead of having all of the recirculation flow comming from one train, it will be split between the two trains. Since the total amount of recire flow will not change, the ability of the VC system to maintain control room at a positive pressure with respect to all adjacent areas will not be affected.
TSM 93064038-01 and TSM 93064038 This TSM installs welded pipe caps on the Nuclear Service Water system (RN) at the cooling water supply and discharge of Upper Containment Ventillation (VU) Units 18 and IC (or I A and IC) for the purposes of isolation, while maintenance is performed. This allows VU units I A and IC (or IB and IC) to remain operable.
Evaluation i l
ne VU system is not required by Technical Specifications. The purpose is to help maintain upper containment air temperature within the requirements of Technical specifications. During the time period that maintenence is being performed, the VU units I A and IB (or 1B and IC) are sufficiant to maintain Upper Containment Air temperature in specification.
TSM 93037864-01 This TSM disables the low-speed winding control circuit for lewer Containment Ventillation unit 1 A (LCVU.
1 A) fan motor. The low-speed winding has developed a short and is causing the breaker to trip. There are four LCVUs in containment, each is a 33 % capacity unit. Three are normally in operation, with one in standby. With LCVU l A incapable of functioning in low-speed, the remaining three units are capable of maintaining containment lower air temperature in specification. Should an additional unit fail, an attempt can be made to operate LCVU-1 A in high-speed to prevent the lower containment air temperature from exceeding limits.
TSM 93028262-01 and 93028258-01 his TSM is to cause Control Room Annunciator "125 VDC Normal Aux Control Power Trouble" to be dark.
Temporary Modifications Page 6
I i
Evaluation j The annunciator is in alarm due to a ground on 125 VDC distribution panel CDA. The ground has been traced to the FWPT 1 A control power and cannot be repaired with the FWPT running. With this annunciator in continuously, any new ground on positive or negative legs of CDA or CDB would not be detected. This TSM only defeats the negative-leg ground indications, therefore implementation of this TSM will enable this annunciator to display indication of a positive-leg ground, should one occure. No automatic actions or safety related functions are affected.
TSM 93020462-01 1
This TSM gags open 2RC-31 (Make-up Control Valve to cooling Tower 2A) while the operator for this valve is 1 repaired.
Evaluation j The RC system removes heat from steam exhausted from the main turbine and is not a safety related system and is not required for safe shutdown of the reactor, therefore this TSM does not have any significant impact on safety related systems or equipment.
TSM 93015246-01 (A Train) and 93100644-01 (B Train)
This TSM will modify the control circuit on the Nuclear Service Water system (RN) Pump Lube Injection l Strainer Inlet Crossover Isolation Valve, IRN-36A (or 1RN-37B), in order to prevent automatic closure on a !
safety injection signal. This valve will be used to establish an alternate flow path of cooling water to the Unit 1 A I (or IB) Diesel Generator (D/G). This alternate flow path will allow the 1 A (or IB) D/G to be maintained available to operate if required, during the RN train A (or train B) return valve replacement.
1 Evaluation 'I l
This TSM will defeat of the Safety injection signal (SS) from 1RN-36A (or 1RN-37B) to close to provide train separation during accident conditions, if the scenario occurs that will require the 1 A (or IB) D/G to operate with the 2B (or 2A) RN Pump supplying cooling to the 1 A (or IB) D/G by way of the operable B (or A) train supply header, a maximum flow of 1203 gpm will be diverted from the operable B (or A) train'. To ensure this diverted flow does not rob flow from other B (or A) train components, the IB (or I A) D/G cooling water flow inlet valve (IRN-292B) (or IRN 232A) will be manually closed when the 1 A (or 1B) engine is started. This will ensure sufficient flow available for the 1 A (or I A) D/G without robbing flow from operable B (or A) train componnents.
TSM 93009002-01,93008998-01,93008935-01, and 93009005-01 i This TSM allows installation of a local test gage to monitor the pressure of nitrogen as it is injected into the steam generators (S/Gs). The nitrogen injection is the normal alignment for each S/O during draining and various dyr layups during unit outage.
