Monthly Operating Repts for June 1998 for Surry Power Station,Units 1 & 2
ML18152B762
Person / Time
Site: Surry  Dominion icon.png
Issue date: 06/30/1998
From: Pincus J, Slade D, Steinert J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
98-388, NUDOCS 9807140024
Download: ML18152B762 (16)


Text

e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 July 7,1998 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT Serial No.

SPS Lie/JCS Docket Nos.

License Nos.98-388 RO 50-280 50-281 DPR-32 DPR-37 The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of June 1998, is provided in the attachment.

If you have any questions or require additional information, please contact us.

Very truly yours, E. S. Grecheck, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc:

U.S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth Street, S. W.

Suite 23T85 Atlanta, Georgia 30303 Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station

,~~---9-8_0_7_1_40_0_2_4_9_8_0_6_3_0 __ :~,,---1 PDR ADOCK 05000280:

  • I R

PDR

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 98-06 Approved:

Date

TABLE OF CONTENTS Section e,urry Monthly Operating Report No. 98-06 Page 2 of 15 Page Operating Data Report - Unit No. 1............................................................................................................................ 3 Operating Data Report - Unit No. 2............................................................................................................................4 Unit Shutdowns and Power Reductions - Unit No. 1.................................................................................................. 5 Unit Shutdowns and Power Reductions - Unit No.* 2.................................................................................................. 6 Average Daily Unit Power Level - Unit No. 1.............................................................................................................. 7 Average Daily Unit Power Level - Unit No. 2.............................................................................................................. 8 Summary of Operating Experience - Unit Nos. 1 and 2............................................................................................. 9 Facility Changes That Did Not Require NRC Approval............................................................................................ 10 Procedure or Method of Operation Changes That Did Not Require NRC Approval................................................. 11 Tests and Experiments That Did Not Require NRC Approval.................................................................................. 12 Chemistry Report..................................................................................................................................................... 13 Fuel Handling - Unit Nos. 1 and 2............................................................................................................................ 14 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications....................................................................................................................... 15

1.
2.
3.
4.
5.
6.
7.

OPERATING DATA REPORT Unit Name:............................................................

Reporting Period:..................................................

Licensed Thermal Power (MWt):..........................

Nameplate Rating (Gross MWe):..........................

Design Electrical Rating (Net MWe):....................

Maximum Dependable Capacity (Gross MWe):....

Maximum Dependable Capacity (Net MWe):........

Surry Unit 1 June, 1998 2546 847.5 788 840 801 9surry Monthly Operating Report No. 98-06 Page 3 of 15 Docket No.:

Date:

Completed By:

Telephone:

50-280 07/01/98 D. L. Slade (757) 365-2246

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe):

10.

Reasons For Restrictions, If Any:

This Month Year-To-Date Cumulative

11.

Hours in Reporting Period 720.0 4343.0 223727.0

12.

Hours Reactor Was Critical 720.0 3672.6 157698.4

13.

Reactor Reserve Shutdown Hours 0.0 0.0 3774.5

14.

Hours Generator On-Line 720.0 3639.9 155239.4

15.

Unit Reserve Shutdown Hours 0.0 0.0 3736.2

16.

Gross Thermal Energy Generated (MWH) 1832570.1 9222923.8 365467939.4

17.

Gross Electrical Energy Generated (MWH) 607947.0 3078686.0 119894440.0

18.

Net Electrical Energy Generated (MWH) 586729.0 2975719.0 114209940.0

19.

Unit Service Factor 100.0%

83.8%

69.4%

20.

Unit Availability Factor 100.0%

83.8%

71.1%

21.

Unit Capacity Factor (Using MDC Net) 101.7%

85.5%

65.6%

22.

Unit Capacity Factor (Using DER Net) 103.4%

87.0%

64.8%

23.

Unit Forced Outage Rate 0.0%

10.8%

14.7%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling, October 19, 1998, 35 Days

25.

If Shut Down at End of Report Period, Estimated Date of Start-up:

26.

Unit In Test Status (Prior to Commercial Operation):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION FORECAST ACHIEVED

1.
2.
3.
4.
5.
6.
7.

