MONTHYEARML24086A4212024-06-26026 June 2024 Email to Chris Warren Decision on the Exemption Request for South Texas Project ML24086A4252024-06-24024 June 2024 Email to Chris Warren Availability of Environmental Assessment for the South Texas Project Exemption ML24101A0082024-04-10010 April 2024 NRR E-mail Capture - South Texas Project - Relief Request - 50.55a(z)(2) - Rvh Penetration 75 ML24052A0152024-02-20020 February 2024 NRR E-mail Capture - South Texas Project - Request for Additional Information - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications (L-2023-LLE-0046) ML24052A0112024-02-16016 February 2024 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications (L-2023-LLE-0046) ML23334A0062023-11-29029 November 2023 NRR E-mail Capture - South Texas Project - Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements ML23319A4442023-11-15015 November 2023 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements ML23278A1532023-10-0505 October 2023 NRR E-mail Capture - South Texas Project – Request for Additional Information - Request for Indirect Transfer of Licenses and Conforming Amendments (L-2023-LLM-0004) ML23264A0972023-09-21021 September 2023 NRR E-mail Capture - South Texas Project - Request for Additional Information - License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23255A2862023-09-12012 September 2023 NRR E-mail Capture - South Texas Project – Draft Request for Additional Information – License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23191A0102023-07-0707 July 2023 NRR E-mail Capture - South Texas Project - Acceptance of Request for Indirect Transfer of Licenses and Conforming Amendments (L-2023-LLM-0004) ML23145A1872023-05-24024 May 2023 July 2023 Emergency Preparedness Program Inspection - Request for Information ML23124A3272023-05-0404 May 2023 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23115A0702023-04-24024 April 2023 NRR E-mail Capture - South Texas Project Units 1 and 2 - Audit Plan - Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections ML23096A1592023-04-0606 April 2023 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code ML23065A0912023-03-0303 March 2023 NRR E-mail Capture - South Texas Project - Draft Supplemental Information Request - Proposed Alternative to the Requirements of the ASME Code ML23003A8082022-11-28028 November 2022 NRR E-mail Capture - Texas Commission on Environmental Quality (TCEQ) Review/Comment Regarding the Draft Environmental Assessment for the South Texas Project Alternate Disposal Request (L-2021-LLL-0022)) ML22249A0692022-09-0606 September 2022 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements (L-2002-LLA-0113) ML22206A0142022-07-20020 July 2022 NRR E-mail Capture - South Texas Project - Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22194A0502022-07-0707 July 2022 NRR E-mail Capture - South Texas Project - Updated Draft Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22194A0492022-06-0808 June 2022 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22123A3272022-05-0303 May 2022 STP EP Exercise Inspection July 2022 RFI ML22115A2632022-04-19019 April 2022 Email Response to David Lochbaum Regarding Interim Configuration of Holtec HI-STORE FW Spent Fuel Multipurpose Canister at South Texas Project Energy Generating Station ML22105A5642022-04-0505 April 2022 Request for Information for Problem Identification and Resolution at STP Nuclear Operating Company ML21344A0072021-12-0909 December 2021 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Alternative Disposal Request ML21305B8022021-11-0101 November 2021 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Inservice Inspection Impracticality ML21257A2262021-09-14014 September 2021 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (L-2021-LLA-0151) ML21160A1522021-06-0909 June 2021 Request for Information NRC Inspection 2021-003 Public Radiation Safety ML21133A2372021-05-0505 May 2021 Request for Additional Information: STP EP Exercise Inspection - July 2021 ML21117A3242021-04-22022 April 2021 NRR E-mail Capture - (External_Sender) STP Questions About Eplan Amendment SE ML21103A0072021-04-12012 April 2021 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Add a Note to TS 3.6.3 and to Remove the TS Index (L-2021-LLA-0041) ML21058A0002021-02-26026 February 