Monthly Operating Repts for Sept 1998 for Surry Power Station Units 1 & 2.With
ML18152B688
Person / Time
Site: Surry  Dominion icon.png
Issue date: 09/30/1998
From: Grecheck E, Slade D
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
98-610, NUDOCS 9810160207
Download: ML18152B688 (16)


Text

e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 October 12, 1998 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT Serial No.

SPS Lie/JCS Docket Nos.

License Nos.98-610 RO 50-280 50-281 DPR-32 DPR-37 The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of September 1998, is provided in the attachment.

If you have any questions or require additional information, please contact us.

Very truly yours, E. S. Grecheck, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc:

U.S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth Street, S. W.

Suite 23T85 Atlanta, Georgia 30303

1. C JC ::~, :?J Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station 9810160207 980930 PDR ADOCK 05000280 R

PDR

e VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERA TING REPORT REPORT No. 98-09 Approved:

Date

e TABLE OF CONTENTS Section

-urry Monthly Operating Report No. 98-09 Page 2 of 15 Page Operating Data Report - Unit No. 1............................................................................................................................ 3 Operating Data Report - Unit No. 2............................................................................................................................4 Unit Shutdowns and Power Reductions - Unit No. 1.................................................................................................. 5 Unit Shutdowns and Power Reductions - Unit No. 2.................................................................................................. 6 Average Daily Unit Power Level - Unit No. 1.............................................................................................................. 7 Average Daily Unit Power Level - Unit No. 2.............................................................................................................. 8 Summary of Operating Experience - Unit Nos. 1 and 2............................................................................................. 9 Facility Changes That Did Not Require NRG Approval............................................................................................ 10 Procedure or Method of Operation Changes That Did Not Require NRG Approval................................................. 11 Tests and Experiments That Did Not Require NRC Approval.................................................................................. 12 Chemistry Report..................................................................................................................................................... 13 Fuel Handling - Unit Nos. 1 and 2............................................................................................................................ 14 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications....................................................................................................................... 15

1.
2.
3.
4.
5.
6.
7.

OPERATING DATA REPORT esurry Monthly Operating Report No. 98-09 Page 3 of 15 Docket No.:

Date:

50-280 10/03/98 Completed By:

D. L. Slade (757) 365-2246 Unit Name:............................................................

Reporting Period:..................................................

Licensed Thermal Power (MWt):..........................

Nameplate Rating (Gross MWe):..........................

Design Electrical Rating (Net MWe):....................

Maximum Dependable Capacity (Gross MWe):....

Maximum Dependable Capacity (Net MWe):........

Surry Unit 1 September, 1998 2546.

847.5 788 840 801 Telephone:

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe):

10.

Reasons For Restrictions, If Any:

This Month Year-To-Date Cumulative

11.

Hours in Reporting Period 720.0 6551.0 225935.0

12.

Hours Reactor Was Critical 720.0 5880.6 159906.4

13.

Reactor Reserve Shutdown Hours 0.0 0.0 3774.5

14.

Hours Generator On-Line 720.0 5847.9 157447.4

15.

Unit Reserve Shutdown Hours 0.0 0.0 3736.2

16.

Gross Thermal Energy Generated (MWH) 1825970.8 14821516.8 371066532.4

17.

Gross Electrical Energy Generated (MWH) 600803.0 4921551.0 121737305.0

18.

Net Electrical Energy Generated (MWH) 581033.0 4756497.0 115990718.0

19.

Unit Service Factor 100.0%

89.3%

69.7%

20.

Unit Availability Factor 100.0%

89.3%

71.3%

21.

Unit Capacity Factor (Using MDC Net) 100.7%

90.6%

65.9%

22.

Unit Capacity Factor (Using DER Net) 102.4%

92.1%

65.1%

23.

Unit Forced Outage Rate 0.0%

7.0%

14.5%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling, October 19, 1998, 35 Days

25.

If Shut Down at End of Report Period, Estimated Date of Start-up:

26.

Unit In Test Status (Prior to Commercial Operation):

FORECAST INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION ACHIEVED

1.
2.
3.
4.
5.
6.
7.

OPERATING DATA REPORT

&urry Monthly Operating Report No. 98-09 Page 4 of 15 Docket No.:

Date:

50-281 10/02/98 Completed By:

D. L. Slade (757) 365-2246 Unit Name:............................................................

Reporting Period:..................................................

Licensed Thermal Power (MWt):..........................

Nameplate Rating (Gross MWe):..........................

Design Electrical Rating (Net MWe):....................

Maximum Dependable Capacity (Gross MWe):....

Maximum Dependable Capacity (Net MWe):........

