LER 82-006/03L-0:on 820207,power Range Nuclear Instrumentation Channel N 43 Indicated High & Then Became Erratic.Cause Not Given.Channel Returned to Normal During Operation.Instrumentation to Be Closely Monitored
ML20042A683
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 03/09/1982
From: Mooney J
CONSOLIDATED EDISON CO. OF NEW YORK, INC.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20042A678 List:
References
LER-82-006-03L, LER-82-6-3L, NUDOCS 8203230679
Download: ML20042A683 (3)


Text

U.S. NUCLEAR REGULATORY COMMISSION NRC FORM 166*

(7-7 7)'

  • - LICENSEE EVENT REPORT CONTROL BLOCx: l i

l l l l l lh o

(PLEASE PRINT OR TYPE ALL REOUIRED INFORMATION) loltllNlYlIlPlSl2l@l0D l-l 0l0l0l010l-l0l0l@l4l1l1l1l1l@l LICENSE NUV6Ee4 26 26 LICE *.SE TYPE 40 l

SI CA T bd l@

7 8 9 LICENSEE CODE 14 16 COWT loltl

'I 8

[n] l L60 ]@l 0 l 5 l 0 l 0 D l 2 l 4 l 763@l EVENT bl DOCK ET NUMBE R 68 0 l 2DATEl 01 718 l 2 @l 011 l n 80l 4 l 9 l ? l@

14 75 REPORT D ATE EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h 4 , # r, , I ITT2] l During normal start up omration it was obsn-vna ehne rewr mangn n,v in,r l 0 l 3 l l mentation channel N 43 indicated hich and then became erratic _ h channnl van l

ITTTI Iplaced in the tripped condition in accordance with Tech. Snec_ 3A Tho remnining l 0 l s i l five channels (3 power range and the 2 intermediate rance) were fully nnorneinn,1. I l

10161I I

10171 1 I

IO le l i 80 SYSTEM CAUSE CAUSE COMP. VALVE CODE CODE SUSCODE COMPONENT CODE SU8 CODE SU8 CODE

@ lI l A lh d@ l Al@ I Il Nl SI Tl RI Ul@ W@ (Z j @

12 13 18 19 20 7 8 9 to 11 RE VISION SEQUEN TI AL OCCURRENCE REPORT REPOR T NO. CODE TYPE NO.

LER/RO EVENT YEAR

@yR E,P= 1812l l-l 1010161 Ld 10131 I tl L _1 LaJ 24 26 27 28 29 30 31 32

_ 21 22 23

'N TK AC ON ON PL NT MET HOURS SB 1 FOR1 8. SUPPLIE MANUFACTURER l33Z [gl34Alg l35 Z lg lMZ [@

l0l0l0l0l 3/ 40 l Yl@

41 l d@ l Nl@ l Wl1 l 2 l Ol@

42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS l i l 0 l l During investigation of erratic operation, the channel returned to nnrm1 nmenHnn I i

i i l The attachment describes related events and corrective acHnnm I

ITTT1 I I

[TTTll I

Li_ 1.e.J l 80 7 8 9 SA S  % POWER OTHER STATUS SCO RY DISCOVERY DESCRIPTION l

W J@ l Q 0 l 2 l@l NA l l A l@l Control Pom Instrumentation A TIVITY CO TENT AMOUNT OF ACTIVITY LOCATION OF RELEASE EELE ASED OF RELE ASE Li_L68 ]9 1.Z.] @ 10l Z l@l11 NA l l m 80 l

7 44 45 PERSONNEL EMPOSUMES NUMBER TYPE DESCRIPTION y l 0l 0l0 l@ lZ l @l NA l

PERSONNE t iNauWiES NUMBER DESCRIPTION NA l 7

i a 8 9 l0 l 0l 0l@l 11 12 80 LOSS OF OH DAMAGE TO FACILITV TYPE DESCRIPTION l

8 lZ l@l NA 7 8 9 10 60 NRC USE ONLY ,

7 2 0 8 9

}5303230679820309 PDR ADOCK 0S000 b ..

68 69

, , , , , ; g,;;;;l 80 ;.

Jim Stxney 526-5181 E,

___ m PHONE:

2 .

ATTACHMENT I Docket No. 05000247 Consolidated Edison Co. of N. Y., Inc.

LER # 82-006-03L-0 Indian Point Station, Unit 2 NI CH43 Failures - Sequence Of Events Saturday, February 6, 1982 Plant at hot shutdown CH 43 indicated high. While no specific cause of the event was found, evidence indicated a possible problem with isolation amplifier NM 306 (output to OTDT protection system) .

This isolation amplifier was replaced with spare. Type N200-3 isolation amplifier manufactured by HYBRID SYSTEMS CORP.

Sunday, February 7, 1982 During normal start up at approximately 2% power CH 43 indicated high and then became erratic. While trouble shooting, the problem cleared up.

Monday, February 8, 1982 Plant at 100% Power, CH 43 indicated down scale - Nuclear.Instru-ment (NI) procedures were implemented and power was reduced to less than 70%. Problem was determined to be high voltage power, but specific cause could not be determined. Both H.V. power supply and cable / detector were separated and tested satisfactory. When restored to normal, channel was functioning properly. High voltage power supply replaced with spare manufactured by Power Designs Inc. Model (UPMD X 54W High Voltage Regulated DC Source

+ 300 to 1500 VDC 0-15MA)

A containment entry was made for a general inspection in the vicinity of the detector. No unusual conditions were observed.

Tuesday, February 9, 1982 Plant at 100% Power, CH 43 indicated up scale for a short duration then returned to normal. N.I. procedures implemented and power reduced to less than 70t; exact cause of failure could not be determined. Decision made to replace entire Drawer B Assembly.

Thursday, February 11, 1982 Plant at 100% Power CH 43 operation normal since 2/9/82. Replaced Drawer B Assembly. - DRG # 6051D53601 Date of Manufacturer 9/68 Contract NY 77207ARKN - Westinghouse Electric Corp. Nuclear Instrumentation and Control Department. Calibrated Drawer assemblies and returned channel to normal service.

h ..

Friday, February 19, 1982 Plant at 100% Power, CH 43 indicated a brief down scale spike. N.I.

procedures were implemented and power reduced. Channel problem was short in duration and exact cause'could not be determined. A test recorder was added'to monitor the H.V. power in order to detect any fluctuations of H.V. power.

Monday, February 22, 1982 Plant at 100% Power, during Surveilance tests, Technicians observed high voltage fluctuations when high voltage cable was moved. Re-working the high voltage Anphenol triaxial connector eliminated the fluctuations.

Thursday, March 4, 1982 Plant at 100% power - CH 43 experienced a momentary perturbation and immediately returned to normal operation.

The instrument continues to be closely monitored to assure proper operation.