2021 NRR E-mail Capture - South Texas Units 1 and 2 - License Amendment Request to Revise Moderator Temperature Coefficient SRs - Audit Plan and Setup of Online Document Access (L-2021-LLA-0004) ML21049A2652021-02-16016 February 2021 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Revise the Moderator Temperature Coefficient Surveillance Requirements (L-2021-LLA-0004) ML21039A8902021-02-0808 February 2021 NRR E-mail Capture - South Texas Project - Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing ML21029A3312021-01-29029 January 2021 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing ML20244A0222020-08-28028 August 2020 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil. (L-2020-LLA-0172) ML20135H1982020-05-14014 May 2020 NRR E-mail Capture - South Texas Unit 1 - License Amendment Request to Revise Safety Injection System Accumulator Pressure - Audit Plan and Setup of Online Reference Portal ML20125A3312020-05-0404 May 2020 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Revise the Emergency Plan (L-2020-LLA-0057) ML20111A0052020-04-17017 April 2020 NRR E-mail Capture - South Texas Project - Request for Additional Information - Proposed Alternative to ASME OM Code 2012 Edition - Relief Request PRR-01 ML20050E1192020-02-19019 February 2020 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Actions - Proposed Alternatives to ASME OM Code Requirements (EPID: L 2020-LLR-0007 to L-2020-LLR-0010) ML19344A0092019-12-0909 December 2019 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping ML19309F1412019-11-0404 November 2019 Supplemental Information Request - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping (EPID L 2019-LLR-0096) (Draft) ML19291A0332019-10-17017 October 2019 NRR E-mail Capture - Acceptance Review Results: STP License Amendment Request Regarding Request to Delete E Bar Definition ML19165A1032019-06-14014 June 2019 NRR E-mail Capture - Draft RAI for STP TS 3.8.1.1 Sbdg SR Change ML19162A1162019-05-22022 May 2019 NRR E-mail Capture - Acceptance Review Results: STP License Amendment Request Regarding TSTF-529 ML19095A6562019-04-0404 April 2019 NRR E-mail Capture - (External_Sender) Handout for 4/10/19 Meeting to Discuss a Proposed Request for South Texas Project, Units 1 and 2, Regarding Repair of Piping Using Carbon Fiber Repair Methods ML19081A1512019-03-21021 March 2019 NRR E-mail Capture - Draft Round 2 RAI - Sbdg Voltage and Frequency LAR (L-2018-LLA-0078) ML19078A3792019-03-19019 March 2019 NRR E-mail Capture - Acceptance Review Results: STP RR-ENG-3-23 (L-2018-LLR-0021) ML18292A7272018-10-19019 October 2018 NRR E-mail Capture - Acceptance Review Results: TSTF-522 (L-2018-LLA-0271) ML18283B9522018-10-10010 October 2018 NRR E-mail Capture - Final RAI - South Texas Standby DG TS Change (L-2018-LLA-0078) 2024-06-26
[Table view] Category:Letter
MONTHYEARML24318C5082024-11-13013 November 2024 Condition Prohibited by Technical Specifications IR 05000498/20253012024-11-0707 November 2024 Notification of NRC Initial Operator Licensing Examination 05000498/2025301; 05000499/2025301 IR 05000498/20240032024-11-0707 November 2024 Integrated Inspection Report 05000498/2024003 and 05000499/2024003 ML24304B0512024-10-30030 October 2024 Cycle 26 Core Operating Limits Report IR 05000498/20244022024-10-23023 October 2024 Security Baseline Inspection Report 05000498/2024402 and 05000499/2024402 05000499/LER-2024-003, Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function2024-10-22022 October 2024 Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function ML24295A0772024-10-21021 October 2024 Licensed Operator Positive Fitness-for-Duty Test 05000499/LER-2024-002, Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-10-17017 October 2024 Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24290A1162024-10-16016 October 2024 Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan ML24255A0322024-09-30030 September 2024 The Associated Independent Spent Fuel Storage Installation - Notice of Consideration of Approval of Direct Transfer of Licenses and Opportunity to Request a Hearing (EPID L-2024-LLM-0002) - Letter ML24269A1762024-09-25025 September 2024 Tpdes Permit Renewal Application WQ0001 908000 05000498/LER-2024-004, Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps2024-09-19019 September 