IR 05000263/2003008

From kanterella
Revision as of 23:30, 19 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
IR 05000263-03-008(DRS); on 10/06/03 - 10/10/03; for Monticello Nuclear Generating Plant; Ti 2515/148, Revision 2, Verification of Compliance with Interim Compensatory Measures Order
ML033630688
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 12/29/2003
From: Pederson C
Division of Reactor Safety III
To: Thomas J. Palmisano
Nuclear Management Co
References
IR-03-008
Download: ML033630688 (5)


Text

ber 29, 2003

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT NRC SAFEGUARDS INSPECTION OF COMPLIANCE WITH ORDER INSPECTION REPORT 05000263/2003008(DRS)

Dear Mr. Palmisano:

On October 10, 2003, the NRC completed an inspection at your Monticello Nuclear Generating Plant. The enclosed report documents the inspection findings which were discussed on October 10, 2003, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to public health and safety, the common defense and security, and to compliance with the Commissions regulations, orders, and the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material will not be placed in the Public Document Room.

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter, without enclosure, will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Enclosure Contains Upon Separation This Page is Decontrolled Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Cynthia D. Pederson, Director Division of Reactor Safety Docket No. 50-263 License No. DPR-22 Enclosure: Inspection Report 05000263/2003008(DRS);

( )

cc w/encl ( ):

E. McNeil, (NSIR/DNS/RSS)

B. Westreich, (NSIR/DNS)

cc w/encl w/o :

J. Cowan, Executive Vice President and Chief Nuclear Officer Manager, Regulatory Affairs J. Rogoff, Esquire, Vice President, Counsel and Secretary Nuclear Asset Manager, Xcel Energy, Inc.

Commissioner, Minnesota Department of Health R. Nelson, President Minnesota Environmental Control Citizens Association (MECCA)

Commissioner, Minnesota Pollution Control Agency D. Gruber, Auditor/Treasurer, Wright County Government Center Commissioner, Minnesota Department of Commerce Manager - Environmental Protection Division Minnesota Attorney Generals Office Enclosure Contains