Monthly Operating Repts for Sept 1999 for Surry Power Station,Units 1 & 2.With 991012 Ltr
ML18152B353
Person / Time
Site: Surry  Dominion icon.png
Issue date: 09/30/1999
From: Grecheck E, Pincus J, Stief R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
99-515, NUDOCS 9910190174
Download: ML18152B353 (17)


Text

\ ...

e e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 October 12, 1999 United States Nuclear Regulatory Commission Serial No.99-515 Attention: Document Control Desk SPS Lic/JSA RO Washington, D.C. 20555 Docket Nos. 50 .. 2so 50-281 License Nos. DPR-32 DPR-37 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of September 1999 is provided in the attachment.

If you have any questions or require additional information, please contact us.

Very truly yours, E. S. Grecheck, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc: U.S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth Street, S. W.

Suite 23T85 Atlanta, Georgia 30303 Mr. R. )~.. Musser NRG Senio'r Resident Inspector Surry Power Station

, - - - ~ - - - - - - - ----- ~ - - - - - ~ - - ~ ~ - - - ~ ~ -

9910190174 990930 ~\

PDR ADOCK 05000280 R PDR

e VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 99-09 Approved:

e Surry Monthly Operating Report No, 99-09 Page2of16 TABLE OF CONTENTS Section Page Operating Data Report - Unit No. 1 ,,.,.,, .. ,,.,,,, ....... ,,,,.,,,,,,,, ...... ,,,,,, .... ,, ........ ,, ............ ,, ............ ., .... .,., .., ..,., ... ., .., ..... ,,. 3 Operating Data Report - Unit No. 2 ............................................................................................................................ 4 Unit Shutdowns and Power Reductions - Unit No. 1 .................................................................................................. 5 Unit Shutdowns and Power Reductions - Unit No. 2 .................................................................................................. 6 Average Daily Unit Power Level - Unit No. 1.............................................................................................................. 7 Average Daily Unit Power Level - Unit No. 2 .............................................................................................................. 8 Summary of Operating Experience - Unit Nos. 1 and 2 ............................................................................................. 9 Facility Changes That Did Not Require NRG Approval ............................................................................................ 11 Procedure or Method of Operation Changes That Did Not Require NRG Approval. ................................................ 12 Tests and Experiments That Did Not Require NRG Approval. ................................................................................. 13 Chemistry Report ..................................................................................................................................................... 14 Fuel Handling - Unit Nos. 1 and 2 ............................................................................................................................ 15 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications ....................................................................................................................... 16

--i I

\

Surry Monthly Operating Report No. 99-09 Page3of16 OPERATING DATA REPORT Docket No.: 50-280 Date: 10/04/99 Completed By: R. Stief Telephone: (757) 365-2486

1. Unit Name: ........................................................... Surry Unit 1
2. Reporting Period: ................................................. September 1999
3. Licensed Thermal Power (MWt): ......................... . 2546
4. Nameplate Rating (Gross MWe): ........................ . 847.5
5. Design Electrical Rating (Net MWe): ................... . 788
6. Maximum Dependable Capacity (Gross MWe): .. . 840
7. Maximum Dependable Capacity (Net MWe): ...... . 801
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-To-Date Cumulative

11. Hours in Reporting Period 720.0 6551.0 234695.0
12. Hours Reactor Was Critical 720.0 6551.0 167867.5
13. Reactor Reserve Shutdown Hours 0.0 0.0 3774.5
14. Hours Generator On-Line 720.0 6551.0 165322.4
15. Unit Reserve Shutdown Hours 0.0 0.0 3736.2
16. Gross Thermal Energy Generated (MWH) 1799574.0 16628598.5 390819556.0
17. Gross Electrical Energy Generated (MWH) 593552.0 5504514.0 128274670.0
18. Net Electrical Energy Generated (MWH) 573067.0 5309308.0 122295912.0
19. Unit Service Factor 100.0% 100.0% 70.4%
20. Unit Availability Factor 100.0% 100.0% 72.0%
21. Unit Capacity Factor (Using MDC Net) 99.4% 101.2% 66.8%
22. Unit Capacity Factor (Using DER Net) 101.0% 102.8% 66.1%
23. Unit Forced Outage Rate 0.0% 0.0% 13.9%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down at End of Report Period, Estimated Date of Start-up:
26. Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

e Surry Monthly Operating Report No. 99-09 Page 4 of 16 OPERATING DATA REPORT Docket No.: 50-281 Date: 10/04/99 Completed By: R. Stief Telephone: (757) 365-2486