Evaluation The installation of these gages will be done after the Main Steam (SM) system is depressurized and will be removed prior to pressurization of the SM system. With the SM system depressurized, the system components are not considered to be affected in any significant manner.
Temporary Modifications Page 7
TSM 93007939-01 :
his TSM will defeat the non-emergency trip of D/G 2B due to High Crankcase pressure.
Evaluation ne High Crankcase pressure trip is a non-emergency trip and is bypassed on an automatic emergency start of the D/G. His trip wai only active during a manual start of the D/G. A failed pressure transmitter is preventing the .
D/G from being manually run and there tre no spares immediately available. This TSM will allow the manual operation of the D/G and there is crankcase pressure displayed on the D/G control panel that the operator can o monitor during manual operation. The installation of thei TSM does not affect any safety related portion of the engine control system.
TSM 93007432-01
'Ibn TSM will allow the Containment Ventillation System (VP) to operate with power removed to the B train humidista;.
Evaluation Tech Specs. requires that VP be operable during core alterations. The time period this TSM will be in place, no fuel will be in the reactor. This TSM allows the VP system to operate for personnel habitability while working in containment. If humidity increases during this time, the A train VP valves will isolate containment and protect the carbon filters. This TSM will be removed prior to core alterations.
TSM 93006714-01 This TSM will defeat the interlock between the Containment Sump pumps and 2WL-827B, that secures the pump when this valve goes closed. This will operation of the pumps while B train essential power is down.
Evaluation The Containment Sump Pumps are not safety related ant the installation of this TSM will not affect safety related equipment.
l TSM 93005051-01,93005050-01,93005031-01, and 93005030-01 .
This TSM removes the internals of check valves between the Nitrogen system (GN) and the Steam Generators (S/Gs). This will assure adequate flow of nitrogen to the S/Gs to ensure nitrogen overpressure during layup and draining conditions. The valves are 2SMi14,115,116,117.
l Evaluation j The GN system is not a safety related syystem. The TSM will be inplace only during plant shutdown and will be removed prior to pressurization tof the S/Gs. Ther is no affect on safety related systems or components.
TSM 93001897-01 Temporary Modifications -
i Page 8 i
His TSM will replace the Unit 2 Gross Durant Counter on IMC9 in the control room. De existing counter has failed and is obsolete.
Evaluation ,
The new counter is a direct replacement which will not change the intended function nor will it degrade the seismic qualification of the control board.
TSM 93014718-01 ,
This TSM will prevent YN (Auxiliary Building Chilled Water System ) pumps from tripping on .: low level !
compression tank interlock, by placing ajumper between the transmitter and pump control circuits, thus preventing a pump trip on low level. This TSM is necessary to replace the existing level transmitter. It is desired to maintain at least one YN pump operating at all times to provide cooling water to the Nuclear Sampling System .
(NM) Sample Flow Heat Exchangers.
Evaluation The purpose of the nevel-pump interlock is for pump protection. This system is not safety related and this TSM ;
does not involve or affect safety related equipment. The only consequence of a failure of this TSM will be the release of radioactive gas as a result of a loss of cooling to the sample heat exchangers during sampling activities. The design of the Auxiliary Building Ventillation system (VA) and the Radition ;
Monitoring syster (EMF) provide protection against relase to the enviornment in excess of the required limits.
l TSM 9301720&OI -l This TSM is to allow 1 A D/G to remain functional and available during the ISI Hydrostatic Test of the A train RN system, by defeating the interlock between the 1 A D/G Cooling Water Return to Standby Nuclear Service Water Pond Valve IRN-846A and the l A D/G Lake Wylie Cooling Water Return Valve, IRN847A. He two valves are interlockal so that iRN-846A will automatically open when IRN-847A'is closed or closing, thereby ensuring both valves will not be closed at the same time. This TSM will allow 1RN-846A to remained powered and closed. During the hydro, it can be opened by the control switch, if needed. The return flow path to the -
lake (IRN-63 A) will be closed but with power on, during the hydro.
Evahiation During the ISI Hydro it is desired to keep the 1 A D/G available, if needed. Since the A train will be declared inoperable and the B train will remain operable, there is no effect on the design basis for either the RN system or the Diesel Generators. Train separation is achieved by closure opf cross-connecting valves on the supply and return headers.