2024 Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps ML24271A3022024-09-18018 September 2024 STP-2024-09 Post-Exam Comments - Redacted ML24274A0902024-09-16016 September 2024 Written Response - EA-24-026 STP Operator - Redacted ML24250A1882024-09-11011 September 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal ML24249A3372024-09-0404 September 2024 Inservice Inspection Summary Report - 2RE23 05000499/LER-2024-001-01, Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-08-29029 August 2024 Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators ML24234A0912024-08-27027 August 2024 NRC Initial Operator Licensing Examination Approval 05000498/2024301; 05000499/2024301 IR 05000498/20240052024-08-22022 August 2024 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2024005 and 05000499/2024005) IR 05000498/20240022024-08-0909 August 2024 Integrated Inspection Report 05000498/2024002 and 05000499/2024002 IR 05000498/20240102024-08-0808 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000498/2024010 and 05000499/2024010 ML24213A0842024-07-31031 July 2024 Application for Order Consenting to Direct Transfer of Licenses ML24218A1462024-07-26026 July 2024 2. EPA Comments on South Texas Project Exemption Ea/Fonsi ML24207A1782024-07-25025 July 2024 Licensed Operator Positive Fitness-For-Duty Test 05000499/LER-2024-001, Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-07-0202 July 2024 Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators 05000498/LER-2024-003, Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump2024-07-0101 July 2024 Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump 05000498/LER-2024-002-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-27027 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function 05000498/LER-2023-003-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-19019 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2872024-05-15015 May 2024 Submittal of 2024 Nrc/Fema Evaluated Exercise Scenario Manual ML24136A2842024-05-15015 May 2024 Independent Spent Fuel Storage Installation Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance ML24130A2712024-05-0909 May 2024 Re Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24128A1572024-05-0707 May 2024 Independent Spent Fuel Storage Installation Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance IR 05000498/20240012024-05-0606 May 2024 Integrated Inspection Report 05000498/2024001 & 05000499/2024001 ML24120A3762024-04-29029 April 2024 Annual Dose Report for 2023 ML24116A2282024-04-25025 April 2024 Annual Environmental Operating Report 05000498/LER-2023-004-01, Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water2024-04-25025 April 2024 Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water ML24116A3032024-04-25025 April 2024 Operations Quality Assurance Plan Condition Adverse to Quality Definition Change Resulting in a Reduction in Commitment ML24117A1602024-04-24024 April 2024 2023 Radioactive Effluent Release Report ML24102A2452024-04-23023 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0046 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24113A3122024-04-22022 April 2024 Cycle 24 Core Operating Limits Report ML24097A0072024-04-0606 April 2024 Relief Request Number RR-ENG-4-07 – Request for an Alternative to ASME Code Case N-729-6 for Reactor Vessel Head Penetration 75 05000498/LER-2024-001, Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-04-0101 April 2024 Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24088A3022024-03-28028 March 2024 Financial Assurance for Decommissioning - 2024 Update NOC-AE-240040, Response to Request for Additional Information for Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-03-21021 March 2024 Response to Request for Additional Information for Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24080A2902024-03-19019 March 2024 Nuclear Liability Certificates of Insurance ML24066A2002024-03-0606 March 2024 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes ML24079A1312024-03-0505 March 2024 Nuclear Insurance Protection ML24060A1742024-02-28028 February 2024 Submittal of Annual Fitness for Duty Performance Report for 2023 IR 05000498/20230062024-02-28028 February 2024 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023006 and 05000499/2023006) 2024-09-04