1. Unit Name: ........................................................... Surry Unit 2
2. Reporting Period: ................................................ . September 1999
3. Licensed Thermal Power (MWt): ......................... . 2546
4. Nameplate Rating (Gross MWe): ........................ . 847.5
5. Design Electrical Rating (Net MWe): ................... . 788
6. . Maximum Dependable Capacity (Gross MWe): .. . 840
7. Maximum Dependable Capacity (Net MWe): ...... . 801
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-To-Date Cumulative

11. Hours in Reporting Period 720.0 6551.0 231576.0
12. Hours Reactor Was Critical 720.0 5409.8 165320.1
13. Reactor Reserve Shutdown Hours 0.0 0,0 328.1
14. Hours Generator On-Line 720.0 5285.9 163179.4
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1739569.7 12610918.6 386406567.6
17. Gross Electrical Energy Generated (MWH) 576420.0 4200535.0 126748428.0
18. Net Electrical Energy Generated (MWH) 556516.0 4051595.0 120873622.0
19. Unit Service Factor 100.0% 80.7% 70.5%
20. Unit Availability Factor 100.0% 80.7% 70.5%
21. Unit Capacity Factor (Using MDC Net) 96.5% 77.2% 66.7%
22. Unit Capacity Factor (Using DER Net) 98.1% 78.5% 66.2%
23. Unit Forced Outage Rate 0.0% 4.5% 11.1%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down at End of Report Period, Estimated Date of Start-up:
26. Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

-1 e Surry Monthly Operating Report No. 99-09 Page 5 of 16 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%}

REPORT MONTH: September 1999 Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 10/04/99 Completed by: J. R. Pincus Telephone: (757) 365-2863 (1) (2) (3) (4) (5)

Method Duration of LER No. System Component Cause & Corrective Action Date Type Hours Reason Shutting Code Code to Prevent Recurrence Down Rx 09/15/99 F 26H OM F N/A N/A N/A N/A Hurricane Floyd (1) (2) (3)

F: Forced REASON: METHOD:

S: Scheduled A - Equipment Failure (Explain) 1 - Manual B Maintenance or Test 2 - Manual Scram C Refueling 3 - Automatic Scram D Regulatory Restriction 4 - Other (Explain)

E Operator Training & Licensing Examination F Administrative G Operational Error (Explain)

(4) (5)

Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NU REG 0161)

e Surry Monthly Operating Report No. 99-09 Page6of16 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: September 1999 Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 10/04/99 Completed by: J. R. Pincus Telephone: (757) 365-2863 (1) (2) (3) (4) (5)

Method Duration of LER No. System Component Cause & Corrective Action Date Type Hours Reason Shutting Code Code to Prevent Recurrence Down Rx 09/11/99 s 58H 18M B N/A N/A FA FAN lsophase Bus Duct Fan Maintenance 09/15/99 F 33H 1M F N/A N/A N/A N/A Hurricane Floyd (1) (2) (3)

F: Forced REASON: METHOD:

S: Scheduled A - Equipment Failure (Explain) 1 - Manual B Maintenance or Test 2 - Manual Scram C Refueling 3 - Automatic Scram D Regulatory Restriction 4 - Other (Explain)

E Operator Training & Licensing Examination F Administrative G Operational Error (Explain)

(4) (5)

Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NU REG 0161)

e Surry Monthly Operating Report No. 99-09 Page7of16 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 10/04/99 Completed by: J. S. Ashley Telephone: (757) 365-2161 MONTH: September 1999 Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (MWe - Net) 813 17 814 2 803 18 816 3 812 19 817 4 812 20 816 5 810 21 817 6 810 22 818 7 810 23 818 8 809 24 817 9 809 25 817 10 803 26 815 11 809 27 814 12 809 28 814 13 810 29 814 14 806 30 814 15 771 16 363 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

e Surry Monthly Operating Report No. 99-09 Page 8 of 16 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 10/04/99 Completed by: J. S. Ashley Telephone: (757) 365-2161 MONTH: September 1999 Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (MWe - Net) 820 17 804 2 820 18 817 3 821 19 817 4 820 20 818 5 817 21 805 6 817 22 814 7 814 23 819 8 814 24 817 9 812 25 819 10 812 26 820 11 527 27 824 12 492 28 824 13 705 29 824 14 816 30 823 15 740 16 295 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

e Surry Monthly Operating Report No. 99-09 Page 9 of 16

SUMMARY

OF OPERATING EXPERIENCE MONTHNEAR: September 1999 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related incidents.