TSM 93014S8401 This TSM is to allow IB D/G to remain functional and available during the ISI Hydrostatic Test of the B trdn AN system, by defeating the interkick between the IBD/G Cooling Water Return to Standby . Nuclear Service Water Pond Valve IRN-848B and the IB D/G Lake Wylie Cooling Water Return Valve, IRN849B. The two valves are interlocked so that 1RN-848B will automatically open when IRN-849B is closed or closing, thereby ensuring
' both valves will not be closed at the same time. This TSM will allow 1RN-8488 to remained powered and ~
Temporary Modifications Page 9
closed. During the hydro, it can be opened by the control switch, if needed. The retum flow path to the lake (IRN-58B) will be closed but with power on, during the hydro.
Evaluation 1
During the ISI Hydro it is desired to keep the IB D/G available, if needed. Since the B tram will be declared inoperable and the A train will remain operable, there is no effect on the design basis for either the RN system or the Diesel Generators. Train separation is achieved by closure opf cross-connecting valves on the supply and .
return headers.
TSM 93012624-01 This TSM will allow the Refueling Water Storage Tank (FWST) beaters setpoint for de-energization to be lowered from 37 % to a 10% FWST level cut-off. This will allow the FWST to remain operable during the the period where FWST inventory has been transfered to the Refueling Canal.
Evaluation The FWST heaters are at 4 % to 5 % tank level. The minium level in the FWST required by Technical Specifications (45,000 gal) with the plant in Mode 5 is approximately 11.5 %. Per the Basis of this Tech. Spec.,
only 3500 gal. of 2000 ppm borated water is necessary for maintaining Shutdown Margin (SDM). At 10%
FWST level thee:: is 39000 gal. There is adequate level remaining to keep the heaters covered even in the event of using the 3500 gal. to main SDM.
TSM 93001897 01 l
This TSM replaces the Unit 2 Gross Durant Counter on IMC9 in the Control Room.
Evaluation ne exidag Durant Counter is in need of repair, however, these counters have become obsolete and no spare parts arr. available.. This TSM will irplace the counter with an direct replacement and will not change the intended function of the counter nor will it degrade the seismic qualificqtion of the control board.
TSM 93001851-01 This TSM will darken annunciator IB CFPT CL TROUBLE by sliding link from the output of ICLPT5310, I pressure switch. One of several inputs to this general annunciator is causing this annunciator to be continuously
- lit, Evaluation ,
The instrument loop affected by this TSM does not perform any automatic action or safety related functions.
local indication of the defeated input remains available.
TSM 93001419-01 This Tsm will remove power from a number of dampers in the Control Room Ventillation System (VC) and these Temperaty Modifications Page 10
i l
dampers will be secured in the open position. -l Evaluation Securing this set of dampers in their open position some changes in flow in the system, current on the air handling units affected, are expected, however , it is anticipated that the changes will not be sigfnificant. Temperatures in the areas serviced by this system are also not expected to change significantly. Engineering instructions are ;
provided with this TSM to monitor before and after conditions and resolve or rebalance system as necessary to 1 maintain design functions. This TSM does not alter the design functions of the VC system, therefore has no i safety saignificance.
TSM 9209544341 This TSM will allow a flow path from the Turbine Building Sump (WP) system directly to the Initial Holdup Pond without first going through the Conventional Waste System (WC). This TSM will alow repairs to be made ;
to piping and valves that interface between WC, WP, and WP. l Evaluation The WP system has a Radition Monitor (1,2 EMF 31) that monitors flow through this system that is potentially ,
radioactive. IP activity is detected, the WP sump pumps are automatically secured. The system can be manually l realigned to send flow to be processM as radioactive waste His ability to re-direct flow if radioactive, is not j degraded by this TSM. None of the systems or components of these systems are safety related nor does this TSM i affect systems important to safety. i TSM 92094773-01 His TSM will convert the Reactor Coolant (NC) system Wide Range (W/R) and Mid-range (M/R) D/P level instrumentation to direct acting instruments with a dry reference leg . (previous design was reverse acting with a wet reference leg) l Evaluation ,
i These instruments are used during Shutdon operations while draining / filling the NC system. These instruments are important during reduced inventory and therefore are used in operations of the Residual Heat Removal system (ND). Hey are important for avoiding loss of ND events. These instruments do not have any automatic !
functions. These instruments replace existing level instruments and do not introduce any new error in the level instrumentation. The ability to provide accurate indication of NC system level is noty degraded by this modificat!on and therefore the probability of a loss of ND event is not increased.