[Table view] |
Text
I Mohan Thadan i - Revised RAIIfor R R- EN forMohan G-2-35 RR-ENG-2-35 Thadani - Revised R~~t Paae 1 1 PaaeW1; From: 'John T Conly <jtconly stpegs.com>
To: <cajohnsonl @aep.com>, <Andy.Ramirez~austinenergy.com>,
<ldblaylock@cps-satx.com>, <jwood@mattbran.com>, <agutterman@ morganlewis.com>,
<MCT@ nrc.gov>, 'Albert Mcintyre" cacmcintyre.GWPO_NENG.GWDOM_STP @stpegs.com>, *Anup Khosla cakkhosla.GWPO.NGEN.GWDOM_STP@stpegs.com>, *Anna Roberts"
<amroberts.GWPONASSUR.GWDOM-STP@stpegs.com>, 'Albon Harrison' cawharrison.GWPO_NASSUR.GWDOMSTP @stpegs.com>, "David Cobb"
<dlcobb.GWPO_BSYSTMS.GWDOMSTP 6stpegs.com>, Frank Mallen'
.fhmallen.GWPOBSYSTMS.GWDOM_STP @stpegs.com>, 'Gary Parkey' cglparkey.GWPOJNGEN.GWDOM-STP@stpegs.com>, 'Ed Halpin'
<halpined.GWPO_NGEN.GWDOM-STP@stpegs.com>, Joe Loya"
<jaloya.GWPO-NENG.GWDOMSTP@stpegs.com>, *JCraig Younger
<jcyounger.GWPONENG.GWDOMSTP @stpegs.com>, 'John Lovell' cjriovel.GWPONGEN.GWDOM-STP@stpegs.com>, James Morris' jrmorris.GWPONASSUR.GWDOMSTP @stpegs.com>, "James Sheppard" cjsheppard.GWPOBSYSTMS.GWDOMSTP@stpegs.com>, "John T Conly 4jconly.GWPO-NASSUR.GWDOMSTP@stpegs.com>, "Kathleen Work"
<kawork.GWPO_NASSUR.GWDOMSTP@ stpegs.com>, Kenneth Taplett' ckjtaplett.GWPONASSUR.GWDOMSTP stpegs.com>, "Lewis Allen" cIdallen.GWPO_NENG.GWDOM-STP@stpegs.com>, "Mark McBumett" cmamcbumett.GWPONASSUR.GWDOMSTP@stpegs.com>, 'Michael Meier" cmdmeier.GWPO_PLTSVCS.GWDOMSTP@stpegs.com>, "Marilyn Johnson
.mkjohnson.GWPONASSUR.GWDOMSTP @stpegs.com>, "Michael Lashley cmslashley.GWPO_NENG.GWDOMSTP6 stpegs.com>, "Philip Walker"
<plwalker.GWPONASSUR.GWDOMSTP@stpegs.com>, "Robyn Savage
<rdsavage.GWPO_NASSUR.GWDOM_STP@stpegs.com>, "Randall Beverly"
<rlbevery.GWPONENG.GWDOM_STP@stpegs.com>, *Satish Dubey" cskdubey.GWPONENG.GWDOMSTP@stpegs.com>, "Scott Head"
<smhead.GWPONASSUR.GWDOMSTP@ stpegs.com>, "Thomas Jordan"
<tjjordan.GWPO-NENG.GWDOM_STPistpegs.com>, "Ulhas Patil"
<uspatil.GWPO-NENG.GWDOMSTP@stpegs.com>, William Mookhoek"
<wemookhoek.GWPONASSUR.GWDOMSTP@stpegs.com>, "William Bealefield, Jr."
<wrbealefield.GWPO_BSYSTMS.GWDOMSTP @stpegs.com>, <richard-balcomrtxgenco.com>
Date: 7/1/03 11:46AM
Subject:
Revised RAI for RR-ENG-2-35 The attached revised response to the NRC RAI on our boat sample relief request was submitted to the NRC today. Inthis response we state that the next ISI VT-3 visual examination of the repaired BMI J-groove welds will be augmented with an enhanced visual examination of the boat sample cavities.
Pag akkhosla.GWPO_NGEN.GWDOM_STP (Anup Khosla acmcintyre.GWPONENG.GWDOM_STP (Albert M morganlewis.com agutterman mattbran.com jwood cps-satx.com ldblaylock austinenergy.com Andy.Ramirez aep.com cajohnsonl Post Office Route owf4_po.OWFN_13O nrc.gov txgenco.com stpegs.com morganlewis.com mattbran.com cps-satx.com austinenergy.com aep.com Files Size Date & Time MESSAGE 300 07/01/03 11:45AM 03001560 (RR-ENG-2-35 RAI rev).doc 112640 Mime.822 157792 Options Expiration Date: None Priority: Standard Reply Requested: No Return Notification: None Concealed
Subject:
No Security: Standard
Nuclear Operating Company
&7odj TmSfrq'ed kdr&k Gaf S1t6 ta.,r O 252 Ibdsastht Nl'*i77403A July 1, 2003 NOC-AE-03001560 10CFR50.55a U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 South Texas Project Unit I Docket No. STN 50-498 Revised Response to Request for Additional Information Regarding Request for Alternatives RR-ENG-2-35
References:
- 1. Letter, S. E. Thomas to NRC Document Control Desk, "Request for Alternatives to ASME Section XI Requirements Associated with Mechanical Processing of Thermally Cut Surfaces (Relief Request RR-ENG-2-35)," dated June 13,2003 (NOC-AE-03001551)
- 2. Letter, S. E. Thomas to NRC Document Control Desk, "Response to Request for Additional Information Regarding Request for Alternatives RR-ENG-2-35," dated June 26, 2003 (NOC-AE-03001558)
The NRC informally requested additional information regarding the request for alternatives submitted in Reference 1 and the response to that information request was provided in Reference 2. As a result of further telephone discussions with the NRC, STP Nuclear Operating Company (STPNOQC) is hereby revising our response to question 5 as follows:
- 5. Will any Examination be done on this item on an ongoing basis? (Every outage or every other outage, etc.)