UNIT ONE:

09/01/99 0000 Unit started the month at 100% / 845 MWe.

09/10/99 0846 Commenced ramp down to perform 1-0SP-TM-001, Unit at 100% / 842 MWe.

09/10/99 0924 Stopped ramp, Unit at 91 % / 764 MWe.

09/10/99 1020 Commenced ramp up, Unit at 91 % / 764 MWe.

09/10/99 1200 Stopped ramp, Unit at 100% / 840 MWe.

09/15/99 2040 Commenced ramp down due to Hurricane Floyd, Unit at 100% / 846 MWe.

09/15/99 2320 Stopped ramp, Unit at 50% / 383 MWe.

09/16/99 0408 Commenced ramp down due to oscillating MWe output.

09/16/99 0410 Unit stable at 32% I 200 MWe.

09/16/99 1814 Commenced ramp up.

09/16/99 1948 Stopped ramp to perform 1-0PT-RX-001, Unit at 70% / 545 MWe.

09/16/99 1955 Recommenced ramp up.

09/16/99 2240 Unit at 100% / 842 MWe.

09/30/99 2400 Unit finished the month at 100% / 845 MWe.

UNIT Two:

09/01/99 0000 Unit started the month at 100% / 850 MWe.

09/10/99 0102 Commenced ramp down to repair 2-EP-F-GLC.

09/10/99 0347 Stopped ramp, Unit at 63% / 530 MWe.

09/13/99 0632 Commenced ramp up, Unit at 63% / 532 MWe.

09/13/99 0743 Stopped ramp for turnover, Unit at 81 % / 700 MWe.

09/13/99 0842 Recommenced ramp, Unit at 82% / 711 MWe.

09/13/99 1120 Unit at 100% / 842 MWe.

09/15/99 1906 Commenced ramp down due to Hurricane Floyd.

09/15/99 2320 Stopped ramp, Unit at 23% I 150MWe.

09/16/99 0130 Commenced ramp up to stabilize steam/feed flows.

09/16/99 0214 Stopped ramp, Unit at 35% / 267 MWe.

09/16/99 0904 Commenced ramp up, Unit at 36% / 270 MWe.

09/16/99 0921 Stopped ramp due to CP System DP. Unit at 39% / 315 MWe.

09/16/99 0933 Recommenced ramp.

09/16/99 1037 Stopped ramp, Unit at 46% / 330 MWe.

- Surry Monthly Operating Report No. 99-09 Page10of16

'UN'1~Two {c'ONT}:

09/16/99 1840 Ramped unit up from 45% to 50% power in preparation for starting the second main feed pump.

09/16/99 2201 Recommenced ramp up from 50% / 375 MWe.

09/16/99 2327 Stopped ramp at 70% / 600 MWe for calorimetric and turnover.

09/17/99 0030 Commenced ramp up from 70% / 600 MWe.

09/17/99 0355 Unit at 100% / 850 MWe.

09/30/99 2400 Unit finished the month at 100% / 850 MWe.

e Surry Monthly Operating Report No. 99-09 Page 11 of 16 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR: September 1999 FS99-028 UFSAR Change Request 09/01/99 (Safety Evaluation 99-083)

As a result of the Integrated Configuration Management Project review, UFSAR Change Request FS99-028 contains corrections and clarifications to the UFSAR sections that discuss Surry's Gaseous Waste Disposal System (GW). They include clarification of component activities, deletion of text describing use of the waste gas catalytic recombiner, and more precise characterization of equipment. These changes are to enhance accuracy and do not affect any GW system or structure, or any of its component's operation or performance.

