Proposed Tech Specs Re Electrical Power Sys
ML20065K462
Person / Time
Site: Millstone Dominion icon.png
Issue date: 04/12/1994
From:
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20065K460 List:
References
NUDOCS 9404190365
Download: ML20065K462 (9)


Text

. . . .. .. . . . ~

l Docket No. 50-336 B14773 i

Attachment 1 Millstone Nuclear Power Station, Unit No. 2 Proposed Revision to Technical Specifications Electrical Power Systems Marked-up Pages I

i l

l l

April 1994 9404190365 940412 ,

PDR ADOCK 05000336 j p PDR I

, December 89 1978 l

k~

3/4.8 ELECTRICAL POWER SYSTEM 5 3/4.8.1 A.C. SOURCES OPERATING LIMITING CONDITION FOR OPERATION 3.8.1.1 As a n'inimum, the following A.C. electrical power sources shell be OPERABLE:

a. Two physically indeper. dent circuits between the offsite trans-mission network and the switchyard, and
b. Two separate and independent diesel generators each with a separate fuel oil supply tank containing a minimum of 12,000 gallons of fuel.

APPLICABILITY: MODES,1, 2, 3 and 4.

ACTION:

IMsrcr IN Y With either an offsite circuit or diesel generator of the ab

\ equired A.C. electrical power sources inoperable, demons ete t PERASILITY of the remaining A.C. sources by perfo ng Surve ante Requirements 4.6.1.1.1 and 4.8.1.1.2. within one cFj36 hour and t,least once per B hours thereafter; tore at least two offRte circuits and two diesel ge ators to OPERABLE status M thin 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in D SHUTDOWh withir.

the next 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />,

b. With one off:;ite circuit a o iesel generator of the above required A.C. electrical po squrces inoperable, demonstrate the OPERASIL1TY of the r , ining 7b . sources by performing Surveillance Require. ts 4.8.1.1.1 a 4.8.1.1.2.a .2 wi t hi r. chl3f one hour and at 1 t once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> t e(eafter; restore at least one o he inoperable sources to OPER6BLE status within 12 rs or be in COLD SHUTDOWN within thes next 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. ) store at least two offsite circuits and tw diesel gene fors to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from the me of l 1 ial loss or be in COLD SHUTDOWN within the next 36 hou) 5 MILLSTONE - UNIT 2 3/46-1 .

1 I

ueue a,ea ., , , :, :.

ELFCTRICAL POWER SYSTEMS 1, ACTION (Continued)

With two of the above required offsite A.C. circuits inopera demonstrate the OPERABILITY of two diesel generators by one hour peTfoqing Surveillance Requirement 4.8.1.1.2.a.2 wit diesel generators and at leJast once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter, unless t are alreadboperating; restore at least one of inoperable offsite sources to OPIRABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in at least HOT SHUTDOWN within t}iiesnext 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. With y one offsite source restored, restore at teatt two offs 11 circuits to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of init rr loss or be in COLD SHUTDOWN within the next 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

d. With two of the above ired diesel geqerators inoperable, demonstrate the OP LITY of two offsitt'A.C. circuits by performing Surve anceRequirement4.8.1.1.1NQhinonehourandat least once p hours thereafter; restore at leas (one of the inoperabl iesel generators to OPERABLE status withi N hours or be in D SHUTDOWN within the next 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. Restore atsigast tw esel generators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from' time initial 1 css or be in COLD SHUTDOWN within the next 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REOUIREMENTS 4.8.1.1.1 Two physically independent circuits between the offsite transmission network'and the switchyard shall be determined OPERABLE at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying correct breaker alignments and indicated power availability.

4.8.1.1.2 Each diesel generator shall be demonstrated OPERABLE:

a. At least once per 31 days on a STAGGERED TEST 8 ASIS by:
1. Verifying the fuel level in the fuel oil. supply tank,
2. Verifying the diesel starts from ambient condition and accelerates to 2 90% of rated speed and to 197% of rated voltage in s 15 seconds.
3. Verifying the generator is synchronized, loaded to 11300 kw in s 60 seconds, and operates for 160 minutes.