Response
The original J-groove weld of the two repaired BMI penetrations has been re-classified under ASME Section XI Code inservice inspection (ISI) requirements as a Class 1,Table IWB-2500- 1,Examination Category B-N-2, Item B 13.60 weld. This weld is an interior attachment to the reactor vessel beyond the core belt region. Accessible interior attachment welds are subject to a VT-3 visual examination of the exposed weld surface under the STPNOC ISI program for the second interval. The VT-3 visual examination of this weld is intended to detect the presence of cracking, corrosion, erosion, or other structural degradation.
STI: 31623459
NOC-AE-03001560 Page 2 of 2 ISI examinations of reactor vessel interior attachment welds below the core belt region will be performed in conjunction with the examinations of the vessel shell and bottom head welds when the internals and core barrel are removed. The next ISI VT-3 visual examination of the repaired BMI J-groove welds will be augmented with an enhanced visual examination of the boat sample cavities.
If there are any questions regarding this revised response, please contact Mr. Michael Lashley at 361-972-7523 or me at 361-972-7162.
Steven E. Thomas Manager, Plant Design Engineering jtc cc:
(paper copy) (electronic copy)
Ellis W. Merschoff A. H. Gutterman, Esquire Regional Administrator, Region IV Morgan, Lewis & Bockius LLP U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 L. D. Blaylock Arlington, Texas 76011-8064 City Public Service U. S. Nuclear Regulatory Commission Mohan C. Thadani Attention: Document Control Desk U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike R. L. Balcom Rockville, MD 20852 Texas Genco, LP Richard A. Ratliff A. Ramirez Bureau of Radiation Control City of Austin Texas Department of Health 1100 West 49th Street C. A. Johnson Austin, TX 78756-3189 AEP Texas Central Company Cornelius F. O'Keefe Jon C. Wood U. S. Nuclear Regulatory Commission Matthews & Branscomb P. O. Box 289, Mail Code: MN1 16 Wadsworth, TX 77483 C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704
T - - -- - - - - - MT --
I C:\TEMPkGWJOOO01.TMP Facie Paie 1 1 I G:\TEMPkGWJOOOO1 .IMP MaIlEnvelopeProperties (3FOlACAD.7D6:12:42966)
Subject:
Revised RM for RR-ENG-2-35 Creation Date: 7/1/03 11:45AM From: "John T Conly " <tconlv@stvegs.com>
Created By: jtconlv@stpegs.com Recipients nrc.gov owf4.po.OWFNtDO MCT (Mohan Thadani) txgenco.com ichard-balcom stpegs.com wrbealefield.GWPO_BSYSTMS.GWDOMSTP (Will wemookhoek.GWPONASSUR.GWDOMSTP (William uspatil.GWPONENG.GWDOMSTP (Ulhas Patil) tijordan.GWPOLNENG.GWDOMSTP (Thomas Jord smhead.GWPONASSUR.GWDOMSTP (Scott Head) skdubey.GWPQNENG.GWDOM_STP (Satish Dubey rlbeverly.GWPONENG.GWDOMSTP (Randall Be rdsavage.GWPO_NASSUR.GWDOM_STP (Robyn Sav plwalker.GWPONASSUR.GWDOM_STP (Philip Wa mslashley.GWPONENG.GWDOMSTP (Michael La mkjohnson.GWPONASSUR.GWDOMSTP (Marilyn mdmeier.GWPO_PLTSVCS.GWDOMSTP (Michael M mmcbumett.GWPONASSUR.GWDOMSTP (Mark M ldallen.GWPONENG.GWDOQSTP (Lewis Allen) kjtaplett.GWPO_NASSUR.GWDOMSTP (Kenneth kawork.GWPONASSUR.GWDOM_STP (Kathleen Wo jtconly.GWPONASSUR.GWDOMSTP (John T Con jsheppard.GWPO_BSYSTMS.GWDOMSTP (James S jrmorris.GWPONASSUR.GWDOMSTP (James Mor jrlovell.GWPONGEN.GWDOM_STP (John Lovell jcyounger.GWPO_NENG.GWDOMSTP (J Craig Yo jaloya.GWPO_NENG.GWDOMSTP (Joe Loya) halpined.GWPONGEN.GWDOMSTP (Ed Halpin) glparkey.GWPO.NGEN.GWDOMSTP (Gary Parkey fhmallen.GWPOBSYSTMS.GWDOMSTP (Frank Ma dlcobb.GWPOBSYSTMS.GWDOMSTP (David Cobb awharrison.GWPONASSUR.GWDOM_STP (Albon H amroberts.GWPONASSUR.GWDOM_STP (Anna Rob