LER 82-066/03L-0:on 820602,steam Driven Auxiliary Feed Pump Started Automatically Due to Failure of Time Delay Relay Coil.Caused by Open Circuit in Coil.Defective Relay Replaced
ML20054L637
Person / Time
Site: Surry Dominion icon.png
Issue date: 06/28/1982
From: Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20054L628 List:
References
LER-82-066-03L, LER-82-66-3L, NUDOCS 8207080317
Download: ML20054L637 (3)


LER-2082-066,
Event date:
Report date:
2802082066R00 - NRC Website

text

N AC 8 OIY 36t>

  • U. S. NUCLEAM stEGULATonY COMMISSION
7,T77 LICENSEE EVENT REPORT CONTROL BLOCK
l n

l 'l l l Idh 4 (PLEASE PRIMf OR TYPE ALL REQUIRED INFORMATIONI lo 14 1 l vi uCassiAl SlCoci Pl Sl 1]@l 010 l-l 0uCl ~sa~u-.ia

i. is 0 l 0101 Ol -l 01 a 0l@ a 411111soIl 1]@l uC ~si T,,, 1 l

mg l

C CN **

lei,1 M'*/C; 11. )@lo i s 10 t o 10 ! 21 s i o l@loEvf16NT to 12 l ato12 76l@l mgPCRT of 61DATE 2 8 9 :1@ So 4 4e $b CQCKET NUM0 g m 68 49 DATg EVENT DESCAIPTION AND PROBABLE CONSEQUENCES h I e ! : ! l on June 2. 1982 with unit one at full never. a time doinv relav failed. This I__

lol36 I started the ntenm driven nuv. feed nn-n nnd cloned the outside S.C blowdnen trin f ,

lo !a l l valves. A jumper was placed in the circuit whi h resulted in defeating the auto l lo !si i start for the steam driven A.F.P on a station service undervoltare condition. Thist_

I o is 1 1 is contrary t o T.S.3.6.C and is reportable per T.S.6.6.2.b.'(3) . The redundant I joi,l l train for this function and the auto start of the motor driven pumps, remained l Ioisit unaffected. Therefore, the health and safety of the public were not affected. so 7 se .

COUP. VALvt

$YSTIM cay $( CAUSE CCOE CCOE SUSCCDE COMPONENT CODE SueCODE SusCCOE lo49] l11 l H,j @ W@ l A l@ l R l F. l L l A l Y l Xl@ y@ lZ l @ i. ,o

> . . io ii 32 is i.

SEQUENTIAL CCCURRENCE REPORT REV'8 ION t'/ENTvtam atPORT NO. CODE Tvrt NC.

L

@ ,a'E ,gg mimoisi21 1-1 lo16I6l 12J l ol 31 11.1 1, 1 Iol 2i n u 2. n n n a u a n T K N A ON CN P T M MOUR$ $$ 1 POR $. $U '

MANU8A MER La.J@Lz.J@ Iz l@ Izl@ lo IoI oI oI LY.J@ lN l@ lNl@ lA a

l1 l0 l9 l@

n xs as a >> ao si s2 as ai CAUSE DESCRIPTION AND COARECTIVE ACTIONS IieoIlThe failure of the relav has been attributed to an open circuit in its coil. The I ii ii1ifailure of the iumner tn defent the rimo delnv nortion of the circuit eniv hns beeni Iii2I lattributed to n misinterpretation of the circuit dinernm. The operation of the l li,3l 1 steam driven AFP was placed under administrative control and the time delay relay l ,

I i i . I l wa s replaced and the inmper was renoved. I so 7 ee

% Powtm OTwEm $7ATUS I O RV DISCCvtRY DEsCmiPTION

IiI5I d @ gl1lolol@l N/A l lAl@l Operator Observation so l

j 7

eg 12 si 44 as .e c La Asso c. a:LrAse Location o, n L Asa@

li is 'I 'W @ l z l@l AuouNT N/A on AeriviTv l

@N/Al

  • l einso~~s =,os " es 4

~m.... -., o.,0...m o~ @

li 171 I nl of ol@[.L,@l l N/A i

. .so~~i ' wu%es Nuvete CesCRietic~h f i irj l 01 01 01@l N/A eo l

. . >> i2

' Css 08 CR DauAGE TO 8AC LITY

.Tv'E OtsCRieTION I'19i d @l

.N/A '

I

' eveuETv 8207000317 820628 , N AC USE ONLY l issure PDR ADOCK 05000250 lt ;;;;Ii;IIrl; I C3 i$ C l l NI@cascai wo~@

7 l

io S PDR. l 68 69 So ~

y A..t o. .o 5. . .p J. I.. Wilson, .yg. (804) 357-3184  :

I

ATT CHMENT 1 (PAGE 1 0F 2)

SURRY POWER STATION, UNIT NO. 1 DOCKET NO: 50-280 REPORT NO: 82-066/03L-0 EVENT DATE: 06-02-82 TITLE OF Tile EVENT: Defeat of Auto Start of Steam Driven Aux. Feed Pump

1. DESCRIPTION OF EVENT:

On June 2,1982 with Unit One at full power, a time delay relay coil (Agastat 2BAFP) failed. The time delay relay is in a reactor protection circuit which upon a station service undervoltage condition closes the outside steam generator blowdown trip valves (TV-BD-100B, D, E) and opens one of two redundant steam supply valvec (PCV-MS-102B) to the steam driven aux. feed pump. Since the relay is in a de-energize to function circuit, it performed its intended function when it failed.

4 In order to stop the unnecessary operation forthe aux, feed pump turbine, an isolation l valve (1-MS-196) upstream of the steam supply valves was closed and placed under administrative control. In an attempt to bypass the defective relay, and thus only defeat the time delay portion of the circuit, a jumper was placed across the relay contacts. This allowed the steam supply valve to be closed and the blowdown trip valves to be opened. The steam isolation valve was reopened and administrative con- .

trol was removed from the operation of the steam driven aux. feed pump.

Approximately 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> af ter the jumper was installed, it was discovered that the jumper had defeated one train of the automatic start of the steam driven aux. feed pump on a station service undervoltage condition. This is contrary to T.S. 3.b.C and is reportable per T.S.6.6.2.b.(3).

2. PROBABLE CONSEQUENCES:

l The automatic start of the steam driven aux. feed pump upon a station service under-voltage condition insures adequate heat removal from the core. The redundant train for this function and the automatic start for the 2/3 steam generator low level condition remained unaffected. Also, the motor driven aux. feed pumps were available.

Therefore, the health and safety of the public were not affected.

l

! 3. CAUSE:

l The time delay relay failure has been attributed to an open circuit in its coil. i i The unsuccessful attempt to only defeat the time delay portion of the circuit with the jumper has been attributed to a misinterpretation of the circuit diagram.

4. IMMEDIATE CORRECTIVE ACTION:

The operation of the blowdown trip valves and steam driven aux. feed pump was placed t under administrative control and replacement of the defective relay was initiated.  !

i I

50 SUBSEQUENT CORRECTIVE ACTION:

The defective rclay was repaired and tested satisfactorily and the jumper was removed  !

within the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Tech. Spec. 11mit I

i l

i L

,. O ATTACllMENT 1 (PAGE 2 0F 2)

SURRY POWER STATION, UNIT NO. 1 DOCKET NO: 50-280 REPORT NO: 82-066/03L-0 EVE?1T DATE: 06-02-82 TITLE OF Tile EVENT: Defeat of Auto Start of Steam Driven Aux. Feed Pump

6. ACTION TAKEN TO PREVENT RECURRENCE:

Nonc 70 CENERIC IMPLICATIONS:

None.