MILLSTONE - UNIT 2 3/4 8-2 Amendment'No. 167 0079

1 l

INSERT A l 1

Proposed' Rewrite of Technical Specification 3.8.1.1 Action Statements

a. With one offsite circuit inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirement 4.8.1.1.1 l within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. If either diesel generator has not been successfully tested within the past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, demonstrate its OPERABILITY by performing Surveillance Requirement 4.8.1.1.2.a.2 separately for each such diesel generator within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Restore the offsite circuit to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
b. With one diesel generator inoperable, demonstrate the OPERABILITY of the A.C. offsite sources by performing Surveillance Requirement 4.8.1.1.1 within I hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; and if the diesel generator became inoperable due to any cause other than preplanned preventative maintenance or testing, demonstrate the OPERABILITY of the remaining OPERABLE diesel generator by performing Surveillance Requirement 4.8.1.1.2.a.2 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> *;

restore the diesel generator to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least H0T STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />,

c. With one offsite circuit and one diesel generator inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirement 4.8.1.1.1 within I hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; and if the diesel generator became inoperable due to any cause other than preplanned preventative maintenance or testing, demonstrate the OPERABILITY of the remaining OPERABLE diesel generator by performing Surveillance Requirement 4.8.1.1.2.a.2 within'8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> *;

restore one of the inoperable sources to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Restore the other A.C.

power source (offsite circuit or diesel generator) to OPERABLE status in accordance with the provisions of Section 3.8.1.1 Action Statement a or b, as appropriate, with the time requirement of that Action Statement based on the time of initial loss of the ' remaining inoperable A.C. power source. A successful test of diesel generator OPERABILITY per Surveillance Requirement 4.8.1.1.2.a.2 performed under this Action Statement for an OPERABLE diesel generator or a restored to OPERABLE diesel generator satisfies the diesel generator test requirement of Action Statement a or b.

d. With two of the required offsite A.C. circuits inoperable, demonstrate the OPERABILITY of two diesel generators by sequentially performing Surveillance Requirement 4.8.1.1.2.a.2 on both diesel generators within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, unless the diesel generators are already operating; restore one of the inoperable offsite sources to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

Following restoration of one offsite source, follow Action Statement a with the time requirement of that Action Statement based on the time of initial loss of the remaining inoperable offsite A.C. circuit. A

  • This test is required to be completed regardl'ess of when the inoperable diesel generator is restored to an OPERABLE status.

successful test (s) of diesel generator OPERABILITY per Surveillance Requirement 4.8.1.1.2.a.2 performed under this Action Statement for the OPERABLE diesel generators satisfies the diesel generator test requirement of Action Statement a.

e. With two of the above required diesel generators inoperable, demonstrate the OPERABILITY of two offsite A.C. circuits by performing Surveillance Requirement 4.8.1.1.1 within I hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore one of the inoperable diesel generators to a OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SliUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. 1 Following restoration of one diesel generator unit, follow Action i Statement b with the time requirement of that Action Statement based on l the time of initial loss of the remaining inoperable diesel generator.  !

A successful test of diesel generator OPERABILITY per Surveillance l Requirement 4.8.1.1.2.a.2 performed under this Action Statement for a j restored to OPERABLE diesel generator satisfies the diesel generator test requirement of Action Statement b.

l l

l l

l l

)

l l

l

__,.-.m_-__._.-m_._._._....._._____...___._._..__...___. . . . _ . _ _ _ _ . . . _ _ _ _ _ _ . ~ _ _ _ . _ . - . . -

4 1

. Docket No. 50-336 B14773 f

4 i

i 4

! t i

Attachment 2 Millstone Nuclear Power Station, Unit No. 2

! Proposed Revision to Technical Specifications l Electrical Power Systems Retyped Pages-I i

i h

i i

! 2 l

l I

i April 1994 o

I

3/4.8 ELECTRICAL POWER SYSTEMS 314 8.1 'A.C. SOURCES OPERATING LIMITING CONDITION FOR OPERATION 3.8.1.1 As a minimum, the following A.C. electrical power sources shall be OPERABLE:

a. Two physically independent circuits between the offsite trans-mission network and the switchyard, and
b. Two separate and independent diesel generators each with a separate fuel oil supply tank containing a minimum of 12,000 gallons of fuel.

APPLICABILITY: MODES, 1, 2, 3 and 4.