Surry Unit 2 September, 1998 2546 847.5 788 840 801 Telephone:

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe):

10.

Reasons For Restrictions, If Any:

This Month Year-To-Date

11.

Hours in Reporting Period 720.0 6551.0

12.

Hours Reactor Was Critical 720.0 6551.0

13.

Reactor Reserve Shutdown Hours 0.0 0.0

14.

Hours Generator On-Line 720.0 6551.0

15.

Unit Reserve Shutdown Hours 0.0 0.0

16.

Gross Thermal Energy Generated (MWH) 1829209.4 16654649.0

17.

Gross Electrical Energy Generated (MWH) 605630.0 5543410.0

18.

Net Electrical Energy Generated (MWH) 585785.0 5360681.0

19.

Unit Service Factor 100.0%

100.0%

20.

Unit Availability Factor 100.0%

100.0%

21.

Unit Capacity Factor (Using MDC Net) 101.6%

102.2%

22.

Unit Capacity Factor (Using DER Net) 103.2%

103.8%

23.

Unit Forced Outage Rate 0.0%

0.0%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None

25.

If Shut Down at End of Report Period, Estimated Date of Start-up:

26.

Unit In Test Status (Prior to Commercial Operation):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

, FORECAST ACHIEVED Cumulative 222816.0 157701.3 328.1 155684.5 0.0 368188216.3 120669018.0 115003832.0 69.9%

69.9%

66.0%

65.5%

11.5%

(1)

(2)

UNIT SHUTDOWN AND POWER REDUCTION (EQUAL TO OR GREATER THAN 20%)

REPORT MONTH: September, 1998 (3)

(4)

Method 41urry Monthly Operating Report No. 98-09 Page 5 of 15 Docket No.:

50-280 Unit Name:

Surry Unit 1 Date:

10/01/98 Completed by:

J. R. Pincus Telephone:

(757) 365-2863 (5)

Duration of LER No.

System Component Cause & Corrective Action Date Type Hours (1)

F:

Forced S:

Scheduled (4)

Reason Shutting Code Down Rx None During The Reporting Period (2)

REASON:

A -

Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & Licensing Examination F

Administrative G

Operational Error (Explain)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)

Code to Prevent Recurrence (3)

METHOD:

1 -

Manual 2 -

Manual Scram 3 -

Automatic Scram 4 -

Other (Explain)

(5)

Exhibit 1 - Same Source

(1)

Date Type 09/02/98 s

(1)

F:

Forced S:

Scheduled (4)

(2)

UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: September, 1998

.urry Monthly Operating Report No. 98-09 Page 6 of 15 Docket No.:

50-281 Unit Name:

Surry Unit 2 Date:

10/01 /98 Completed by: J. R. Pincus

  • Telephone:

(757) 365-2863 (3)

(4)

(5)

Method Duration of LER No.

System Component Cause & Corrective Action Hours 4.1 Reason B

(2)

REASON:

Shutting Down Rx N/A N/A A -

Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction Code SB E

Operator Training & Licensing Examination F

Administrative G

Operational Error (Explain)

Code to Prevent Recurrence V

Power reduced to perform 2-0SP-TM-001, Turbine Inlet Valve Freedom Test (3)

METHOD:

1 -

Manual 2 -

Manual Scram 3 -

Automatic Scram 4 -

Other (Explain)

(5)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)

Exhibit 1 - Same Source

J

&rry Monthly Operating Report No. 98-09 Page 7 of 15 AVERAGE DAILY UNIT POWER LEVEL MONTH:

September, 1998 Average Daily Power Level Day (MWe - Net) 1 807 2

808 3

808 4

756 5

810 6

809 7

807 8

809 9

812 10 814 j1 806 12 802 13 802 14 806 15 812 16 812 INSTRUCTIONS Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Docket No.:

50-280 Unit Name:

Surry Unit 1 Date:

10/03/98

  • Completed by:

J C. Steinert Telephone:

(757) 365-2837 Average Daily Power Level (Mwe - Net) 811 812 812 812 812 811 813 814 814 812 811 805 796 794 On this format, list the average daily unit power level in MWe - Netfor each day in the reporting month. Compute to the nearest whol.e megawatt.

tlmy Monthly Operating Report No. 98-09 Page 8 of 15 AVERAGE DAILY UNIT POWER LEVEL MONTH:

September, 1998 Average Daily Power Level Day 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 INSTRUCTIONS (Mwe - Net) 818 769 819 820 819 819 816 819 822 824 822 812 822 819 814 812 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Docket No.:

50-281 Unit Name:

Surry Unit 2 Date:

10/03/98 Completed by:

J.C. Steinert Telephone:

(757) 365-2837 Average Daily Power Level (Mwe - Net) 812 813 813 813 813 810 813 813 814 811 809 806 806 807 On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

e

SUMMARY

OF OPERA TING EXPERIENCE MONTHNEAR: September, 1998

.rry Monthly Operating Report No. 98-09 Page 9 of 15 The following chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in significant non~load related incidents.

