ML20041E206

From kanterella
Jump to navigation Jump to search
Updated LER 81-004/03L-1:on 810119,during Surveillance Test PT-R35 Opening Time for One of Two Power Operated Relief Valves (PCV-456) Was 2.5-s Longer than Permitted.Caused by Nitrogen Supply Valve Inadvertently Closed.Valve Reopened
ML20041E206
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 02/24/1982
From: Matthew Smith
CONSOLIDATED EDISON CO. OF NEW YORK, INC.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20041E194 List:
References
LER-81-004-03L, LER-81-4-3L, NUDOCS 8203100245
Download: ML20041E206 (1)


Text