OPERATING DATA REPORT Unit Name:............................................................

Reporting Period:..................................................

Licensed Thermal Power (MWt):..........................

Nameplate Rating (Gross MWe):..........................

Design Electrical Rating (Net MWe):....................

Maximum Dependable Capacity (Gross MWe):....

Maximum Dependable Capacity (Net MWe):........

Surry Unit 2 June, 1998 254(?

847.5 788 840 801 9surry Monthly Operating Report No. 98-06 Page 4 of 15 Docket No.:

Date:

Completed By:

Telephone:

50-281 06/02/98 D. L. Slade (757) 365-2246

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe):

10.

Reasons For Restrictions, If Any:

This Month Year-To-Date

11.

Hours in Reporting Period 720.0 4343.0

12.

Hours Reactor Was Critical 720.0 4343.0

13.

Reactor Reserve Shutdown Hours 0.0 0.0

14.

Hours Generator On-Line 720.0 4343.0

15.

Unit Reserve Shutdown Hours 0.0 0.0

16.

Gross Thermal Energy Generated (MWH) 1821327.0 11041635.5

17.

Gross Electrical Energy Generated (MWH) 605605.0 3691565.0

18.

Net Electrical Energy Generated (MWH) 584617.0 3569800.0

19.

Unit Service Factor 100.0%

100.0%

20.

Unit Availability Factor 100.0%

100.0%

21.

Unit Capacity Factor (Using MDC Net) 101.4%

102.6%

22.

Unit Capacity Factor (Using DER Net) 103.0%

104.3%

23.

Unit Forced Outage Rate 0.0%

0.0%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None

25.

If Shut Down at End of Report Period, Estimated Date of Start-up:

26.

Unit In Test Status (Prior to Commercial Operation):

FORECAST INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION ACHIEVED Cumulative 220608.0 155493.3 328.1 153476.5 0.0 362575202.8 118817173.0 113212951.0 69.6%

69.6%

65.6%

65.1%

11.6%

e

-Surry Monthly Operating Report No. 98-06 Page 5 of 15 UNIT SHUTDOWN AND POWER REDUCTION (1)

Date Type (1)

F:

Forced S:

Scheduled (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: June, 1998 (2)

(3)

(4)

Method Duration of LER No.

System Hours Reason Shutting Code Down Rx None During the Reporting Period (2)

REASON:

A -

Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction Docket No.:

50-280 Unit Name:

Surry Unit 1 Date:

07/03/98 Completed by:

J. R. Pincus Telephone:

(757) 365-2863 (5)

Component Code (3)

METHOD:

Cause & Corrective Action to Prevent Recurrence 1 -

Manual 2 -

Manual Scram 3 -

Automatic Scram 4 -

Other (Explain)

E Operator Training & Licensing Examination F

Administrative G

Operational Error (Explain)

(4)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)

(5)

Exhibit 1 - Same Source

tltsurry Monthly Operating Report No. 98-06 Page 6 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: June, 1998 (1)

(2)

(3)

(4)

Method Docket No.:

50-281 Unit Name:

Surry Unit 2 Date:

07/03/98 Completed by: J. R. Pincus Telephone:

(757) 365-2863 (5)

Duration of LER No.

System Component Cause & Corrective Action Date Type 06/02/98 F

(1)

F:

Forced S:

Scheduled (4)

Hours Reason Shutting Code Down Rx 15H 8M A

N/A N/A SB (2)

REASON:

A -

Equipment Failure (Explain)

B -

Maintenance or Test C -

Refueling D -

Regulatory Restriction E -

Operator Training & Licensing Examination F -

Administrative G -

Operational Error (Explain)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)

Code to Prevent Recurrence V

Failed closure spring retaining bolt on a Main Steam Governor Valve (3)

METHOD:

1 -

Manual 2 -

Manual Scram 3 -

Automatic Scram 4 -

Other (Explain)

(5)

Exhibit 1 - Same Source

MONTH:

June, 1998 Day 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 INSTRUCTIONS 9surry Monthly Operating Report No. 98-06 Page 7 of 15 AVERAGE DAILY UNIT POWER LEVEL Average Daily Power Level (MWe - Net)

Day 813 17 817 18 818 19 818 20 818 21 818 22 820 23 820 24 820 25 821 26 821 27 820 28 820 29 820 30 818 31 818 Docket No.:

50-280 Unit Name:

Surry Unit 1 Date:

07/03/98 Completed by:

J C. Steinert Telephone:

(757) 365-2837 Average Daily Power Level (MWe - Net) 817 815 808 797 802 813 814 814 813 811 801 815 815 814 On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

MONTH:

June, 1998 Day 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 INSTRUCTIONS

.urry Monthly Operating Report No. 98-06 Page 8 of 15 AVERAGE DAILY UNIT POWER LEVEL Average Daily Power Level (MWe - Net)

Day 816 17 650 18 823 19 824 20 821 21 822 22 823 23 823 24 823 25 798 26 821 27 821 28 820 29 821 30 821 31 815 Docket No.:

50-281 Unit Name:

Surry Unit 2 Date:

07/03/98 Completed by:

J. C. Steinert Telephone:

(757) 365-2837 Average Daily Power Level (MWe - Net) 818 817 818 817 814 813 812 811 809 805 809 811 812 810 On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

SUMMARY

OF OPERA TING EXPERIENCE MONTHNEAR: June, 1998

.urry Monthly Operating Report No. 98-06 Page 9 of 15 The following chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.

UNIT ONE:

06/01/98 06/30/98 UN1rTwo:

06/01/98 06/02/98 06/02/98 06/02/98 06/02/98 06/30/98 0000 2400 0000 0618 1400 1845 2210 2400 Unit operating at 100% power, 850 MWe.

Unit operating at 100% power, 845 MWe.

Unit operating at 100% power, 845 MWe.

Commenced ramp, Unit at 100% power, 850 Mwe.

Stopped ramp, Unit at 63% power, 540 Mwe.

Commenced ramp, Unit at 63.5% po:wer, 545 Mwe.

Stopped ramp, Unit at 100% power, 852 Mwe.

Unit operating at 100% power, 845 MWe.

I-DCP 88-37-1 DCP 88-38-2 DCP 93-063 FS 98-11 TM S2-98-03 SE 98-067 e


~

.urry Monthly Operating Report No. 98-06 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL Page 10 of 15 MONTHNEAR: June, 1998 Design Change Package (Safety Evaluation 90-189) 06/17/98 DCP 88-37, "ASME Section XI Pump Instrumentation," mounted the ASME Section XI instrumentation off of the process lines or equipment and replaced some instrumentation as needed with more accurate instruments on Unit 1. This eliminated vibration to the instrumentation.

Pressure and flow instrumentation was added to certain pumping systems to facilitate ASME Section XI testing.

Design Change Package (Safety Evaluation 91-012) 06/29/98 DCP 88-38, "ASME Section XI Pump Instrumentation," mounted the ASME Section XI instrumentation off of the process lines or equipment and replaced some instrumentation as needed with more accurate instruments on Unit 2. This eliminated vibration to the instrumentation.

Pressure and flow instrumentation was added to certain pumping systems to facilitate ASME Section XI testing.

Design Change Package (Safety Evaluation 94-171) 06/09/98 DCP 93-063, "Miscellaneous Permanent Shielding Installation/ Surry 1&2," installed lead shielding on various hot spots in the Auxiliary Building for Units 1 &2 to reduce radiation exposure when performing work in the areas.

UFSAR Change Request (Safety Evaluation 98-065) 06/11/98 UFSAR Change Request FS 98-11 supports an update to the description of the feedwater temperature reduction event to be consistent with a new analysis of record. The analysis includes evaluations of different initiating events that can cause a sudden reduction in feedwater temperature.

Temporary Modification (Safety Evaluation 98-066A) 06/12/98 Temporary Modification S2-98-02 installed a Passive Autocatalytic Recombiner in the Unit 2 Containment to maintain the containment Hydrogen concentration less than the design basis limit of 0.8%.

