amasAle !on - Spn ulPool Lodngj gatmRI-ehncland Civi EngineiaBranch Pg From:
Thomas Alexion To:
MILLAR, DANA Date:
7124/03 9:38AM
Subject:
Spdnt Fuel Pool Loading Pattern RAI -Mechanical and Civil Engineering Branch
- Dana, See the attached RAI.
Tom
- t. CAW1ND0WS\\TEMP\\GW100001.TMP Pagie 1 1 l:WNOSTM~WOOO TPPn Mail Envelope Properties (3F1FE145.D34: 0:20628)
Subject:
Creation Date:
From:
Created By:
Spent Fuel Pool Loading Pattern RAI -Mechanical and Civil Engineering Branch 7/24/03 9:38AM Thomas Alexion TWA@nrc.aov Recipients entergy.com DMILLAR (MILLAR, DANA)
Action Transferred Date & Time 07/24/03 09:38AM Route entergy.com Post Office Delivered Files Kim.wpd MESSAGE Options Auto Delete:
Expiration Date:
Notify Recipients:
Priority:
Reply Requested:
Return Notification:
Concealed
Subject:
Security:
To Be Delivered:
Status Tracking:
Size 124989 718 Date & Time 07/23/03 03:25PM 07/24/03 09:38AM No None Yes Standard No None No Standard Immediate Delivered & Opened
REQUEST FOR ADDITIONAL INFORMATION MECHANICAL AND CIVIL ENGINEERING BRANCH AMENDMENT REQUEST TO REVISE THE SPENT FUEL POOL LOADING PATTERN ARKANSAS NUCLEAR ONE. UNIT 2 In the amendment request, you are proposing to reduce the fresh fuel assembly initial enrichment limit to less than or equal to 4.55*0.05 weight percent. Indicate whether the total weight of the fuel assemblies supported by the spent fuel racks will increase as a result of the proposed request. If the total weight of the fuel assemblies Is Increased, what are the affects on the spent fuel racks and the spent fuel pool structure due to the increased weight?
- 2.
Lateral motion of the storage racks under postulated seismic conditions could potentially alter the spacing between racks. Indicate whether you have performed a structural rack dynamic analysis to calculate the required spacing between racks for your criticality calculations. If this analysis has been performed, discuss the methodologies and assumptions used for the analysis, and provide a summary of the analysis results. If you have not performed a structural rack dynamic analysis, provide justification as to why the spacing between the racks need not be verified in the revised configuration.