LER 82-024/03L-0:on 820606,120-volt Ac (VIAC-1) Lost Causing Power Fuses to Blow in Facility I ESAS Cabinet.Caused by Roof Leak Resulting from Heavy Rains Allowing Water to Enter Top of Inverter & Shorting Circuitry.Water Shield Installed
ML20055A938
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/06/1982
From: Deslandes K
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20055A933 List:
References
LER-82-024-03L, LER-82-24-3L, NUDOCS 8207200148
Download: ML20055A938 (1)


LER-2082-024,
Event date:
Report date:
3362082024R00 - NRC Website

text

NRC QR A8 E6 U S. NUCLE AR REGULATORY COYMISSION (7 77)

LICENSEE EVENT REPORT CONTROL BLOCK: l 1

l l l l l lh 6

(PLE ASE PRINT OR TYPE ALL REQUIRED INFORMATloN) o i l Cl Tl MI NI Sl 2l@l 0101 -l 0 LICENSEl0 lo NuveER 1010 l- 101025l@l4 26 l1LICENSE l111TYPE l1JOl@l$7 CAT i 56 Ig 7 8 9 LICENSEE CODE 14 15 COYT lol'1 7 8 Z:TE 60LLl@l015101 61 o I o i 3131668 l@l DOCKET NUVBER 69 0161016 EVENT DATE l a l 2 @l0171016 74 75 REPORT DATEl8 l283l@

EVENT DESCRIPTloN AND PROB ABLE CONSEQUENCES h lo 121 l During routine steady state operations,120 volt AC (VIAC-1) was lost. The loss of I

[ o 13 l l VIAC-1 caused the power fuses to blow in Facility I ESAS cabinet. The, plant operated l Io p1 l ni accordance with Technical Specifications 3.8.2.1 and 3.3.2.1. VIAC-1 was deener- 1 I o I s 1 I gized for approximately 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. The facility I ESAS cabinet was deenergized for l lo ic l l approximately 61/2 hours. Similar occurrences: None. The inverter is a Solid State l l o l 71 l Controls Inc. ; Model SV 12150/TS-150 NB. I I

l o is i l

' '" ^"'

CODE CODE SUB ODE COMPONENT CODE SUBC DE S E O 9 l E l D l@ [C_j@ [Z_J @ l G l E l N l E l R l A l@ [F_J@20 U @

7 8 9 10 11 12 13 18 19 SEQUENTI AL OCCURRENCE REPORT RE VISION E REPORT NO. CODE TYPE No.

LER RO

@ ,agg l VENT

_ 21 8l 2] YE[---J 22 23 AR l 01214l 24 26 M

27 1013l N a lL l 3C

[.31 -]

[0_]

32 AKEN A ON PL NT MET HOURS FOR 8. SUPPLIE R MANUFAC UAER LB_j@[F_j@

33 34 lBl@

3b L.Zj@

M l0l01010I 37 43 LNJ@

41

[_Y.j@

42 lNl@

43 lSl2l5l0l@

M 47 CAUSE oESCRIPTION AND CORRECTIVE ACTIONS l3ioi lA roof leak resulting from abnormally heavy rains allowed water to enter the top of l 3 i i the inverter, shorting the circuitry. The alternate 120 volt AC source was unavailablei j,i,ijat the time. The inverter was inspected and wetted components corrected. The Facility;

, 3 l I ESAS cabinet fuses were replaced when VIAC-1 was restored. A water shield has been l ii id i l installed for inverters 5 and 6. I STA $  % POWE R OTHER ST ATUS Dis O RY DISCOVERY DESCRIPTION NA Operator observation I t Is l LEJ@ l1 l0 l 0l@l l lAl@l l ACTIVITY CO TENT QELE ASED OF RELE ASE AMOUNT OF ACTivlTY LOC ATION OF RELE ASE NA l 1 6 [_Z_j @ LZj@l NA l l 45 80 7 8 9 to 11 44 PE RSONNE L E XPOSURES NUYBE R TYPE i 7 l 0 l 0 l 0 l@l 2 l@ l DESCRIPTION NA l

PERsONNttiN;UWiEs NuveER OtSCRiPTiON@

7 1 H 8 9 l0l0l0l@l 11 12 NA 80 l

T PE DESCR PTION 7

1 9 6 9

@ 10 NA 80 l

Pue ocity 8207200148 820706 N AC USE ON LY

  • issaE D D E SC RiPTION PDR ADOCK 05000336 .

8 LN_J@l S PDR I IIlIIIIIIIIIII 7 8 9 10 66 69 80 5 NAYE OF PREPAAER Keith D. Deslandes psoys 447-1791 (4421) E,