ACTION:

a. With one offsite circuit inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirement 4.8.1.1.1 within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. If either diesel generator has not been successfully tested within the past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, demonstrate its OPERABILITY by performing Surveillance Requirement 4.8.1.1.2.a.2 separately for each such diesel generator within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Restore the offsite circuit to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least il0T STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

b. With one diesel generator inoperable, demonstrate the OPERABILITY of the A.C. offsite sources by performing Surveillance Requirement 4.8.1.1.1 within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; and if the diesel generator became inoperable due to any cause other than preplanned preventative maintenance or testing, demonstrate the OPERABILITY of the remaining OPERABLE diesel generator by performing Surveillance Requirement 4.8.1.1.2.a.2 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> *; restore the diesel generator to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SilVIDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
  • This test is required to be completed regardless of when the inoperable diesel generator is restored to an OPERABLE status.

MILLSTONE - UNIT 2 3/4 8-1 Amendment No.

0101

I f1ECTRICAL POWER SYSTEMS  !

l ACTION (Continued)

c. With one offsite circuit and one diesel generator inoperable, 1 demonstrate the OPERABILITY of the remaining A.C. sources by performing l Surveillance Requirement 4.8.1.1.1 within I hour and at least once per  !

8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; and if the diesel generator became inoperable due ,

to any cause other than preplanned preventative maintenance or testing, '

demonstrate the OPERABILITY of the remaining OPERABLE diesel generator by performing Surveillance Requirement 4.8.1.1.2.a.2 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> *;

restore one of the inoperable sources to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Restore the other A.C.

power source (offsite circuit or diesel generator) to OPERABLE status in accordance with the provisions of Section 3.8.1.1 Action Statement a or b, as appropriate, with the time requirement of that Action Statement based on the time of initial loss of the remaining inoperable i A.C. power source. A successful test of diesel generator OPERABILITY  !

per Surveillance Requirement 4.8.1.1.2.a.2 performed under this Action Statement for an OPERABLE diesel generator or a restored to OPERABLE diesel generator satisfies the diesel generator test requirement of Action Statement a or b.

d. With two of the required offsite A.C. circuits inoperable, demonstrate the OPERABILITY of two diesel generators by sequentially performing Surveillance Requirement 4.8.1.1.2.a.2 on both diesel generators within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, unless the diesel generators are already operating; restore one of the inoperable offsite sources to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

Following restoration of one offsite source, follow Action Statement a with the time requirement of that Action Statement based on the time of initial loss of the remaining inoperable offsite A.C. circuit. A successful test (s) of diesel generator OPERABILITY per Surveillance Requirement 4.8.1.1.2.a.2 performed under this Action Statement for the OPERABLE diesel generators satisfies the diesel generator test requirement of Action Statement a.

e. With two of the above required diesel generators inoperable, j demonstrate the OPERABILITY of two offsite A.C. circuits by performing Surveillance Requirement 4.8.1.1.1 within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per ,

8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore one of the inoperable diesel generators to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

Following restoration of one diesel generator unit, follow Action Statement b with the time requirement of that Action Statement based on I the time of initial loss of the remaining inoperable diesel generator. l A successful test of diesel generator OPERABILITY per Surveillance j Requirement 4.8.1.1.2.a.2 performed under this Action Statement for a i restored to OPERABLE diesel generator satisfies the diesel generator i test requirement of Action Statement b. 1 MILLSTONE - UNIT 2 3/4 8-2 Amendment No. #/

0101

SURVEILLANCE REQUIREMENTS 4.8.1.1.1 Two physically independent circuits between the offsite transmission network and the switchyard shall be determined OPERABLE at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying correct breaker alignments and indicated power availability.

4.8.1.1.2 Each diesel generator shall be demonstrated OPERABLE:

a. At least once per 31 days on a STAGGERED TEST BASIS by:
1. Verifying the fuel level in the fuel oil supply tank,
2. Verifying the diesel starts from ambient condition and accelerates to 1 90% of rated speed and to 1 97% of rated voltage in s 15 seconds.
3. Verifying the generator is synchronized, loaded to 21300 kw in s 60 seconds, and operates for 1 60 minutes. .

l l

I l

MILLSTONE - UNIT 2 3/4 8-2a Amendment No. l 0101 l