FS99-035 UFSAR Change Request 09/23/99 (Safety Evaluation 99-087)

As a result of the Integrated Configuration Management Project review, UFSAR Change Request FS99-035 contains corrections and clarifications to the UFSAR sections that discuss Surry's nuclear instrumentation system. They include clarification of component activities, deletion of text associated with the automatic rod withdrawal blocking function, and more precise characterization of equipment. These changes are to enhance accuracy and do not affect any nuclear instrumentation system or structure, or any of its component's operation or performance.

FS99-038 UFSAR Change Request 09/23/99 (Safety Evaluation 99-088)

As a result of the Integrated Configuration Management Project review, UFSAR Change Request FS99-038 contains corrections and clarifications to the UFSAR sections that discuss Surry's feedwater, condensate, condensate polishing, and steam generator blowdown systems. They include clarification to improve readability, changes to reflect previous plant changes, and more precise characterization of equipment. These changes are to enhance accuracy and do not affect any feedwater, condensate, condensate polishing, or steam generator blowdown system or structure, or any of its component's operation or performance.

e Surry Monthly Operating Report No. 99-09 Page 12 of 16 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR: September 1999 1-ECM-2403-03 Electrical Corrective Maintenance Procedure 09/14/99 (Safety Evaluation 99-084)

Electrical Corrective Maintenance Procedure 1-ECM-2403-03, "RSS Transformer C Outage with Backfeed of Transfer Bus F" is used to re-position leads, jumpers and relays to support the backfeed lineup of the F Transfer Bus while taking the C Reserve Station Service Transformer out of service. This safety evaluation allows the modification to defeat automatic tripping of selected 4160 volt breakers associated with Transfer Bus F.

1/2-ICM-EP-CAB-002 Instrument Corrective Maintenance Procedures 09/27/99 (Safety Evaluation 99-090)

Instrument Corrective Maintenance Procedures 1/2-ICM-EP-CAB-002, "Placing Failed Channel of 4KV Underfrequency in Trip or Returning to Normal", were written to place a failed channel of 4KV Underfrequency circuitry in Trip in order to meet the requirements of Technical Specifications Table 3.7-1, Item 13 if a channel fails.

e .

Surry Monthly Operating Report No. 99-09 Page 13 of 16 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR: September 1999 None during the Reporting Period

e .

Surry Monthly Operating Report No. 99-09 Page14of16 CHEMISTRY REPORT MONTHNEAR: September 1999 Unit No. 1 Unit No. 2 Primary Coolant Analysis Max. Min. Ava. Max. Min. AvQ.

Gross Radioactivity, uCi/ml 4.04E-1 1.67E-1 2.71 E-1 2.49E-1 6.05E-2 1.66E-1 Suspended Solids, ppm < 0.010 < 0.010 < 0.010 < 0.010 < 0.010 < 0.010 Gross Tritium, uCi/ml 8.88E-1 6.08E-1 7.40E-1 5.03E-1 3.75E-1 4.48E-1 1131, uCi/ml 5.21 E-4 3.03E-4 4.03E-4  :::; 1.25E-4  :::; 5.85E-5  :::; 8.48E-5 113111133 0.09 0.06 0.07  :::; 0.41  :::; 0.11  :::;0.22 HydroQen, cc/ka 37.9 33.9 36.0 38.5 29.6 33.8 Lithium, ppm 2.34 1.96 2.18 2.30 1.97 2.16 Boron - 10, ppm* 135.04 106.04 118.46 234.02 198.74 213.62 Oxygen, (DO), ppm  :::;0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 Chloride, Pom 0.014 0.008 0.010 0.009 0.006 0.007 pH @ 25 deQree Celsius 7.05 6.82 6.92 6.70 6.44 6.53 Boron - 10 = Total Boron x 0.196 Comments:

None

e Surry Monthly Operating Report No. 99-09 Page15of16 FUEL HANDLING UNITS 1 & 2 MONTHNEAR: September 1999 New Fuel Number of New or Spent Shipment or Date Stored or Assemblies Assembly ANSI Initial Fuel Shipping Cask No. Received per Shipment Number Number Enrichment Cask Activity None during the Reporting Period

  • Surry Monthly Operating Report No. 99-09 Page16of16

~ ..

DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTHNEAR: September 1999 None during the Reporting Period