UNJT0NE:

09/01/98 0000 09/28/98 0042 09/30/98 2400 UN1rTwo:

09/01/98 0000 09/02/98 0608 1600 09/30/98 2400 Unit operating at 100% power, 840 MWe.

Began cycle coast-down.

Unit operating at 97.2% power, 820 MWe.

Unit operating at 100% power, 845 MWe.

Power reduced to 71%, 620 MWe, to perform 2-0SP-TM-001, Turbine Inlet Valve Freedom Test.

Unit operating at 100% power, 845 MWe.

Unit operating at 100% pow'er, 842 MWe.

TM 82-98-004 FS98-014 TM 81-98-016 e

eurry Monthly Operating Report No. 98-09 Page 10 of 15 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR: September, 1998 Temporary Modification 09/10/98 (Safety Evaluation 98-078 Rev. 1)

Temporary Modification S2-98-004 was used to lift a lead and install a temporary cooling fan on the pressurizer proportional heater panel located in the upper cable vault. The temporary modification will be used to ensure that pressurizer proportional heaters do not reduce to a minimum output insufficient to maintain RCS pressure due to failure of one or both internal panel fans. Revision 1 will mechanically block the failed fan's flow switch, clear the locked-in Main control Room annunciator, and restore the alarm function from the running fan.

UFSAR Change Request (Safety Evaluation 98-091) 99/03/98 UFSAR Change Request FS.98-014 contains a list of several items that needed to be corrected or enhanced in the UFSAR sections that discuss Surry's Service Water System.

These changes were needed as a result of the Integrated Configuration Management Project and consist of editorial and technical changes/corrections.

Temporary Modification (Safety Evaluation 98-092) 09/10/98 Temporary Modification S1-98-016 will be used to inject well water in the Emergency Service Water Pump discharge pipe in an effort to establish low salinity levels at the pump impeller. A salinity meter will be placed in the pump suction near the impeller. This activity will be accomplished while the pump is out of service for scheduled cleaning while in a Technical Specification seven day clock.

e PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID Nor REQUIRE NRC APPROVAL MONTHNEAR: September, 1998 None During the Reporting Period Surry Monthly Operating Report No. 98-08 Page 11 of 15

e

&urry Monthly Operating Report No. 98-08 Page 12 of 15 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR: September, 1998 None During the Reporting Period

e.

Primary Coolant Analysis Gross Radioactivity, µCi/ml Suspended Solids, ppm Gross Tritium, µCi/ml 1131, µCi/ml.

113111133 Hydrogen, cc/kg Lithium, ppm Boron - 10, ppm*

Oxygen, (DO), ppm Chloride, ppm pH at 25 degree Celsius Boron - 10 = Total Boron x 0.196 Comments:

None CHEMISTRY REPORT MONTHNEAR: September, 1998 Unit No. 1 Max.

Min.

Avg.

4.23E-1 3.36E-1 3.82E-1 s 0.010 s 0.010 s 0.010 4.56E-2 2.18E-2 3.22E-2 2.40E-2 1.70E-3 5.40E-3 0.34 0.14 0.23 37.0 33.7 36.0 1.12 0.59 0.87 17.4 0.4 8.6 s0.005 s0.005 s0.005 0.002 so.001 so.001 9.78 7.47 8.21 aurry Monthly Operating Report No. 98-09 Page 13 of 15 Unit No. 2 Max.

Min.

Avg.

2.00E-1 1.26E-1 1.68E-1 0.025 0.025 0.025 6.73E-1 6.46E-1 6.65E-1.

1.44E-4 4.88E-5 8.68E-5 0.22 0.01 0.11 38.1 36.8 37.3 2.34 2.06 2.19 118.8 97.6 107.4 s0.005 s0.005 s0.005 0.003 so.001 0.002 7.01 6.74 6.84

New Fuel Shipment or Cask No.

FUEL HANDLING UNITS 1 & 2 MONTHNEAR: September, 1998 Number of Date Stored or Assemblies Received per Shipment Assembly Number ANSI Number None During the Reporting Period

-Surry Monthly Operating Report No. 98-08 Page 14 of 15 Initial Enrichment New or Spent Fuel Shipping Cask Activity

Ii

-rry Monthly Operating Report No. 98-08 Page 15 of 15 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTHNEAR: September, 1998 None During the Reporting Period