TSM 92090329-01 and 92090325-01 nis TSM will allow the placement of blind flanges 2BBFE5010,2BBFE5020, 2BBFE5000 and 2BBFE5030, to allow the S/Gs to refill while the S/G Blowdown system piping is being replaced.
Evaluation This TSM will be installed while the Unit is Shutdown and in the NOMODE condition and will be removed prior l to unit startup. This TSM will not affect the S/G during the time frame that this TSM is installed. !
l I
Temporary Modifications Page11
)
l j
I
V TSM 92086606419 This TSM will allow the removal of handwheel from 2NC-37 and the installation of a seal cap to stop leakage from the valve. ;
Evaluation The cap is designed for the operating pressure and temperature of the system and will not degrade the existing pressure boundry of the valve. The additional weight does not introduce any seismic concerns.
TSM 92079668-01, 92075160-01, and 93005391-01 This TSM allow the installation of a vacuum transmitter in place of the Pressurized Relief Tank (PRT) pressure transmitter to provide the control room vacuum indication during Vacuum Refill operation.
Evaluation There is no requirement for PRT pressure during this mode of operation. The PRT pressure instrument is interlocked with IWG-220 for auto closure on Hi PRT pressure. This WG piping will be isolated to support the Vacuum Refill process. This instrument loop in not safety related. The transmitter is a direct replacement so there are no seismic concerns.
TSM 92074457-01 This TSM will allow the installation of a blank a the flanges between the flex hoses and valves INC-199, INC-202, INC-205, and INC-208 to eliminate oilleakage through these valves.
Evaluation These valves are used to fill and drain the NC pumps lower oil pots. The installation of these blanks does not operation, as the valves are normally closed and the blanks only serve to ensure isolation. The additional weight of the blanks does not cause any seismic concerns.
TSM 92084273-01 This TSM allows the installation of a jumper to defeat Auxiliary Building Filtered Exhaust Fan (ABFXF) 1 A and Auxiliary Building Unfiltered Exhaust Fan (ABUFXF) 1 A interlock to allow various Auxiliary Building Ventilation System (VA) fans to operate while ABFXF-I A is out of service for maintenance.
Evaluation The evaluation addresses questions and operability concerns of:
- 1. Auxiliary Service Building (ASB) Radiation Levels
- 2. Condensate Air Ejector (ZJ) System operation
- 3. Technical Specification Flow Rates
- 5. Control Room Habitability With ABFXF-I A and ABUFXF-I A down, the ability to obtain proper flow rates through the ASB is not possible.
An unmonitored release could occur. To ensure this does not happen, the Auxiliary Building Radwaste Supply Unit (ABRSU) -l will be tagged out, which will cause the Hot Machine Shop and Radwaste Shipping Area to le at a negative Pressure.
Temporary Modifications Page 12
De ZJ System will be aligned to the Unit Vent, which is monitored. .
The 30,000 +/- 300 CFM Tech. Spec. Flow rates through the ABFXF-1B will not be met. This flow rate is a test point and not a flow rate for Post LOCA design criteria. The Post LOCA flow rate will be met with this TSM installed.
Control Room liabitability will be ensured by the performance of the Control Room Pressurization Test.
The Engineered Safety Features of the VA system are not affected by this TSM.
TSM 93043094-01 This TSM Increases the Main Turbine #8 Vibration Alarm Setpoint from 7 mils to 9 mils.
Evaluation Vibration for this bearing is at or near the 7 mils setpoint rendering the alarm incapable of warning the operator of a vibration problem. Increasing the alarm setpoint will allow the operator to be alcited on increasing vibration.
Turbine vibration alarm setpoints are not addressed in the FSAR or Technical Specifications, therefore this TSM does not affect safety related systems or components.