Safety Evaluation 06/25/98 Safety Evaluation 98-067 was performed to assess containment integrity with use of an isolation valve to isolate leak-by from the Unit 2 pressurizer vent valves that was resulting in increased containment hydrogen concentration.

2-0P-TM-005 O-MOP-GW-001 O-ECM-2202-02 O-ECM-2202-03 VPAP-2201 e Surry Monthly Operating Report No. 98-06 Page 11 of 15 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHIYEAR:June, 1998 Operating Procedure (Safety Evaluation 98-063) 06/09/98 Operating Procedure 2-0P-TM-005, "Unit Ramping Operations," was changed to provide a

  • method of repair for the Main Turbine #2 Governor Valve that involved power reduction and an alternate method of closing the valve.

Maintenance*Operating Procedure (Safety Evaluation 98-064) 06/11/98 Maintenance Operating Procedure O-MOP-GW-001, "Purging The Outer Tank For 1-GW-TK-1A," was used to procedurally control a temporary modification to purge the outer Waste Gas Decay Tank to allow for maintenance.

Electrical Corrective Maintenance Procedure (Safety Evaluation 97-151, Rev. 1) 06/22/98 Electrical Corrective Maintenance Procedures O-ECM-2202-02, "Reserve Station Service Transformer (RSST) A LCT' Controller Testing With Transformer In Service," and O-ECM-2202-03, "Reserve Station Service Transformer (RSST) B LCT Controller Testing With Transformer In Service," were used to procedurally control a temporary modification to isolate the Automatic Load Tap Changer to enable its removal from service for calibration and to check the required setpoints.

Virginia Power Administrative Procedure (Safety Evaluation 98-068) 06/25/98 Virginia Power Administrative Procedure VPAP-2201, "Nuclear Plant Chemistry Program,"

was revised to ensure that the program is current with the latest industry good practices as recognized in the EPRI chemistry guidelines and to incorporate recent Surry UFSAR revision.

.urry Monthly Operating Report No. 98-06 Page 12 of 15 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTHIYEAR:June, 1998 None During the Reporting Period

e CHEMISTRY REPORT MONTH/YEAR: June, 1998 Unit No. 1 Primary Coolant Analysis Max.

Min.

Avg.

Gross Radioactivity, µCi/ml 4.09E-1 2.92E-1 3.38E-1 Suspended Solids, ppm so.010 so.010 so.010 Gross Tritium, µCi/ml 1.34E-1 3.86E-2 8.56E-2 1131, µCi/ml 1.00E-2 1.82E-3 5.11 E-3 1131 ;1133 0.75 0.26 0.48 Hydrogen, cc/kg 40.4 35.2 38.0 Lithium, ppm 2.33 1.99 2.13 Boron - 10, ppm*

77.2 56.4 65.1 Oxygen, (DO), ppm s0.005 s0.005 s0.005 Chloride, ppm 0.002 so.001 so.001 pH at 25 degree Celsius 7.33 7.15 7.24 Boron - 10 = Total Boron x 0.196 Comments:

None

.urry Monthly Operating Report No. 98-06 Page 13 of 15 Unit No. 2 Max.

Min.

Avg.

1.70E-1 1.24E-1 1.45E-1 so.010 so.010 so.010 8.98E-1 7.31 E-1 7.97E-1 5.33E-5 3.40E-5 4.30E-5 0.09 0.06 0.07 41.9 36.9 39.4 2.34 2.06 2.22 173.8 152.3 162.7 s0.005 s0.005 s0.005 0.005 0.002 0.003 6.78 6.60 6.70

New Fuel Shipment or Cask No.

FUEL HANDLING UNITS 1 & 2 MONTHIYEAR:June, 1998 Number of Date Stored or Assemblies Received per Shipment Assembly Number ANSI Number None During the Reporting Period

.urry Monthly Operating Report No. 98-06 Page 14 of 15 Initial Enrichment New or Spent Fuel Shipping Cask Activity

erry Monthly Operating Report No. 98-06 Page 15 of 15 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTHIYEAR:June, 1998 None During the Reporting Period