TSM 93068032-01 This TSM will allow the installation of a temporary pipe plug at Flow Element IRNFE6850 in the Nuclear Service Water System (RN)
Evaluation The RN system supplies cooling water to safety and non-safety ;ystems and components. The installation of this pipe plug is in the non-safety portion of the system. The flow element affected is only used for flow balance testing. This testing is not mandatory and will not be required to return the systern to service. The plug installation meets design and code requirements. The safety portion of the system will function as designed.
TSM 93070322-01 This TSM provides for temporary cooling to the reactor building during times when the Containment Chilled Water system (YV) is out of service.
Evaluation The Containment Ventilation (VP) system is designed to maintain the containment environment within acceptable limits for personnel access during inspection, testing, maintenance and refueling operations. This TSM includes Plant Heating Water (YH) setpoint adjustments temporary placement of Air Handling Units on the Auxiliary Building Roof, and associated piping to route chilled water to the AHU. This TSM will not affect the ability of the VP system to perform its intended function. The limiting condition for this TSM is the 49 F limit on the containment penetration. To prevent overcooling of the penetration the YH system primary loop pumps will be -
set to start at 60 F and the local containment YH supply loop will be set to control leaving air temperature at 52 F. These setpoint adjustments will ensure the YH system provides heat when needed to prevent overcooling. The YH system is not safety related. Here are no Tech.
Temporary Modifications Page 13
Spec. Contamment Temperature concerns with the Unit in Refueling. Evaluation of temporary loads, piping and AHU, and hanger design, were found to cause not seismic concerns. The implementation of this TSM does not affect any systems or components required for safe shutdown or degrade any system operation in any way to cause concern for safety.
TSM 92095444-01 This TSM places a connection on the by-pass line around the chemical pot feeder in the Recirculating Cooling Water (KR) system, for the purpose of installing in-line corrosion monitoring equipment. +
Evaluation The addition of the monitoring equipment will not affect the operation of the KR system in any way. The KR system is not a safety related system and the installation of this TSM does not affect safety related systems or components. i TSM 92093546-01 ,
This TSM allows the welding of a metal plate over a small hole in the Heater Vent (HV) system, down stream from valve IHV79.
Evaluation The HV system is not safety related. This TSM does not affect safety related systems or components. The pipe, with the hole is operable. This patch will stop the leak. Testing has been performed to ensure proper wall thickness for the weld. ,
TSM 93004284-01 This TSM allows the installation of temporary power source for standby use, during Unit 2 outage,2EOC5.
The Power source is two,4160v D/Gs with a 4160/6900 step up transformer that can be connected to the Unit 2 .
6900v switch gear and used to power an Essential 4160v buss. l i
Evaluation There may be times planned during this outage where there will be only one Emergency Diesel Generator (EDG) l will be available with the unit in a low decay heat condition and reduced inventory conditions, the Catawba Shutdown Risk Management program requires that in these conditions one EDO be Operable and one be Available. He purpose if this TSM would be to provide an alternate temporary power source to be available to l power the 2 ETA Essential switchgear through the Unit 6900v switchgear. Administrative controls for the actual use of the temporary power source will be developed as a part of this TSM.
Technical Specifications require an Operable EDG with the Unit in mode 5 or 6. By providing an additional j power source available (per this TSM) to power the Essential switchgear without an Operable EDC , in the event of a loss of offsite power, does not increase the likelihood of a loss of decay heat removal. The loads to be aligned to switchgear 2 ETA have been reviewed. They are a subset of the loads for which 2 ETA was designed.
Also, 6900v Buss, 2TC will not have normal loads in operation during connection of the temporary power source.
No safety related cables are in tre path of the cables to be installed per this TSM. One fire zone will be penetrated, but is not a committed NRC fire zone. Compliance with Appendix R is not degraded.
. Normal shutdown cooling at Unit 2 is not adversely affected. Neither movement of fuel or core alterations are affected. The likelihood of a loss of Spent Fuel Cooling is not increased. Unit I operation is not affected. Imads' on affected power supplies remain within design specification. No " sneak circuits" are created. Thus the 4
Temporary Modifications Page 14
probability of an accident is not increased, W
.Page 15
[